SOW.pdf

PDF 275 KB Posted

Attached to
P/N: 57211AB3BBCIMFN HYDRAULIC POWER UNIT Qty 1/ea
Solicitation number
80NSSC26942753Q
Issued by

About this file

This is a Specification Sheet/Statement of Work for the procurement of a new Tronair Hydraulic Power Unit for Project X-59. The requirement specifies the exact model 57211AB3BBCIMFN with the notation that equivalent models must include all required options. The unit must be NASA Q-1C compliant and meet specific performance specifications including 60Hz operation at 34 gpm and 129 lpm, 50Hz operation at 28 gpm and 107 lpm, 4000 psi (276 bar) pressure rating, 75 horsepower (56 kW), and compliance with MIL-PRF-83282 and CE standards. The power cord must be a minimum 50 feet in length with 460V, 60Hz, three-phase specifications. No color requirements are specified.

The unit must include all additional required options: 50-foot hoses configured as a split system, voltage monitor, 60Hz electric fill pump, towing/trailer package, and return back-pressure capability. Quick disconnect hydraulic couplings are required. Delivery is required to NASA Armstrong Flight Research Center, Building 4876 Warehouse #6, Lilly Drive, Edwards, California 93524, with a delivery deadline of October 1, 2026. For freight shipments, coordination must occur 4 business days in advance to ensure proper entry authorization into Edwards Air Force Base, and an AFRC visitor request may be required.

View the file

Other files

File Type Posted
Q-1B.pdf PDF
RFQ.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SPEC SHEET/ STATEMENT OF WORK

1. Objective/Requirements Purchase of New Tronair Hydraulic Power Unit Model# 57211AB3BBCIMFN for Project X-59. Equivalent models must include all options.

NASA Q-1C Required

2. Characteristics, Scope, and Specs

57211AB3BBCIMFN

Hydraulic Power Unit Qty 1 EA Additional Specs 60hz gpm 34 Ipm 129

50 hz gpm 28 Ipm 107 psi 4000 bar 276 hp 75 kW 56

MIL-PRF-83282

CE Compliant No Color requirements Quick Disconnect (Hydraulic Couplings) Power Cord – 50 Ft min.

Voltage 460V Freq 60Hz Phase 3PH

Additional Required Options 50 Ft Hoses (Split System) Split System = Voltage Monitor 60Hz Electric fill pump Towing/trailer package Return back-pressure

3. Place of Performance or Delivery Location NASA Armstrong Flight Research Center Bldg 4876 Warehouse #6, Lilly Drive Edwards, CA 93524

4. Period of Performance or delivery date/need by date required Needed not later than 10-1-2026

Freight Delivery requirements, if applicable. – *If FREIGHT shipment is required, it needs to be coordinated 4 business days in advance to ensure the delivery driver has proper entry into Edwards Air Force Base. An AFRC visitor request may need to be submitted.

File details come from the government source that posted it. Updated .