Summary: Specification Sheet/Statement of Work Q2760230 J1318 MOF3 Upgrade

This Specification Sheet/Statement of Work outlines NASA's procurement for new Microchip 9611B Timing Switch & Distribution System units from Elotek Systems Inc. to expand and sustain the existing DATR System timing infrastructure at NASA Armstrong Flight Research Center in Edwards, California. The contractor must furnish new, commercially available Microchip 9611B units that meet all original equipment manufacturer (OEM) specifications and are fully compatible with the Government's existing timing equipment. The equipment must provide reliable, high-precision timing signal switching and distribution capabilities with seamless integration into the current timing architecture without requiring modifications to existing hardware or software.

The contractor's scope of work is limited to acquisition and delivery of the specified equipment, including all required hardware, power supplies, accessories, cables, documentation, and standard warranty. The contractor must ensure all equipment is fully operational upon delivery and provide all standard manufacturer documentation and operating manuals. Delivery shall be made to NASA Armstrong Flight Research Center, Edwards, CA 93523, coordinated with the Contracting Officer's Representative. The period of performance begins upon contract award and continues through final delivery and Government acceptance, with delivery to be completed within a timeframe to be determined (TBD) by the Contracting Officer. Installation, configuration, engineering services, and operational testing by the contractor are not required unless authorized by the Contracting Officer. Performance completion requires delivery of all equipment, Government inspection and acceptance, and receipt of all required documentation.

View the file

Other files

File Type Posted
Q-1B.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SPEC SHEET/ STATEMENT OF WORK

Q2760230 J1318 MOF3 Upgrade

1. Objective/Requirements

The objective of this procurement is to acquire Microchip 9611B Timing Switch & Distribution System units from Elotek Systems Inc. to support the expansion and sustainment of the existing DATR System timing infrastructure. The equipment shall provide reliable, high-precision timing distribution and integrate seamlessly with the current timing architecture without requiring modifications to existing hardware or software.

The contractor shall provide new, commercially available Microchip 9611B Timing Switch & Distribution System units that meet all manufacturer specifications and are fully compatible with the Government's existing timing equipment.

The contractor shall:

Furnish new Microchip 9611B Timing Switch & Distribution System units.

Ensure all equipment is fully operational upon delivery.

Provide all standard manufacturer documentation, operating manuals, and applicable warranty information.

Deliver equipment in accordance with the specified delivery schedule.

2. Characteristics, Scope, and Specs

The contractor shall provide Microchip 9611B Timing Switch & Distribution System units that meet the following minimum requirements:

Manufacturer: Microchip Technology Model: 9611B Timing Switch & Distribution System Compatible with the existing DATR System timing infrastructure.

Provides precise timing signal switching and distribution capabilities.

Supports interoperability with existing Government-owned timing equipment.

Meets all original equipment manufacturer (OEM) performance specifications.

Includes all required hardware, power supplies, accessories, cables (if applicable), documentation, and standard warranty necessary for normal operation.

The scope of this procurement is limited to the acquisition and delivery of the specified equipment. Installation, configuration, engineering services, and operational testing by the contractor are not required unless otherwise authorized by the Contracting Officer.

3. Place of Performance

The contractor shall deliver all equipment to:

NASA Armstrong Flight Research Center Edwards, CA 93523

Delivery shall be coordinated with the Contracting Officer's Representative (COR) or designated Government point of contact. All shipments shall be packaged to prevent damage during transportation.

4. Period of Performance

The period of performance shall begin upon contract award and continue through final delivery and Government acceptance of all required equipment.

Unless otherwise specified by the Contracting Officer, delivery shall be completed within TBD after contract award.

Performance shall be considered complete upon:

Delivery of all required equipment.

Government inspection and acceptance.

Receipt of all required documentation, including manufacturer's manuals and warranty information.