SOW.pdf
PDF 162 KB Posted
- Solicitation number
- HT941026Q2000
- Issued by
-
Defense Health Agency
About this file
This Performance Work Statement (PWS) outlines service and maintenance requirements for water treatment systems at the Naval Medical Center San Diego (NMCSD) Ophthalmology Department. The contract covers maintenance of an AmeriWater Reverse Osmosis (RO) Water Treatment System and VIQUA Ultraviolet (UV) Water Disinfection System, with comprehensive service responsibilities including routine inspections, preventive maintenance, corrective maintenance, and water quality monitoring. Key requirements include performing quarterly system sanitation, replacing components per manufacturer recommendations, maintaining service logs, and ensuring water quality meets AAMI ST-108 standards for critical water used in ocular instrumentation reprocessing.
The contractor must provide 24/7 telephone consulting, respond to maintenance requests within two hours, and perform on-site support within 24 hours. They are responsible for all parts, labor, and equipment maintenance at no additional cost, with specific tasks including carbon block filter replacement, membrane inspection, UV lamp replacement, and comprehensive water quality testing. The contract mandates strict compliance with safety regulations, base access requirements, and federal, state, and local laws. The contractor must carry liability insurance of at least $500,000 per occurrence and property damage liability insurance, with all work subject to government oversight and potential rejection of service personnel.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Combined Synopsis HT941026Q2000.pdf | ||
| HT9410-26-Q-2000_Past_Performance_Questionnaire.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DHA PWS Template V13 November 16, 2021
Department of Defense Defense Health Agency
Statement Of Work
Service and Maintenance for AmeriWater Reverse Osmosis (RO) Water Treatment System and VIQUA Ultraviolet (UV) Water Disinfection System
Directorate of Surgical Services Main Operating Room (ROM)
Statement of Work
Preventive Maintenance for Ophthalmology Water Treatment System
1. Scope: The Contractor shall provide all services, labor, parts, materials, and equipment necessary for the service and maintenance of the AmeriWater Reverse Osmosis (RO) Water
Treatment System and VIQUA Ultraviolet (UV) Water Disinfection System located in the
Ophthalmology Department at Naval Medical Center San Diego (NMCSD).
Contractor shall service and maintain the equipment within the original equipment manufacturers
(OEM) specifications, and in accordance with US, State, and Local laws and regulations, US
Navy regulations, Joint Commission requirements, and Association for the Advancement of
Medical Instrumentation (AAMI) standards for critical water systems.
2. Definitions: As used throughout this work statement, the following terms shall have the meaning set forth below:
2.1. Service and maintenance: (a) any modification, adjustment, or replacement of the equipment that corrects a malfunction and effectively brings the equipment into material conformity with the technical specification for that equipment as designated by the original equipment manufacturer (OEM), (b) a procedure or routine that, when observed in the regular, proper operation of the equipment, avoids the material adverse effect of the applicable nonconformity,
(c) any measures performed that assure the continued operation of the equipment or returns the equipment to its designed efficiency and capacity, (d) replacement of a piece of equipment on a one-for-one basis in order to provide a substitute of equal or greater value in lieu of a damaged or defective device for compensation, return, or refund of equipment.
2.2. Contracting Officer (KO): A warranted representative of the federal government who has the express authority to enter into, administer, and/or terminate contracts and make related determinations and findings. The KO is the only person authorized to approve changes to any terms, conditions, or requirements of the contract.
November 16, 2021
2.3. Technical Representative (TR): A Government employee appointed by the KO and responsible for the inspection, evaluation, and acceptance of products and services provided in accordance with the terms and conditions of the contract.
3. Location:
Places of performance shall be:
Naval Medical Center San Diego
Ophthalmology Department
Building 2, 2nd Deck
34800 Bob Wilson Drive
San Diego, CA 92134-5000
4. Requirements:
4.1. General Performance Requirements:
4.1.1. The Contractor shall provide maintenance services to include all periodic planned maintenance in accordance with Original Equipment Manufacturer (OEM) specifications and in compliance with ISO 9001 standards.
4.1.2. The Contractor may use third party service vendors not limited to the Original Equipment Manufacturer (OEM), however, these vendors must be approved in advance by the KO and TR.
The Contractor must submit a list of any sub-contractors they intend to use as third-party service vendors to the KO and TR for approval. Third party service vendors shall not perform any work under this contract prior to such approval.
4.1.3. Ensure that only fully qualified field engineers and/or technicians shall be employed in the performance of any and all work performed under this contract. Service personnel shall have sufficient experience to demonstrate proficiency in maintenance of the product. Upon request, Contractor shall provide written assurance of the competency of their personnel as well as a list of credentials for their personnel. The KO and/or TR may authenticate the training requirements and request training certificates or credentials from the service vendors at any time.
4.1.4. Test equipment: Test equipment calibration shall be traceable to National Institutes of Standards and Technology (NIST). Any efforts conducted without equipment within the calibration intervals is not performance in accordance with this contract. Upon request by TR, November 16, 2021 the Contractor and/or service vendors shall provide a copy of the current calibration certification of all test equipment to be used, or which has been used, on NMCSD equipment.
4.1.5. Field Service Reports: Contractor shall furnish a written or electronic vendor supplied Field Service Report (FSR) to DSS Logistics at NMCSD. All FSR's shall be submitted within 72 hours of completion of service. The Contractor or their representative shall complete the FSR to include, at a minimum, the following:
1. Contractor Name
2. Service personnel printed name, telephone number, and signature
3. Date and Time of Arrival
4. Time Expended Repairing/Service: Labor Hours, Rate, Materials
5. Summary of Work Performed and Accepted by End-User, with Government
Representative's Printed name and Signature.
Field Service Reports will be sent to the following:
BIOMED
619-532-8010
USN.SAN-DIEGO.NAVMEDCENSANCA.MBX.NMCSD-CONTRACTADMINISTRATOR@
HEALTH.MIL
NMCSD Ophthalmology
619-532-6700
Completed Field Service Reports are required prior to acceptance of any invoice. Failure to submit a Field Service Report can result in delay of payment or rejection of invoice from
Government. It is highly recommended that the Contractor attach a copy of the Field Service Report to their Wide Area Workflow Invoice in order to expedite invoicing process.
4.2. NMCSD Preventive Maintenance Requirements:
4.2.1. Preventive maintenance shall be performed in a manner which will minimize corrective maintenance and will include but is not limited to: full system sanitation and flush, calibration, adjustment, lubrication, updating software for security, safety, or system functionality issues, testing required to maintain a safe environment of care, electrical safety testing, output testing, replacement of filters, and other shelf-life components on a scheduled basis (which becomes corrective maintenance if the component fails due to lack of preventive maintenance).
November 16, 2021
4.2.2. Make repairs to the extent necessary, as determined by inspection tests or disassembly, to ensure a functional system that will efficiently serve its intended purpose and the technical specification for that equipment as designated by the original equipment manufacturer.
4.2.3. Installation of system update changes to resolve specific product reliability problems.
Hardware and software upgrades, defined as those changes that enhance or add product features, are not included.
4.2.4. Preventive Maintenance shall be performed as per the schedule noted in section 4.4., with these scheduled preventive maintenance actions to be coordinated with NMCSD Ophthalmology Department after contract award.
4.2.5. Preventive Maintenance Completion: Contractor must ensure that 100% of periodic maintenance is performed within two (2) calendar days of the due date.
4.2.6. Equipment in Use: If, for reasons beyond the Contractor’s control, equipment is not made available for maintenance, the Contractor shall immediately notify the TR. Contractor shall arrange a means of complying with the requirements for preventive maintenance at no additional cost to the government.
4.3. NMCSD Corrective Maintenance Requirements:
4.3.1. Correct inoperable condition(s) in a timely manner. Contractor shall respond to corrective maintenance requests no later than two (2) hours after telephone notification from NMCSD Ophthalmology Department.
4.3.2. Provide only the work necessary to restore the equipment to a properly serviceable/operating condition by adjustments, replacement parts, or minor repairs when it is determined that extensive repairs and parts are not necessary.
4.3.3. Equipment improvements/modifications shall be made only upon written approval and direction. This includes software updates to the device. All updates, improvements, or modifications performed shall be notated on the field service report or equivalent.
4.3.4. Notify NMCSD Ophthalmology Department immediately upon receipt of safety recall notices or upon discovery of any other safety hazard discovered during the performance of work.
4.3.5. Ensure that the original design and functional capabilities shall not be changed, modified, or altered without express written authorization from NMCSD.
4.3.6. Provide suitable recommended repair equipment/tools required for the satisfactory execution of all repairs made.
4.3.7. Replacement parts shall be covered by the Contractor for the duration of the contract.
4.4. End-User Requirements:
November 16, 2021
4.4.1. Contractor shall perform an initial inspection of the AmeriWater Reverse Osmosis (RO) Water Treatment System and VIQUA Ultraviolet (UV) Water Disinfection System and provide any and all necessary maintenance requirements identified at that time. This includes, but is not limited to, any items necessary for the proper function of the reverse osmosis water treatment system and UV water disinfection system. Additionally, the contractor shall perform an initial sanitation/flushing of the whole reverse osmosis water treatment system followed by water quality testing to ensure that system is functioning properly.
4.4.2. Contractor shall provide routine inspections of the reverse osmosis (RO) water treatment system to ensure proper function and effectiveness for the intended task of supplying high quality, low conductivity critical water suitable for use in the reprocessing of ocular instrumentation, in accordance with AAMI standards for critical water (AAMI ST 108).
4.4.3. Contractor shall maintain service logs for the water treatment system and keep one copy on site at NMCSD Ophthalmology Department. Contractor may, at their choosing, retain an additional copy, but the primary copy shall be retained by NMCSD Ophthalmology Department.
4.4.4. Contractor shall provide service and maintenance for following items. These materials and items shall be provided for as part of the services and maintenance contract at no additional charge to the Government.
a. Carbon Block Filter Cartridges - routine inspection and replacement per manufacturer’s recommendations. Replace at a differential pressure of fifteen (15) psi or every three (3) months.
b. ROS Membrane(s) – routine inspection and replacement per manufacturer’s recommendations. Monitor the Product Flow and Quality. Clean or Replace as needed.
c. PT401 Antiscalant/Scale Inhibitor - routine inspection and replacement/refill per manufacturer’s recommendations.
d. PAA Sanitant - routine inspection and replacement/refill per manufacturer’s recommendations.
The water treatment system should be disinfected at least quarterly.
e. DI Polisher Resin Pack - routine inspection and replacement per manufacturer’s recommendations. Replace when the light changes from green to red.
f. Ion Exchange Pack - routine inspection and replacement per manufacturer’s recommendations.
Replace when the light changes from green to red.
g. Storage Tank/Water System Plumbing - routine inspection, sanitation/cleaning/flushing per manufacturer’s recommendations. The system should be disinfected at least annually.
h. Distribution Pump - routine inspection and service/maintenance per manufacturer’s recommendations.
November 16, 2021
i. UV Water Disinfection System - routine inspection and maintenance per manufacturer’s recommendations. Replace UV lamp every 9,000 hours or annually. Replace Quartz Sleeve as required.
j. Air filters – routine inspection and replacement per manufacturer’s recommendations.
Other items including, but not limited to: filters, membranes, pumps, tanks, test ports, and any other items necessary for the proper function of the reverse osmosis water treatment system and UV water disinfection system.
4.5. Feedwater: Feedwater will be supplied by Government to the water treatment system.
However, Contractor shall inspect feedwater supply (pipes, valves, etc.) as part of the routine service and maintenance. Additionally, Contractor shall test feedwater routinely to ensure compatibility with water treatment system manufacturer’s requirements, to include water pressure, temperature, and pH. If problems are detected in feedwater or its components, Contractor shall notify the Ophthalmology Department and shall provide a report of their findings to the TR and NMCSD Facilities Department.
4.4.6. Replacement of Water Pump: Contractor shall provide a replacement water pump for the water treatment system if the pump should run into faults or otherwise fail to perform correctly.
Contractor shall provide one (1) high-duty cycle water pump suitable for reverse osmosis system usage, and capable of twenty-four (24) hour continuous operation for at least one (1) full year.
Old pump shall be de-installed and disposed of by the Contractor. Contractor shall install the new pump at no additional charge to the Government.
4.4.7. Ultraviolet (UV) Water Disinfection System (VIQUA model VH410): Contractor shall provide service and maintenance for the VIQUA Ultraviolet (UV) Water Disinfection System per the manufacturer’s recommendations. The Contractor shall replace the UV lamp annually or if the lamp should run into faults or otherwise fail to perform correctly. The UV lamp shall be a genuine factory supplied VIQUA replacement lamp suitable for reverse osmosis water treatment system usage, and capable of twenty-four (24) hour continuous operation for at least one (1) full year. The old lamp shall be de-installed and disposed of by the Contractor. The UV lamp shall be replaced every 9,000 hours or annually. The UV lamp Quartz Sleeve has the potential to form minerals from the water source. If this occurs, the sleeve shall be replaced, not cleaned with chemicals, to prevent contaminating the water supply. The Contractor shall inspect and replace the Quartz Sleeve as needed. The UV Sensor shall be cleaned at the same time the quartz sleeve is replaced. The Contractor shall perform sanitation/flushing of the water treatment system if the UV disinfection system is shut down for service, without power, or inoperative for any reason.
4.4.8. Sanitation: Contractor shall provide sanitation/flushing of the whole reverse osmosis water treatment system in conjunction with the service and maintenance contract. Scheduled routine
November 16, 2021 sanitation/flushing of the water treatment system shall be performed quarterly per the manufacturer’s recommendations. Additionally, the Contractor shall provide immediate sanitation/flushing of the water treatment system within three (3) calendar days of verbal request from the Ophthalmology Department at no additional charge to the Government. The sanitation process must also be performed if the UV disinfection system is shut down for service, without power, or inoperative for any reason.
4.4.9. Water Quality Monitoring: Contractor shall provide water testing and monitoring in conjunction with the service and maintenance contract. Water shall be tested in accordance with AAMI ST-108 guidelines. Water samples shall be taken from multiple test ports within the water treatment system to ensure proper functioning of different system components. Water quality testing shall be performed monthly at a minimum; however, additional water samples may be requested by the Ophthalmology Department as needed at no additional charge to the Government. An electronic copy of the lab results must be delivered to the points of contact identified in section 4.1.5. Lab results shall be delivered within seven (10) calendar days of the sampling date. Water quality monitoring shall include at a minimum, testing for the following:
- Hardness
- pH
- Total Alkalinity
- Bacteria
- Endotoxin
- Conductivity
- Total organic carbon
- Total dissolved solids
- Ionic contaminants
4.4.10. Contractor shall perform all necessary work to decontaminate the reverse osmosis water treatment system (sanitation/flushing) should a water quality test result indicate the system may have been compromised in its function and reliability to provide water that meets AAMI guidelines. Sanitation, flushing, and cleaning of the water treatment system shall be performed in a manner consistent with AAMI ST-108 guidelines and will not be considered complete until cleared for service through multiple water quality testing and confirmation of those results with the KO.
4.4.11. Contractor shall notify the DSS Logistics and/or KO of any parts or labor required above and beyond routine service and maintenance for the water treatment system. No work shall be performed without written approval from the DSS Logistics Office or the KO. Contractor shall
November 16, 2021 provide a written estimate of the costs for this service within forty-eight (48) hours of identification of an issue.
4.5. Response Time and Labor:
4.5.1. Contractor shall use commercially reasonable efforts to respond by telephone to any report of a malfunction within two (2) hours of notification from NMCSD. The Contractor shall also provide telephone consulting services, twenty-four (24) hours per day, seven (7) days a week.
This consulting service shall be provided to avoid delays in contract service coverage during after-hours and weekend/holiday periods as applicable. Under no circumstances shall the Contractor assume an inquiry, via telephone or any other means, is authorization to provide services not specifically covered by the terms of the contract.
4.5.2. Contractor shall use commercially reasonable efforts to provide on-site support within one
(1) day or twenty-four (24) hours from notification by NMCSD, unless otherwise noted in Section 4.4.
4.5.3. All compensation for labor is provided for in this contract and included in the contract price.
4.5.4. Any work that would require overtime or additional charges must be approved, in writing, in advance by the KO. Any materials that would require additional charges above and beyond those already provided for under the contract must be approved, in writing, in advance by the
KO.
5. Travel and Related Expenses: Contractor shall be responsible for its service-related trip expenses, including round trip travel, mileage, and overnight living expenses.
6. Shipment: The contractor shall not exceed one (1) business day for shipment of all equipment coming from and/or going to NMCSD minus exceptions or conditions as previously noted in this Statement of Work or as approved by the KO. All shipping expenses/costs are provided for in this contract and included in the contract price.
7. Liability:
7.1. The Contractor shall not be liable for any loss, damage, or delay due to any cause beyond their reasonable control, including but not limited to fire, explosion, theft, flood, riot, civil commotion, war, malicious acts of mischief, or other circumstances outside of human control.
7.2. NMCSD Employees will not perform maintenance, or attempt repairs to equipment covered under this contract while such equipment is under the purview of this contract without express, written concurrence from Contractor.
7.3. Insurance: Contractor shall be required to have liability insurance to cover any actions on the part of the Contractor or their sub-contractors which result in injury or death to patients, staff, November 16, 2021 visitors, or other Contractors. Coverage shall be of at least $500,000 per occurrence.
Additionally, Contractor is required to have property damage liability insurance of at least $500,000. Liability insurance shall meet the requirements set forth in FAR 28.307-2.
8. Utilities, Facilities, and Equipment Access:
8.1. The Contractor may use Government utilities (e.g., electrical power, compressed air, water) that are available and required for any service performed under this contract while at Government facilities. The facilities engineer however must approve of any Contractor equipment which would connect to these utilities in order to ensure compatibility with NMCSD utilities.
8.2. Any outages required in order to perform services must be approved by NMCSD Facilities Management prior to initiation of work and shall be performed per Facilities' instruction.
Contractor may request Facilities assistance in performing these outages if required.
8.3. Ensure that all use, storage, transport of any materials regulated by OSHA as "hazardous", required for the performance of this contract, is in in compliance with all federal, state, and local regulations. Contractor shall have available MSDS's for any such materials on-site.
8.4. The Contractor shall protect all facilities from damage caused by the Contractor and shall repair, at no additional cost to the Government, all damages caused by the Contractor's activities.
During performance of services, Contractor shall keep the site safe, neat, clean and orderly.
Contractor shall be responsible for all means, methods, techniques, sequences, and procedures of the services
8.5. Access to Equipment: Contractor shall be provided reasonable access to all equipment that is to be serviced, and utility outlets required to do the service. The contractor shall be free to start/stop all primary equipment incidentals to the operation of the maintained equipment after permission is received from on-duty personnel responsible for such equipment.
9. Security and Safety Requirements:
9.1. The Contractor is required to submit/complete Naval Base San Diego Base access requirements for access to NMCSD. Contractor shall contact Naval Base San Diego Security Department at 619-556-1653/5336 or at https://www.cnic.navy.mil/regions/cnrsw/installations/navbase_san_diego/om/force_protection/p ass_and_decal.html in order to obtain the necessary clearances to perform this contract. All costs for completing the requirements for access are the responsibility of the contractor.
While waiting for authorized access, Contractor shall, at a minimum, contact NMCSD Biomed not later than 1400 on the day prior to a scheduled visit to submit the required information to complete the NMCSD Temporary Security Pass. In case of emergent repairs or service, the contractor shall wait at the NMCSD Main Gate for escort from Biomed personnel.
https://www.cnic.navy.mil/regions/cnrsw/installations/navbase_san_diego/om/force_protection/p
November 16, 2021
9.2. Identification, Parking, and Smoking Regulations at NMCSD: Field service personnel shall wear visible photo identification at all times while on the premises of NMCSD. It is the responsibility of the field service personnel to park in the appropriate designated parking areas.
Information on parking is available from NMCSD Security personnel. Smoking is prohibited inside any buildings of NMCSD and is restricted to designated smoking locations only.
Possession of weapons, alcohol, or pharmaceuticals that are not over the counter and not prescribed to the individual/family is prohibited on the premises. Enclosed containers, including tool kits, are subject to search. Violations of regulations may result in citation answerable in the United States (Federal) District Court. Violation of any policy which results in lost time for Contractor, or his sub-contractors is the sole responsibility of the Contractor, and shall not be charged to the government. Contractor employees shall demonstrate appropriate behavior and dress at all times.
9.3. Contractor Check-In/Check-Out: Contractor is required to report to Material Management Department, Biomedical Repair Division at Building One (1), Ground Floor, Room GD-18H1 at NMCSD prior to and upon completion of any services or repair work performed.
9.4. General Safety Requirements: The Contractor shall exercise safety precautions as the TR may determine to be reasonably necessary to protect the lives and health of occupants of buildings in which work is being performed. NMCSD will notify the Contractor of any noncompliance with the foregoing conditions and the action(s) to be taken. Service vendors shall, after receipt of such notice, immediately correct the conditions to which attention has been directed. If field service engineer refuses to comply promptly, the TR may issue an order stopping all or any part of the work. Under such circumstances, the KO and hold the service vendor in contract default. Nothing in this section will be construed so as to limit the Contractor or his sub-contractors’ responsibilities to comply with any existing law, nor to switch jurisdictions.
9.5. Government Right of Refusal: NMCSD reserves the right to reject any of the contractor's personnel and refuse them permission to enter the premises or work on NMCSD equipment. This right may be exercised at any time. The reasons for rejections may include: lack of training and experience, but may also include but not be limited to: behavior, attire, security concerns, immigration status.
10. Compliance with Applicable Laws: Contractor shall be knowledgeable of and comply with all applicable Federal, State, and local laws, regulations, and requirements regarding the conduct of his business. The Contractors personnel shall comply with the DoD Information Assurance Policies applicable. Contractors are required to maintain a Drug Free Workplace, as well as to require any sub-contractor to do the same. Contract shall require wage determinations and comply with applicable Federal and State worker's compensation and occupational disease statutes.
November 16, 2021
11. Modifications to Contract: Only the KO has the authority to obligate the government, and then only in writing. No modification or instruction from any party shall be construed to authorize the Contractor to take any action for which they expect compensation without written authorization from the KO.
12. Invoicing: All invoicing shall be done in accordance with this statement of work and in accordance with contract. Failure to do so may delay or interfere with payment for services rendered.
13. NMCSD Points of Contact: For all matters concerning performance of this contract, the primary point of contact shall be:
Naval Medical Center San Diego
34800 Bob Wilson Drive
San Diego, CA 92134
TEL: 619-532-8010
FAX: 619-532-5596
Email: USN.SAN-DIEGO.NAVMEDCENSANCA.MBX.NMCSD-
CONTRACTADMINISTRATOR@HEALTH.MIL
For administrative matters, the Contractor may contact the contracting officer as designated in blocks 31.a, and 31.b as found on the Standard Form 1449 issued for the contract, or may contact: See page 3 of this contract for Contract Specialist and Contracting Officer contact information.
File details come from the government source that posted it. Updated .