This is a Statement of Work (SOW) for the design and installation of a propane-fueled heating system for a fire building at the Rachel Carson National Wildlife Refuge in Wells, Maine. The U.S. Fish and Wildlife Service seeks a contractor to design and install a complete, reliable, and efficient heating system for a newly constructed 40'W x 60'L pre-engineered metal building that includes three 12'x12' garage doors, two man doors, and five windows. The building is insulated with closed-cell spray foam and requires heating capable of accommodating high air-exchange areas due to the large garage doors in a coastal Maine winter environment.
The contractor must perform heat load calculations, determine appropriate heater sizing and quantity, and develop layouts for heaters, ductwork, gas piping, and venting. The heating system shall utilize either forced air propane heaters or infrared tube heaters based on usage and ceiling height. The propane system installation requires coordination with a licensed propane supplier to install external propane storage tank(s) of at least 500 gallons, underground or protected above-ground gas lines, and pressure regulation and shut-off valves compliant with NFPA 58 and Maine Fuel Board regulations. All work must comply with Maine Fuel Board codes, NFPA 58, manufacturer's installation instructions, federal and state regulations, and local coastal building codes including wind and corrosion resistance. The contractor must obtain all required permits, conduct startup and commissioning of all heating equipment, verify safe propane operation and exhaust systems, train the owner/operator on thermostat settings and maintenance, and submit manufacturer's technical data, installation instructions, and warranty information to the Contracting Officer, FWS Fire Program Manager Christopher McCandless, and Project Engineer Brian Waz. The government anticipates a firm-fixed-price award in August 2025, with project completion required within 45 calendar days of the Notice to Proceed.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140FGA26Q0008.pdf | ||
| Notice_to_Offerors.pdf | ||
| DOL_Wage_Determination.pdf | ||
| Price_Schedule.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. Fish and Wildlife Service – RCNWR 1 of 3 SOW – Fire Building Heating System
STATEMENT OF WORK
Fire Building Heating System
PART 1 - PROJECT OVERVIEW
A. NOTICES
1. Project Information
Project Title: Heating System for Fire Building
Location: U.S. Fish & Wildlife Service Rachel Carlson National Wildlife Refuge 429 Post Road Wells, ME 04090
Contracting Officer (CO): TBD
Project Engineer / Contracting Brian Waz, 413-253-8605 Officer’s Representative (COR):
FWS Facilities Manager: Spencer Goodrich, 978-518-9739, spencer_goodrich@fws.gov
FWS Fire Program Manager: Christopher McCandless, 207-849-6793, christopher_mccandless@fws.gov
2. Project Overview
Design and install a complete reliable and efficient propane-fueled heating system for a newly constructed 40’W x 60’L pre-engineered metal building (PEMB). The structure includes three (3) 12'x12' garage doors, two
(2) man doors, and five (5) windows (Refer to Appendix 1: Photographs). The heating system will be designed to ensure consistent, safe, and efficient indoor heating throughout the winter months in coastal Maine. The system shall accommodate high air-exchange areas due to large garage doors.
B. PROJECT DETAILS
1. Contract Work:
This Contract is to design and install propane-fueled heating system. The following system requirements are required but not limited too based on the design.
Heating Type: Forced air propane heater(s) or infrared tube heaters (based on usage and ceiling height).
Fuel Supply: Exterior propane tank(s) with regulators sized for demand.
Ventilation: Proper flue gas exhaust and fresh air intake as required.
Thermostatical Control: Programmable thermostat for zone control.
Combustion Air: Ducted or louvered openings for safe operation.
Freeze Protection: Heat to prevent water carrying equipment from freezing.
The work shall comply with all industry standard best practices, regulations, and materials.
U.S. Fish and Wildlife Service – RCNWR 2 of 3
2. Heating System Design:
Perform heat load calculations based on building size, insulation (closed-cell spray foam), window/door count, and use case.
Determine appropriate heater sizing and quantity.
Develop layout for heaters, ductwork (if applicable), gas piping, and venting.
3. Propane System Installation:
Coordinate with licensed propane supplier to install:
o External propane storage tank(s) sized for building usage (minimum 500-gallon recommended).
o If concrete pad is required for propane tank, the government will supply.
o Trenching and installation of underground or protected above-ground gas lines to building.
o Pressure regulation and shut-off valves per NFPA 58 and Maine Fuel Board regulations.
Include tie-in to building heating system and required leak/pressure testing.
4. Code Compliance and Permitting:
Obtain and comply with all local and state permits, including mechanical, propane fuel system, and electrical (if applicable).
All work must comply with:
o Maine Fuel Board codes o NFPA 58 (Liquefied Petroleum Gas Code) o Manufacturer’s installation instructions o Federal, state, and local regulations.
o Local coastal building codes (if any), including wind and corrosion resistance.
5. Testing, Commissioning, and Training:
Start up and commission all heating equipment.
Verify complete and safe propane operation, combustion air, and exhaust systems.
Train owner/operator on thermostat settings, safety shut-offs, and propane system maintenance.
6. Project Submittals:
The following information is required from the Contractor, but not limited to:
Manufacturer’s Technical Data and Specifications Manufacturer’s Installation Instructions Warranty information
Submittals shall be emailed to the following:
Contracting Officer (CO): TBD
FWS Fire Program Manager: Christopher McCandless, 207-849-6793, christopher_mccandless@fws.gov
Project Engineer / Contracting Officer’s Representative (COR): Brian Waz, brian_waz@fws.gov, (413)-253-8605
7. Anticipated Award Period / Contract Type:
The Government anticipates a firm-fixed priced award of this contract in August 2025.
U.S. Fish and Wildlife Service – RCNWR 3 of 3
8. Completion Date:
The project shall be completed and commissioned no later than 45 calendar days from the Notice to Proceed issued by the Contracting Officer.
APPENDIX 1:
Photographs
40’W x 60’L Fire Building
Photo #1: View of front of the building.
Photo #2: Side/back view of building.
Photo #3: Interior view of left wall.
Photo #4: Interior view of right wall.
| SOW - RCNWR - Fire Building Heating System.pdf |
| APPENDIX 1 |
File details come from the government source that posted it. Updated .