SOW.pdf

PDF 625 KB Posted

Attached to
Sources Sought - AFD Governors Pump Repair Services
Solicitation number
W912DW25X17NA
Issued by

About this file

This Statement of Work (SOW) details the remanufacturing requirements for a 60 HP Woodward XX Herringbone Gear Pump Assembly at the Albeni Falls Dam (AFD) for the U.S. Army Corps of Engineers. The project involves a firm fixed price service contract to disassemble, inspect, clean, replace bearings and gaskets, machine components, rewind the electric motor, and conduct comprehensive testing of the pump and motor assembly. The contractor must restore the pump to factory specifications, with specific requirements including achieving a minimum flow of 250 gallons per minute, maintaining pressure between 270-300 PSIG, and verifying full-load amperage draw.

Emerson Electric is identified as the only viable supplier due to the proprietary design and historical ownership of the Woodward pump technology. The performance period is expected to be ten weeks after receipt at the contractor's facility, with transportation arranged by the contractor both to and from Albeni Falls Dam. The approximate weight of the pump and motor assembly is 2,800 pounds, with specific shipping and delivery constraints including working hours of 7:00 AM - 4:00 PM, Monday through Thursday, excluding Fridays and federal holidays. The shipping address is Albeni Falls Dam, Attn: Maintenance Engineer, 2376 East Highway 2, Oldtown, ID 83822.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

Albeni Falls Dam U.S. Army Corps of Engineers

Unit 3 Governor Pump & Motor Remanufacture

1. Purpose: This statement of work (SOW) defines the requirements for one (1) Firm Fixed Price Service contract to remanufacture and test a 60 HP Woodward XX Herringbone Gear Pump Assembly. The Government will not exercise supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.

1.1 Description of Services: The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items on this non-personal services requirement necessary to perform the remanufacture and shop test service as defined in this Statement of Work except for those items specified as government furnished property and services.

The contractor shall perform to the standards in this contract.

1.2 Background: The 60 HP Woodward XX Herringbone Gear Pump that serves Albeni Falls Dam (AFD)

Main Unit 3 has known wear and damage. One of the herringbone gears is worn and damaged; it has impacted the bearing plates where it seats up to the frame. All four pump bearings have been replaced but the pump won’t rotate. The electric motor is serviceable but is due for rewind due to use and age.

1.3 Objectives:

Disassembly, cleaning and inspection of all items (pump, unloader, pilot valve).

Replacement of four pump bearings (reuse pump bearings if possible).

Replacement of pump O-rings and fish paper, seals, all gaskets including one pump case to base gasket and two motor foot to base gaskets.

Inspection and rehab of check valve seat and plunger, as needed.

Machining and dressing of pump components to restore factory clearances and recommended specifications.

Assembly, verification of proper clearances, and testing of pump for proper operation.

Motor rewind, including double dip and bake of stator windings to nameplate specifications.

Contractor shall conduct pump and motor assembly testing at their facility. A detailed test record report shall be produced and testing shall include, at a minimum, the following:

o Verification that the pump and motor assembly is capable of a delivering a minimum flow of 250 gallons per minute (GPM).

o Verification of no excessive noise, vibration or heat build-up.

o Contractor shall adjust pilot valve/unloader control to AFD specs. Pump starts at 270 PSIG and unloads at 300 PSIG. Note: Pressure relief valve is located on the system accumulator tank and is set at 330 PSIG.

o Contractor shall not allow pressure to rise above 300 PSIG or drop below 270 PSIG, the normal pump operating range.

o The maximum tested pump output (GPM) shall be recorded in the test record.

o Full-load amperage draw (not to exceed nameplate) shall be verified and recorded while running the pump loaded, with relief valve open.

Contractor shall ship a hardcopy test record with the pump. A digital copy, in PDF format, shall be to the AFD contracting specialist.

2. Scope: Provide all labor, equipment, materials, supervision, and other items and non-personal services necessary to perform complete remanufacture, repair and testing of the pump, motor and related equipment.

3. Performance:

3.1 The government’s expectation is that the period of performance is ten (10) weeks after receipt at contractor’s facility.

3.2 If the remanufacturing process will take more time, the contractor shall contact the Government POC to discuss additional time needed.

3.3 Place of Performance: Contractor’s facility(ies).

4. Type of Contract: The government will award a Firm Fixed Price Service contract.

5. Contractor Special Qualifications: The Woodward XX pump with integral 60HP Westinghouse motor is a proprietary design of the Woodward Company. Woodward’s hydroelectric business was acquired by American Governor Company, and subsequently, American Governor was acquired by Emerson Electric.

Emerson continues to support the Woodward Governor hydroelectric equipment. Emerson is the only supplier that can provide original engineering information, drawings, and OEM parts.

Obtaining the services and parts from a company with less institutional knowledge, skills and abilities will increase the risk of faults and possible failure of the pump and motor assembly upon testing or reinstallation.

In the event that the pump is destroyed due to damage from inferior parts, being assembled improperly, or not being machined to original tolerances, a drop-in replacement will not be available from any source. This model of pump has been out of production for several decades.

Again, there is no drop-in replacement. A replacement governor pump will require substantial engineering and design with prohibitive lead time, cost and equipment downtime, including loss of revenue from power generation. Again, Emerson is the only viable supplier for this rebuild.

6. Shipment and Delivery: The contractor shall arrange for the transportation both to and from Albeni Falls

Dam. Albeni Falls Dam employees will ensure the pump is properly crated for pickup by contractor arranged shipping. Once the remanufacture is complete the contractor will ship the item back to Albeni Falls Dam, ensuring proper crating to avoid any damage while in transit. The approximate weight of the pump and motor assembly is 2,800 pounds. Approximate crate dimensions are: 48” lg. X 45” wd. X 48” ht.

Pickup and delivery must take place during Albeni Falls Dam’s normal working hours, 7:00 AM – 4:00 PM, Monday through Thursday. The dam is closed for deliveries on Fridays and is also closed on Federal holidays.

Shipping Address:

Albeni Falls Dam Attn: Maintenance Engineer 2376 East Highway 2 Oldtown, ID 83822

File details come from the government source that posted it. Updated .