This Scope of Work document outlines New Mexico State University's (NMSU) request for proposals from qualified firms to develop a comprehensive Campus Design and Wayfinding Standards Manual. The project seeks to consolidate NMSU's existing Campus Design Guidelines and Campus Wayfinding and Signage Policy into a single, unified standards document that will establish clear requirements for planning, design, construction, renovation, maintenance, and lifecycle management of University facilities, infrastructure, site improvements, signage, and wayfinding systems. The Manual shall be practical, searchable, adaptable, and structured for use by NMSU staff, design consultants, contractors, vendors, maintenance personnel, and other project participants. The selected firm will conduct existing document reviews, gap assessments, stakeholder interviews, and workshops to identify missing or outdated requirements before developing comprehensive campus design standards addressing all applicable CSI MasterFormat construction divisions, building systems, site elements, and wayfinding components. The scope includes priority focus areas such as mechanical, electrical, plumbing, fire protection, controls, building automation, elevators, exterior materials, building envelopes, roofing, windows, doors, and equipment maintenance access. The deliverables include a Project Management Plan, Existing Conditions and Gap Assessment Report, Draft and Final Manual versions, CSI Division Coverage Matrix, Approved Systems and Products Matrix, project-phase review checklists, substitution and exception processes, wayfinding and signage standards package, governance recommendations, and editable electronic source files along with searchable PDF versions suitable for University-wide distribution.

The document does not specify pricing, contract term, renewal options, response dates, award dates, or bid submission deadlines. No set-aside provisions, incumbent contractors, funding sources, or budget amounts are identified in this Scope of Work. The project emphasizes coordination with NMSU's Integrated Campus Development Plan and various University departments including Campus Planning and Space Management, Project Development and Engineering, Facilities and Services, information technology, accessibility, procurement, safety, and marketing communications, though no specific contingency reserves or funding requirements are detailed.

View the file

Other files

File Type Posted
1466961-event.pdf PDF
Evaluation Criteria.pdf PDF
NMSU Standard Terms and Conditions UGC 2.21.24.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Development of the NMSU Campus Design and Wayfinding Standards Manual

1. Purpose New Mexico State University (“NMSU” or “University”) is seeking proposals from qualified firms to develop a complete, coordinated, and implementable NMSU Campus Design and Wayfinding Standards Manual (“Manual”).

The Manual shall replace and consolidate NMSU’s existing Campus Design Guidelines and Campus Wayfinding and Signage Policy into one University-wide standards document. It shall establish clear requirements for the planning, design, construction, renovation, repair, replacement, operation, maintenance, and life-cycle management of NMSU facilities, infrastructure, site improvements, interior environments, signage, and wayfinding systems.

The Manual will be used by NMSU staff, design consultants, contractors, vendors, maintenance personnel, and other parties involved in University projects. It shall be practical, searchable, adaptable, enforceable, and structured for routine use throughout project delivery and facility operations.

NMSU intends for the Manual to improve project consistency; reduce unnecessary variation in systems, materials, and finishes; support maintenance and operations; preserve institutional knowledge; establish clear review and approval expectations; reinforce campus identity; and provide a reliable basis for University quality control.

2. Background

NMSU maintains existing documents that provide guidance for campus design and signage. These documents require review, modernization, expansion, and consolidation into a single standards manual that reflects current campus needs, operational practices, building systems, maintenance capabilities, accessibility requirements, branding considerations, and long-term capital objectives.

The current wayfinding document includes a useful structure for sign hierarchy, sign types, visibility, placement, roadway signage, pedestrian signage, exterior-building signage, interior-building signage, definitions, and technical specifications. The new Manual shall retain the functional strengths of this format while refreshing the visual system and expanding its technical and implementation guidance.

NMSU is also undertaking an Integrated Campus Development Plan (“ICDP”) that will address broad campus planning, land use, infrastructure, mobility, landscape/open space, and capital-planning considerations. The selected firm shall coordinate with applicable ICDP direction but shall not duplicate the master-planning, facility-assessment, or capital-prioritization work being performed through that effort.

3. Project Objectives

The selected firm shall develop a Manual that:

• Establishes consistent, campus-compatible design and construction standards.

• Addresses all applicable construction divisions, facility systems, site elements, and wayfinding components.

• Supports NMSU’s climate, operational needs, deferred-maintenance realities, and maintenance resources.

• Identifies preferred products, systems, manufacturers, and performance standards where appropriate.

• Reduces inconsistent project-specific decisions and undocumented substitutions.

• Establishes durable, maintainable, repairable, and accessible standards.

• Provides clear expectations for testing, commissioning, training, warranties, spare parts, attic stock, record documents, and turnover.

• Creates a refreshed and integrated wayfinding system that supports campus navigation, institutional identity, safety, accessibility, and future campus growth.

• Provides practical tools that can be used by internal staff and external project teams at every stage of project delivery.

• Establishes governance and a sustainable process for future Manual administration, updates, exceptions, and approvals.

4. Scope of Services

The selected firm shall provide all professional services, personnel, coordination, research, workshops, field review, graphic design, technical writing, quality control, and deliverables necessary to produce the completed Manual.

4.1 Project Initiation and Management

The selected firm shall:

• Conduct a project kickoff meeting with NMSU.

• Prepare and maintain a detailed project schedule, communication plan, decision log, and document-review process.

• Identify the consultant team, project manager, technical discipline leads, wayfinding/signage lead, graphic-design lead, and key subconsultants.

• Establish a process for collecting, tracking, responding to, and incorporating NMSU comments.

• Participate in regular coordination meetings with NMSU throughout the project.

• Prepare meeting agendas, meeting summaries, action-item logs, and milestone-review materials.

4.2 Existing Document Review and Gap Assessment

The selected firm shall review available University documents and reference materials, which may include existing design guidelines; wayfinding and signage documentation; standard specifications; typical details; maintenance practices; procurement standards; relevant project documents; campus plans; branding guidance; accessibility guidance; facility-system information;

and other materials provided by NMSU.

The selected firm shall conduct stakeholder interviews, focus groups, workshops, field reviews, and/or site observations as necessary to understand existing conditions, recurring challenges, operational priorities, and opportunities for standardization.

The assessment shall identify:

• Missing, outdated, conflicting, duplicative, or unclear requirements.

• Construction divisions, systems, materials, products, or campus elements not adequately addressed by the existing documents.

• Campus systems, products, materials, and sign types that should be retained, standardized, improved, replaced, or phased out.

• Recurring operational, maintenance, warranty, repair, procurement, training, commissioning, and closeout concerns.

• Areas where a lack of standards has resulted in inconsistent project outcomes.

• Areas requiring standard product selections, performance criteria, approved systems, or clear review procedures.

• Opportunities to improve accessibility, durability, campus character, maintainability, life-cycle value, sustainability, and resilience.

• Recommended structure, organization, navigation, and implementation strategy for the

Manual.

The selected firm shall prepare an Existing Conditions and Gap Assessment Report for NMSU review before beginning full Manual development.

4.3 Campus Design Standards

The selected firm shall develop a comprehensive Campus Design Standards section within the Manual. The standards shall address all applicable CSI MasterFormat construction divisions and related campus systems, materials, products, assemblies, building components, infrastructure, and site elements.

The Manual may group related topics, use cross-references, or organize information in another logical format approved by NMSU. However, no applicable construction division, system, assembly, material category, product category, or campus element may be excluded solely because it is not included in existing NMSU documents.

For each applicable area, the selected firm shall develop standards that may include:

• Scope and applicability.

• Design intent and performance requirements.

• Applicable codes, regulations, and NMSU requirements.

• Preferred materials, finishes, equipment, manufacturers, product families, systems, and approved equals.

• System compatibility and integration requirements.

• Durability, maintainability, accessibility, climate resilience, life-cycle, repair, replacement, warranty, and service-access requirements.

• Requirements for installation, inspection, testing, commissioning, training, spare parts, attic stock, programming backups, closeout materials, warranties, as-built documents, and record documents.

• Standard details, drawings, diagrams, schedules, specifications, templates, and reference materials.

• Required University review points, responsible reviewers, documentation requirements, substitution procedures, and exception processes.

The Manual shall include appropriate standards for, at a minimum, the following categories, as applicable to NMSU:

• General requirements, project administration, substitutions, quality assurance, mockups, submittals, closeout, warranties, record documents, training, and turnover.

• Existing conditions, selective demolition, hazardous-material coordination, renovation, repair, and replacement practices.

• Concrete, masonry, metals, wood, plastics, composites, thermal and moisture protection, openings, finishes, specialties, equipment, furnishings, and special construction.

• Fire suppression, plumbing, HVAC, mechanical systems, controls, building automation, electrical systems, communications, electronic safety and security, electronic communications, and integrated building technologies.

• Fire alarm, life-safety, emergency communication, monitoring, testing, documentation, and campus-system compatibility.

• Elevators and vertical transportation, including equipment selection, controllers, monitoring, communication, cab finishes, serviceability, modernization, and replacement criteria.

• Civil/site work, utilities, roads, parking, paving, curbs, drainage, stormwater, landscape, irrigation, exterior lighting, site furnishings, fencing, screening, signage interfaces, and related campus improvements.

• Building-envelope systems, roofing, windows, doors, storefronts, exterior assemblies, façades, weather protection, colors, materials, finishes, and entry conditions.

• Interior architectural systems, public-area finishes, durable materials, accessibility, furniture coordination, room identification, and wayfinding interfaces.

• Energy, water, environmental, sustainability, resilience, and building-performance requirements, as directed by NMSU.

• Other applicable construction divisions and campus components identified through the gap assessment and stakeholder process.

The final Manual shall provide complete coverage. The relative level of detail may vary based on frequency of use, cost, maintenance impact, technical complexity, and risk; however, every applicable area shall receive sufficient standards direction to guide project teams and prevent unmanaged or inconsistent decisions.

4.4 Standards Priority Areas

NMSU anticipates that certain systems and components will require enhanced review and more detailed standards because of their operational, maintenance, cost, safety, or campus-wide compatibility impact. These priorities do not limit the full scope of the Manual.

The selected firm shall provide detailed recommendations and standards for:

• Mechanical, electrical, plumbing, fire protection, fire alarm, controls, building automation, power, communications, security, and technology systems.

• Elevators and vertical transportation.

• Exterior materials, building envelopes, roofing, windows, doors, storefronts, entries, and finishes.

• Campus utility interfaces and system compatibility.

• Equipment maintenance access, replacement planning, commissioning, staff training, warranties, spare parts, and turnover requirements.

• Standard systems, preferred product families, and approved alternatives.

• Project-specific exceptions, substitutions, and approval procedures.

4.5 Wayfinding and Signage Standards

The selected firm shall develop a fully integrated Wayfinding and Signage Standards section within the Manual. This section shall replace the existing wayfinding policy and function as an implementable design and technical standards resource.

The Wayfinding and Signage Standards shall retain the practical strengths of the current document, including a clear hierarchy of sign types; roadway, pedestrian, exterior-building, and interior-building sign families; visibility and placement guidance; sign definitions; and detailed sign specifications.

The selected firm shall evaluate, refresh, and develop standards for:

• Campus wayfinding strategy, hierarchy, nomenclature, message hierarchy, and user decision points.

• Campus arrival, gateways, vehicular navigation, roadway signs, parking signs, transit signs, pedestrian navigation, bicycle navigation, and accessible routes.

• Building identification, primary entrances, building directories, departmental identification, room and suite identification, interior directional signs, regulatory signs, temporary signs, event signs, construction signs, and emergency information.

• Color palette, typography, iconography, graphics, symbols, photography or illustration standards as applicable, and visual consistency with NMSU branding.

• Materials, fabrication, finishes, coatings, mounting, foundations, illumination, electrical requirements, digital displays, installation, repair, replacement, and maintenance.

• Sign visibility, viewing distance, placement, orientation, mounting heights, clearance, lighting, contrast, legibility, and message sequencing.

• Accessibility requirements, including tactile and Braille signs, visual contrast, mounting locations, accessible-route information, and applicable code compliance.

• Building names, room names, departmental names, recognition/naming interfaces, donor-recognition coordination, and naming-approval coordination.

• Digital wayfinding, interactive directories, maps, web-based or mobile interfaces, and coordination with campus technology systems, as directed by NMSU.

• Prototype sign drawings, sign-family design standards, message templates, location/placement diagrams, fabrication details, sample schedules, and technical specifications.

• Sign inventory, implementation priorities, replacement triggers, phased transition strategies, and lifecycle/maintenance expectations.

The standards shall be graphically clear and sufficiently detailed for use by NMSU staff, consultants, contractors, sign fabricators, and maintenance personnel without requiring project-by-project reinterpretation.

4.6 Implementation and Quality-Control Tools

The selected firm shall develop practical implementation tools that translate the Manual into consistent project requirements and reduce reliance on informal institutional knowledge.

At a minimum, the selected firm shall provide:

• CSI Division Coverage Matrix: A matrix identifying every applicable CSI MasterFormat division, corresponding Manual section(s), type of standards direction provided, responsible NMSU stakeholder(s), and reference documents.

• Approved Systems and Products Matrix: A searchable tool identifying preferred systems, manufacturers, product families, approved alternatives, compatibility requirements, project applicability, warranty expectations, and responsible University reviewers.

• Project Review Checklists: Checklists for programming, schematic design, design development, construction documents, bidding/procurement, submittals, construction, commissioning, closeout, and turnover.

• Substitution and Exception Process: A standardized process and form for evaluating substitutions, alternates, deviations, and exceptions, including required justification, supporting documentation, cost/life-cycle impacts, review authority, and approval records.

• Design and Construction Reference Tools: Standard details, sample specifications, schedules, templates, sign schedules, product data requirements, and other documents necessary to implement the standards.

• Closeout and Turnover Requirements: Standard expectations for commissioning, training, operation and maintenance materials, warranties, spare parts, attic stock, programming data, electronic files, as-built documents, and record documents.

• Governance and Update Framework: Recommended document ownership, approval authority, stakeholder roles, periodic review intervals, version control, revision processes, and communication procedures.

4.7 Coordination

The selected firm shall coordinate with NMSU personnel and stakeholder groups identified by the University. Anticipated participants may include representatives of the Director of Campus Planning and Space Management, Project Development and Engineering (PDE), Facilities and Services maintenance shops, utilities, information technology, accessibility, procurement, safety, housing, athletics, MarCom, and other appropriate departments.

The selected firm shall coordinate the Manual with relevant planning direction from the ICDP, including campus character, mobility, infrastructure, landscape/open-space, and future-development recommendations, as directed by NMSU. The ICDP includes planning frameworks related to land use, utilities/infrastructure, transportation, mobility, landscape, and campus identity; the Manual shall translate applicable direction into usable design and wayfinding standards without duplicating ICDP work.

5. Deliverables The selected firm shall provide the following deliverables, at a minimum:

1. Project Management Plan, schedule, stakeholder-engagement approach, meeting schedule, and decision log.

2. Existing Conditions and Gap Assessment Report, including findings, recommendations, proposed Manual organization, and identified standards priorities.

3. Proposed Manual Table of Contents and organization for NMSU review and approval.

4. CSI Division Coverage Matrix demonstrating complete coverage of applicable construction divisions and campus elements.

5. Draft NMSU Campus Design and Wayfinding Standards Manual for NMSU review.

6. Revised draft Manual incorporating NMSU comments.

7. Final NMSU Campus Design and Wayfinding Standards Manual, complete and ready for adoption and University-wide use.

8. Approved Systems and Products Matrix.

9. Project-phase review checklists, substitution/exception process, closeout/turnover templates, standard details, specification references, and associated implementation tools.

10. Wayfinding and Signage Standards package, including visual standards, sign hierarchy, sign-family prototypes, sign-placement guidance, fabrication/installation requirements, technical details, and sample schedules.

11. Recommended governance, ownership, review, exception, maintenance, update, and version-control process.

12. Editable electronic source files for all documents, drawings, graphics, schedules, templates, details, specifications, and matrices.

13. Searchable, accessible PDF versions of all final documents suitable for posting and University-wide use.