SOW.pdf
PDF 771 KB Posted
- Attached to
- Winter Garden Antenna & Line Replacement
- Solicitation number
- 15F06725Q0000122
About this file
This is a Statement of Work (SOW) from the FBI's Operational Technology Division requesting the removal and replacement of damaged coaxial transmission feedline and associated hardware at their Winter Garden tower site in Florida. The work is required for the FBI's Land Mobile Radio (LMR) system, which supports secure tactical communications for FBI and DOJ operations.
The contractor must remove existing 1-5/8" coaxial transmission line from a 700' guyed tower and install new 1-5/8" transmission line system from the 600' level to the transmitter building equipment connection. Required materials include foam coaxial transmission line, grounding kit, hangers, connectors, hoisting grips, weatherproofing kit and color code roll. The contractor must make all connections, sweep the transmission line before putting it into service, and dispose of debris off-site. This is a firm-fixed-price contract with work to be performed at 435 W Story Rd, Winter Garden, FL 34787 over a 4-month period after award. The FBI currently leases the tower space from Crown Castle.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFQ 15F06725Q0000122 - Winter Garden Antenna and Line Replacement.pdf | ||
| RFQ 15F06725Q0000122-.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UNCLASSIFIED
UNCLASSIFIED
FEDERAL BUREAU OF INVESTIGATION
Winter Garden Antenna & Line Replacement
Requisition Number: SHOP-PR-25-000836
Division(s): Operational Technology Division
Statement of Work
Background
A background statement defines the historical circumstances which led to the conception of the requirement described in this document.
The Federal Bureau of Investigation’s background statement is detailed below.
Background Statement
The FBI’s mission is to protect and defend the United States against terrorist and foreign intelligence threats, to uphold and enforce the criminal laws of the United States, and to provide leadership and criminal justice services to federal, state, municipal, and international agencies and partners; and to perform these responsibilities in a manner that is responsive to the needs of the public and is faithful to the Constitution of the United States.
The mission of the Radio Engineering Unit (REU) is to provide secure, tactical, interoperable wireless communications in support of FBI and DOJ national security and law enforcement operations. The main effort is the operation and maintenance of the Land Mobile Radio (LMR) system, the largest LMR network in the world
The Federal Bureau of Investigation’s (FBI) Radio Program, Tampa field office is requesting the removal and installation of coaxial transmission feedline with associated hardware at their Winter Garden tower site that has been damaged from storms.
The FBI currently leases space at this tower from Crown Castle.
Scope
A scope provides a broad description of the intended use of the services and/or products to be acquired in relation to the requirement described in the document.
The Federal Bureau of Investigation’s scope is detailed below.
Contract Type
Firm Fixed Price
Scope Statement
The OPERATIONAL TECHNOLOGY DIVISION Division(s) of the The Federal Bureau of Investigation require(s) the following products/services:
Operations and Maintenance (O&M) Support Services
In support of The Land Mobile Radio System. Replace coaxial transmission line damaged from recent storms.
Task 1
Objectives
Each objective describes a desired outcome to be achieved during the contract lifecycle.
Corresponding tasks, each which describe what work should be performed in order to achieve the referenced objective(s), are listed accordingly.
The Federal Bureau of Investigation’s objectives are listed below.
Objective 1
Coaxial Line Removal & Replacement.
Remove and replace new 1-5/8" coaxial transmission line and associated hardware.
The contractor shall remove and replace existing 1-5/8" coaxial transmission line system currently on the 700' guyed tower and supply and install new 1-5/8" transmission line system from the 600' level to the transmitter building equipment connection..
Vendor will make all associated connections and sweep the transmission line prior to placing into service.
Debris from site shall be moved to an appropriate offsite disposal location. Vendor will supply the following materials: 1-5/8" Foam coaxial Transmission Line, Transmission Line Grounding Kit, Transmission Line Hangers, 1-5/8" Connectors, ½" Connectors, Transmission line Hoisting Grips, Weatherproofing Kit and Color Code Roll.
Additional Context
Place and Period of Performance
A period of performance is the range of time within which a contractor must fulfill a contract’s requirements.
A place of performance describes the geographical location(s) at which a contractor must work to fulfill a contract’s requirements.
The Federal Bureau of Investigation’s place and period of performance is detailed below.
Period of Performance
Date of award - 4 months out (estimated)
Place of Performance
Winter Garden tower site: 435 W Story Rd, Winter Garden, FL 34787
File details come from the government source that posted it. Updated .