This Statement of Work (SOW) describes a telecommunications infrastructure project for the U.S. Fish & Wildlife Service at Bears Bluff National Fish Hatchery in Wadmalaw Island, South Carolina. The project involves installing approximately 750 linear feet of multimode full duplex fiber optic communications cable underground between the Office Building and Laboratory Building using directional boring with minimal trenching. The contractor must locate and flag the existing direct-burial copper communications cable, install new fiber optic cable in conduit, terminate wiring with new termination boxes, and ensure the installation supports a minimum of 1 Gbps ethernet speed.
The contractor is responsible for determining cable specifications based on site requirements, providing and installing new paneling and wiring, testing cable functionality, and disposing of any resulting trash. Work must comply with local, state, and federal code requirements, and the contractor must adhere to station rules including restrictions on fishing, swimming, and weekend work. The on-site point of contact is James Henne, and the site location is 7030 Bears Bluff Rd, Wadmalaw Island, South Carolina. Contractors must record measurements and photos during their site visit and note any deviations from the SOW in their quote.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions_and_Answers_Amendment_3_0003.pdf | ||
| Sol_140FGA25Q0063_Amd_0003.pdf | ||
| Sol_140FGA25Q0063_Amd_0002.pdf | ||
| Provisions___Clauses_Amendment_1_0001.pdf | ||
| Sol_140FGA25Q0063_Amd_0001.pdf | ||
| DOL_Wage_Determination.pdf | ||
| Notice_to_Offerors.pdf | ||
| Sol_140FGA25Q0063.pdf | ||
| Price_Schedule.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
Replace Underground Communications Line
Bears Bluff National Fish Hatchery Wadmalaw Island, SC 29487
Replace Power Feed to Well Pump Scope Summary:
Install approximately 750 linear feet of standard multimode full duplex fiber optic communications cable. Contractor to determine fiber specifications based on run length and site needs. Cable will be installed underground (point to point) with directional boring, with minor trench work as needed, of new cable in conduit. Terminate wiring with new termination boxes.
Coordination with USFWS archaeologists is required, as they will monitor the installation of the cable underground.
Services Requested Contractor shall provide permanent installation of a new fiber optic feed from the Office Building to the laboratory Building in the following manner:
• Locate and flag the existing direct-burial copper communications cable, which will provide the path for the new fiber optic feed. General mapping is provided. The map is provided for illustrative purposes only. Bidders should not rely on this map for distances or pricing, which should be measured, recorded, and calculated by the bidder.
• The existing direct-burial copper communications cable is to be left undisturbed from point to point, including all network connections within the two buildings.
• Install multimode full duplex fiber optic cable in conduit from point to point between the Office Building and Laboratory Building via directional underground bore. Minimize trenching.
• Terminate wiring inside buildings with new termination boxes appropriate for others to patch to network switches.
• Contractor shall determine cable specifications based on site requirements, distance between buildings, existing network equipment, etc. to support a minimum of Gigabit ethernet speed (1 Gbps).
• Provide and install new paneling, wiring, and terminate all wiring in new switch boxes.
• When installation is complete, test and verify that new cable is functional at specified speed.
• All work is to be completed in accordance with all applicable local state and federal code requirements.
• Haul off/dispose of any trash resulting from this work.
The prospective contractor is responsible for recording all measurements, photos, and any other information necessary for developing an accurate bid for this work during their site visit. Contractor must provide any deviations from this SOW in their quote. If no deviations are noted in the quote, all installation procedures and specifications listed in this SOW will be met or exceeded by the contractor at the quoted price. Note that the contractor, subcontractor, and any other employees performing this work must comply with all station rules and regulations including, but not limited to: fishing, swimming, and weekend work are not permitted, and all employees performing this work must follow established safety guidelines. If contractor wishes to work outside of the normal hours of operation, they must schedule this in advance with the station Project Leader.
Site location: USFWS, Bears Bluff National Fish Hatchery, 7030 Bears Bluff Rd, Wadmalaw Island, South Carolina, 29487.On Site POC: James Henne, 843-559-2315, James_Henne@fws.gov
Maxar, Microsoft
0 0.15 0.30.07 Miles
The red line indicates path of existing buried communnications cable. Cricle=Lab Bldg, Square=Office Bldg. **Disregard the white line.**