SOW.pdf
PDF 267 KB Posted
- Attached to
- Exhange/Aircraft Parts for X-59 N859NA
- Solicitation number
- 80NSSC25908095Q-1
About this file
This document is a Spec Sheet/Statement of Work for an exchange purchase for Project X-59 at NASA Armstrong Flight Research Center. The procurement requires a specific fluid pressure regulating valve (Part Number 2750038-101, NSN 4810-01-054-9843), with a quantity of 1 unit and a core serial number 4361EG. NASA Quality Document Q1-A compliance is mandatory, requiring documentation such as FAA 8130, manufacturer's Certificate of Conformance, or OEM trace, along with Q-2 test reports.
The delivery location is NASA Armstrong Flight Research Center in Edwards, CA, with a required delivery date no later than 10/1/2025. The item will be subject to a standard overhauled item warranty. Special freight delivery instructions note that if a freight shipment is required, it must be coordinated 4 business days in advance to ensure proper entry to Edwards Air Force Base, potentially necessitating an AFRC visitor request for the delivery driver.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPEC SHEET/ STATEMENT OF WORK
1. Objective/Requirements Exchange purchase for Project X-59. Purchase requires specific part number and NSN. No alternates approved.
NASA Quality Document Q1-A compliance required (I.E. FAA 8130, manufactures Certificate of Conformance or OEM trace.) Q-2 Test reports, etc.
2. Characteristics, Scope, and Specs
Product part number(s) 2750038-101 4810-01-054-9843 Nomenclature VALVE,REGULATING,FLUID PRESSUR Quantity needed 1 EA Additional Specs Core SN 4361EG
3. Place of Performance or Delivery Location NASA Armstrong Flight Research Center Attn: Aircraft Parts Bldg 4876 Warehouse #6, Lilly Drive Edwards, CA 93524
4. Period of Performance or delivery date/need by date required Needed not later than 10/1/2025
Warranty requirements? Standard overhauled item warranty.
Broker import requirements, if applicable.
Freight Delivery requirements, if applicable. – *If FREIGHT shipment is required, it needs to be coordinated 4 business days in advance to ensure the delivery driver has proper entry into Edwards Air Force Base. An AFRC visitor request may need to be submitted.
File details come from the government source that posted it. Updated .