This document is a Statement of Work (SOW) for the inspection, repair, and testing of submarine high- and low-pressure air compressors and dehydrators. The key requirements include:

Conducting operational inspections and 2000-hour maintenance on three High Pressure Air Compressors (HPACs), two High Pressure Air Dehydrators (HPADs), one Low Pressure Air Compressor (LPAC), and one Low-Pressure Air Dehydrator (LPAD). Work includes cleaning, inspecting, and replacing parts as needed to restore the equipment to full operational capability. All work must be performed to OEM specifications using referenced technical manuals. The period of performance is January 2025 to March 2026, with the majority of the work to be completed in February 2026. The contractor must provide condition feedback reports and acceptance test reports for each piece of equipment. The government will provide certain materials, fluids, and services to support the contractor's efforts.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK (SOW)

VESSEL AIR COMPRESSOR AND DEHYDRATOR INSPECTION, REPAIRS AND

TESTING

1. BACKGROUND & GENERAL REQUIREMENTS: Vessel high- and low-pressure air compressors and dehydrators have exceeded normal run hours resulting in equipment failure. Require OEM conduct operational inspection and conduct repairs to No. 1, No. 2 and No. 3 High Pressure Air Compressors (HPAC); No. 1 and No. 2 High Pressure Air Dehydrators (HPAD); Low Pressure Air Compressor (LPAC) and Low-Pressure Air Dehydrator (LPAD).

1.1. Scope: Accomplish shipboard operational inspection and 2000 hour maintanence of No. 1, No. 2 and No. 3 High Pressure Air Compressors (HPAC). Accomplish shipboard inspection and restoration of No. 1 and No. 2 High Pressure Air Dehydrators (HPAD). Observe shipboard testing and accomplish post-test repairs of Low Pressure Air Compressor (LPAC). Accomplish in shop repair and testing of Low-Pressure Air Dehydrator (LPAD) as well as shipboard post-installation repairs.

2. REFERENCES:

2.1. SUBMEPP Maintenance Standard – 5510-081-021 Rev E / Chg. 3, Perform minor overhaul of high-pressure air compressor

2.2. SUBMEPP Maintenance Standard – 5510-081-054 Rev A / Chg. 5, Overhaul high pressure air dehydrator

2.3. SUBMEPP Maintenance Standard – 5510-081-080 Rev D / Chg. 18, Restore low pressure air compressor

2.4. SUBMEPP Maintenance Standard – 5510-081-057 Rev B / Chg. 3, Overhaul service air dryer assembly

2.5. COMUSFLTFORCOMINST 4790.3 Rev D / Chg. 2 - Joint Fleet Maintenance Manual

2.6. NAVSEA S0400-AD-URM-010/TUM Rev 08 – Tag-out User’s Manual

2.7. NAVSEA 389-0288, Radiological Requirements

2.8. Northwest Regional Maintenance Center (NWRMC) Local Standard Items

2.9. NAVSEA Technical Manual – S6220-AT-MMA-A10 Rev 00 / Chg. D (HPAC) – High Pressure Air Compressor (HPAC)

2.10. NAVSEA Technical Manual – S9551-CY-MMA-010 Rev 00 / Chg. - (HPAD) – High Pressure Air Dehydrator (HPAD)

2.11. NAVSEA Technical Manual – S6220-AN-MMA-010 Rev 02 / Chg. J (LPAC) – LOW PRESSURE

AIR COMPRESSOR MD-663C

2.12. NAVSEA Technical Manual – S9551-BX-MMA-010 Rev 01 / Chg. G (LPAD) – DEHYDRATOR ASSEMBLY, AUTOMATIC LOW-PRESSURE AIR, TYPE III, Model Number 10300-60-2

2.13. SUBMEP UACS – SUBMEP-18-250I, Bearing surface lubrication for assembled joints (Update to all SMSs)

2.14. STR-4P37 – Supplementary Technical Requirement (Cleanliness requirements for hardware)

2.15. SUBMEP UACS – NSWCCD-15-002A, Restore low pressure air compressor (Update to SMS 5510- 081-080)

2.16. SUBMEP UACS – NSWCPD-23-011, Overhaul service air dryer assembly (Update to SMS 5510- 081-057)

3. WORK REQUIREMENTS:

3.1. Period of Performance: 03 JAN 2025 - 28 MAR 2026

3.2. Location of Work: Puget Sound Naval Shipyard & OEM Facilities

3.3. All mandatory replacement materials required to complete maintenance and testing to be as identified in Equipment Guide Lists of 2.1, 2.2, 2.3 and 2.4. Replace with Original Equipment Manufacturers (OEM) repair standard parts.

3.4. Attend an arrival and safety brief with Project Team and Contracting Officer’s Representative (COR), for all contractor and subcontractor employees, upon arrival.

3.5. Restricted Data: Contractor employees require access to and control of RESTRICTED DATA (RD), regarding Naval Nuclear Propulsion Information (NNPI and U-NNPI), to accomplish the requirements of this contract. Safeguarding of NNPI and U-NNPI shall be per the requirements of OPNAVINST N9210.3 (current revision). Contractor employees will require access to the engine room compartment to conduct maintenance and modernization to systems and equipment.

3.6. Government Point of Contact (COR): See Contract

3.7. Coordinate delivery and shipment of Contractor equipment and supplies with the COR: Robert Reuter (360) 552-0535

Government Delivery and Shipping Address:

Puget Sound Naval Shipyard & IMF 1400 Farragut Avenue, BLDG 514 Shipping and Receiving Bremerton, WA 98314-5001 ATTN: Robert Reuter

3.8. WORK CONTROLS

3.8.1. Code 246 will ensure work authorization requirements of 2.5 and 2.6, and any local instructions are met in support of work, including preparation and execution of Work Authorization Forms (WAFs), isolation of work site (tag-out), and coordination in regards to WAFs and tag-outs

3.8.2. Coordinate with Code 246 and Ships Force to clearly define work boundaries to ensure entire work site is isolated per 2.5 and 2.6.

3.8.3. Review Work Authorization Form (WAF) with Code 246 and Ships Force to ensure understanding authorized work areas prior to starting work and maintain a copy of the WAF onsite during production work,

3.9. ENVIRONMENTAL AND SAFETY CONCERNS

3.9.1. The Contractor shall cooperate with each environmental, health, safety, and accident/mishap investigation.

3.10. SECURITY REQUIREMENTS:

3.10.1 Defense Biometric Identification System (DBIDS) Program: Commander, Navy Installations Command (CNIC) has established the Defense Biometric Identification System (DBIDS) for access control to CNIC Installations via Entry Control Points (ECP). DBIDS is an enterprise identity management and perimeter installation access control solution in which Contractor personnel who enroll, and are approved, are subsequently granted access to the installation for a period up to three years, or the length of the contract, whichever is less, and are not required to obtain a new pass from the Base Pass and Identification Office for each visit. There are no fees associated with obtaining a DBIDS credential.

3.10.2 The Government performs background screening and credentialing. Throughout the year the Contractor employee must continue to meet background screening standards. Periodic background screenings are conducted to verify continued DBIDS participation and installation access privileges. DBIDS access privileges will be immediately suspended or revoked if at any time a contractor employee becomes ineligible.

3.10.3 Access to Installation. All Contractor personnel shall obtain access to the installation through enrollment and registration into the Defense Biometric Identification System (DBIDS). The Contractor shall provide the Contracting Officer with the name of their designated Service Contractor Administrator (SCA) for enrollment in DBIDS. Contact the Contracting Officer’s Representative (COR) or Contracting Officer’s Security Officer for assistance as needed. Once enrolled, the Contractor must provide the DBIDS Registrar with an approved employee list and then direct their employees to register into DBIDS.

3.10.4 DBIDS Credentials. Contractor employees shall furnish a completed copy of the SECNAV

5512/1 form to obtain the required background check and visit the local Navy Installation Visitor Control Center to obtain a DBIDS credential once approved. The SECNAV 5512/1 form and additional information about DBIDS can be found at:

https://www.cnic.navy.mil/om/dbids.html. (NOTE: All requests must be received 15 to 30 business days prior to desired access date).

3.10.5 Unescorted access requires authenticating an individual’s identity and determining their fitness using the following guidelines:

3.10.5.1 Identity Proofing. The process of providing sufficient information (e.g., identity history, credentials, and documents) when attempting to establish an identity. The following credentials are identity proofed at the card issue site from federally authorized identity documents and will be considered identity proofed. CAC, Uniformed Services Identification (ID) Card issued to military retirees and military family members, Non-DoD Federal Personal Identification Verification, United States (U.S.) Passport or Passport Card, Foreign passport that contains a temporary I-551 stamp or temporary I-551 printed notation on a machine-readable immigrant visa, or others listed in reference (a) and chapter 16. (Note: While certain identification is approved for identity proofing, in order to register a visitor into DBIDS, the visitor must have an ID with an ID number associated. U.S. Citizens are required to provide their Social Security Number (SSN), Certificate of Naturalization or Taxpayer ID Number to receive a DBIDS pass to access the installation).

3.10.5.2 Vetting. An evaluation of an applicant or card holder’s character and conduct for approval, or denial of the issuance of an access control credential for physical access. The SECNAV 5512/1 is the sole means to initiate background checks on all visitors and/or contractors/vendors. Every background check for the purpose of access control requires completion of SECNAV 5512/1 for accountability purposes.

3.10.6 Personnel requiring access for 31 days or more will be issued a DBIDS card once all required documentation is provided to the VCC and registration is completed. Visits for 30 days or less will receive a paper DBIDS pass.

3.10.7 Personnel requiring access for 31 days or more will be issued a DBIDS card once all required documentation is provided to the VCC, and registration is completed. Visits for 30 days or less will receive a paper DBIDS pass.

3.10.8 Pre-enrollment. DBIDS pre-enrollment is available at https://dbids-usfj.dmdc.mil/portal/.

3.10.9 Coordinate all contractor employee badging and security issues via the Government representative: Chontay Woodruff, (360)627-3373, chontay.r.woodruff.civ@us.navy.mil

3.11. RADIOLOGICAL REQUIREMENTS:

3.11.1. Radiological Requirements: Contractor shall not accomplish work in areas that require personal monitoring of radiation, i.e. wearing a Thermoluminescent-Dosimeter (TLD) per the requirements of 2.7.

3.11.2. Planning, supervising, or performing nuclear work is not authorized without the express approval of Code 300N, Code 1200N, Code 2300, and Code 105.

3.12. TECHNICAL REQUIREMENTS:

3.12.1. Comply with the requirements of 099-12NW of 2.8.

3.12.2. Coordinate with Ship’s Force personnel to provide continuous operator training during inspection and repair sequences.

3.12.3. HPAC/HPAD/LPAC/LPAD Inspection:

3.12.3.1. Accomplish preliminary inspection/inventory and record TRIPER Serial Number of 3 each HPACs, 2 each HPADs, 1 each LPAC and 1 each LPAD to OEM specifications and use Ref. 2.1 through 2.4, 2.6 through 2.12 for guidance. Identify any major repairs required.

Contractor to complete inspection by March 1, 2025.

3.12.3.2. Submit one legible copy, in approved transferrable media, a Condition Feedback Report (CFR) of the inspection results, including any missing or damaged parts, to the Contracting Officer’s Representative (COR) for each piece of equipment inspected within 24 hours of completing the inspection. (CDRL A001, DI-MGMT-81648)

3.12.4. HPAC Groom:

Perform maintanence on each of the three HPACs in accordance with OEM specifications and 2.1, 2.9, & 2.13 as guidance. Ensure cleanliness requirements are maintained per 2.14. Work to be performed February 2026.

3.12.4.1. Perform all 2000 hour maintenance per OEM Specifications and 2.9 for Guidance.

3.12.4.2. Inspect and adjust Back Pressure Valve per paragraph 4-4-3-6-4 of 2.9.

3.12.4.3. Inspect, clean and test Compressor Management System (CMS) wiring harnesses and connectors shown on Figure FO-23 of 2.9.

3.12.4.4. Inspect, clean, and run system diagnostics on Compressor Management System (CMS) and Programable Logic Controller (PLC) and adjust for optimum performance.

3.12.4.5. Inspect and test all solenoid actuated, pilot operated drain valve assemblies.

Test the drain system for proper operation ensuring unobstructed flow and no union or fitting leakage.

3.12.4.6. Inspect pressure transducers and temperature sensors, Submit CFR A001 if any components need to be replaced.

3.12.4.7. Adjust all HPAC relief valves to meet the requirements of 2.9 Table 1-2-1-4. Submit CFR A001 for any components that cannot be properly adjusted.

3.12.4.8. Observe post maintenance operational test per step 1.m. of 2.1.

3.12.4.9. Accomplish additional minor repairs of HPACs to correct air, oil and water leaks, and electrical discrepancies discovered during testing.

3.12.4.10. Submit one legible copy, in approved transferrable media, of an acceptance test report (ATR) of the inspection results, identification of any repaired or replaced parts, and test results to the Contracting Officer’s Representative (COR) for each piece of equipment inspected within 24 hours of completing the work and testing. (CDRL A002 & DI-QCIC- 81891)

3.12.5. HPAD Groom:

Perform maintanence on each of the HPADs in accordance with OEM specifications and 2.2, 2.10, & 2.13 as guidance. Ensure cleanliness requirements are maintained per 2.14. Work to be performed February 2026.

3.12.5.1. Clean and inspect Afterfilter assembly per step 1.k. of 2.2 as modified by 2.15.

3.12.5.2. Replace filter assemblies failing inspection per paragraph 6-55 of 2.10.

3.12.5.3. Replace Pre-Filter per paragraph 6-51 of 2.10.

3.12.5.4. Remove Tower Assemblies and replace desiccant per paragraph 6-41 of 2.10.

3.12.5.5. Replace Flow Valves FV-1 and FV-2 per paragraph 6-18 of 2.10.

3.12.5.6. Replace Flow Valves FV-3 and FV-4 per paragraph 6-19 of 2.10.

3.12.5.7. Replace Vent Valves VV-1 and VV-2 per paragraph 6-17 of 2.10.

3.12.5.8. Replace Check Valves CV-2 and CV-3 per paragraph 6-56 of 2.10.

3.12.5.9. Replace Check Valves CV-4 and CV-5 per paragraph 6-62 of 2.10.

3.12.5.10. Inspect relief/solenoid valve assembly per per OEM specifications and step 1.l. of 2.2.

Restore any components that do not meet inspection requirements. Submit CFR A001 if replacements are required.

3.12.5.11. Inspect electrical enclosure per per OEM specifications and step 1.m. of 2.2. Restore any components that do not meet inspection requirements. Submit CFR A001 if replacements are required

3.12.5.12. Inspect heater assembly per per OEM specifications and step 1.r. of 2.2. Restore any components that do not meet inspection requirements. Submit CFR A001 if replacements are required

3.12.5.13. Observe post maintenance operational test per step 1.al. of 2.2.

3.12.5.14. Accomplish additional minor repairs of HPADs to correct air, oil and water leaks, and electrical discrepancies discovered during testing.

3.12.5.15. Submit one legible copy, in approved transferrable media, of an acceptance test report (ATR) of the inspection results, identification of any repaired or replaced parts, and test results to the Contracting Officer’s Representative (COR) for each piece of equipment inspected within 24 hours of completing the work and testing. (CDRL A002 & DI-QCIC- 81891)

3.12.6. LPAC Testing:

Observe testing of the LPAC in accordance with OEM specifications and 2.3, 2.5, 2.11, & 2.13 as guidance. Ensure cleanliness requirements are maintained per 2.14. Work is to be performed February 2026.

3.12.6.1. After LPAD is reinstalled and verified to be in working condition, observe operational test of LPAC per step 1.ar. of 2.3 as modified by 2.15 paragraphs 1.ar.(9) through 1.ar.(12).

3.12.6.2. Accomplish minor repairs on LPAC to correct air, oil, water leaks, and electrical discrepancies discovered during testing.

3.12.6.3. Submit one legible copy, in approved transferrable media, of an acceptance test report (ATR) of the inspection results, identification of any repaired or replaced parts, and test results to the Contracting Officer’s Representative (COR) for each piece of equipment inspected within 24 hours of completing the work and testing. (CDRL A002 & DI-QCIC- 81891)

3.12.7. LPAD Repair:

Open, inspect and technically evaluate government furnished equipment and repair upon approved CFR. Work is to be completed by January 2026.

3.12.7.1. Repair LPAD to OEM Specification using 2.4 as modified by 2.13 & 2.16 as guidance.

3.12.7.2. Accomplish additional minor repairs of LPAD to correct air, oil, water leaks, and electrical discrepancies discovered during testing.

3.12.7.3. Submit one legible copy, in approved transferrable media, of an acceptance test report (ATR) of the inspection results, identification of any repaired or replaced parts, and test results to the Contracting Officer’s Representative (COR) for each piece of equipment inspected within 24 hours of completing the work and testing. (CDRL A002 & DI-QCIC- 81891)

3.12.7.4. Ship repaired LPAD to PSNS for reinstallation.

3.12.7.5. Observe shipboard LPAD testing.

3.12.7.6. Accomplish additional minor repairs of LPAD to correct air, oil, water leaks, and electrical discrepancies discovered during shipboard testing.

4. GOVERNMENT FURNISHED MATERIAL/SERVICES/PROPERTY:

4.1. Government provided services while onsite at PSNS:

4.1.1. HAZMAT/ HAZWASTE disposal.

4.1.2. Remove, dispose, and replenish all required fluids.

4.1.3. Paint equipment.

4.1.4. Crane Support, Rigging and in Yard Transportation

4.1.5. Temporary Services

4.1.6. Covered Laydown Area of 100 square feet, to accommodate job box and materials

4.2. Government will supply the following:

Detail Dwg/Rev/PC Associated Unit Description NIIN Act Qty

UI

PL12424404/C/26 HPAC SEAL – SPLIT OIL 01-068-9623 2 EA

PL12424404/C/65 HPAC GASKET – DRIVE COVER 01-539-1034 2 EA

PL12424404/C/540 HPAC GASKET – OIL PUMP COVER 01-057-5856 2 EA

10262-10/M/17 10278-8/F/2

HPAD/

LPAD

DESICCANT,ACTIVATED, FOR USE IN HPAD/LPAD

***AUL EXEMPT - ARTICLE DESICCANT

(DEHUMIDIFIER) PACKETS, VOLATILE CORROSION

INHIBITORS (E.G. VCI-111 EMITTERS) ANY SIZE*** 00-738-1672 1 DR

PL10101-11/R/52 HPAD VALVE, 1/8" CARTRIDGE VV1, VV2, RTV1, RTV2 & RTV3

W/O HANDLE 01-188-1285 10 EA

PL10101-11/R/50 HPAD VALVE, 1/4" CARTRIDGE FV3 & FV4 W/O HANDLE 00-355-7688 4 EA

PL10101-11/R/51 HPAD VALVE,GLOBE, VALVE,GLOBE 3/8" IPS FV1 & FV2 01-218-1904 4 EA

PL10101-11/R/103 HPAD PACKING, O-RING SIZE-012, 90 DUROMETER 0.364" ID

X .070" ROUND CROSS SECTION, -30/+500 DEG F 00-166-1084 20 EA

PL10101-11/R/104 HPAD O-RING, O-RING SIZE-120, 90 DUROMETER 01-106-0942 20 EA

PL10101-11/R/169 HPAD RETAINER, RING, PN PRP2103-120 00-814-2371 10 EA

PL10101-11/R/106 HPAD PACKING, PACKING, PREFORMED RBR, SIZE -014, 90

DUROMETER 00-166-1086 8 EA

PL10101-11/R/107 HPAD PACKING, PREFORMED, PACKING, PREFORMED SIZE-

216, 90 DUROMETER 00-166-1110 8 EA

PL10101-11/R/168 HPAD RETAINER, PACKING, RETAINER, PACKING 00-582-2142 4 EA

PL10101-11/R/102 HPAD PACKING, PREFORMED, PACKING, PREFORMED SIZE-

114, 90 DUROMETER 01-133-9790 22 EA

PL10101-11/R/167 HPAD RETAINER,PACKING, RETAINER, PACKING 00-582-1536 4 EA

PL10101-11/R/100 HPAD O-RING, O-RING, SIZE -920, 90 DUROMETER 01-024-2512 4 EA

PL10101-11/R/101 HPAD PACKING, PREFORMED R, PACKING, PREFORMED RBR,

SIZE-218, 90 DUROMETER 01-106-7288 4 EA

PL10101-11/R/114 HPAD PACKING, PREFORMED, PACKING, PREFORMED RBR,

SIZE-210, 90 DUROMETER 01-127-0971 22 EA

PL10101-11/R/90 HPAD PACKING, PREFORMED, PACKING, PREFORMED SIZE-

908, 90 DUROMETER 00-167-5173 16 EA

PL10101-11/R/57 HPAD FILTER ELEMENT,FLUI, FILTER ELEMENT,FLUID 5

MICRON NOM. 18 MICRON ABS. 01-038-7413 4 EA

PL10101-11/R/48 HPAD VALVE,CHECK, VALVE,CHECK CV4 & CV5 01-091-5538 4 EA

PL10101-11/R/109 HPAD SEAL, O-RING O.D.V. 01-121-1248 4 EA

PL10101-11/R/108 HPAD SEAL, O-RING I.D.V 01-117-4730 4 EA

PL10101-11/R/49 HPAD VALVE,SAFETY RELIEF, VALVE,SAFETY RELIEF CV2 &

CV3 01-090-9654 4 EA

PL10101-11/R/112 HPAD SEAL, SEAL SAFETY CHECK VALVE GASKET O.D.V. 01-117-4731 6 EA PL10101-11/R/113 HPAD GASKET, GASKET SAFETY CHECK VALVE GASKET I.D.V. 01-143-9723 8 EA

PL10101-11/R/111 HPAD SEAL RING METAL, BOSS SEAL 01-091-7651 2 EA

PL10101-11/R/47 HPAD CARTRIDGE,SHUT-OFF, NEEDLE VALVE PV 01-091-4360 2 EA

10262-10/M/5 HPAD RING AND ROD ASSEMB, P/N: 6455-2 01-204-8040 4 EA

10262-10/M/9 HPAD RETAINER,PACKING, P/N: 8-343N300-90 00-003-5490 4 EA

10262-10/M/8 HPAD O-RING, SIZE -343, 90 DUROMETER 01-212-4624 4 EA

10262-10/M/16 HPAD O-RING, SIZE -244, 90 DUROMETER 01-043-1904 4 EA

10262-10/M/2 HPAD FILTERING DISK,FLUI, ASSY P/N: 10122-3 01-130-5391 4 EA

10262-10/M/18 HPAD FILTER ASSEMBLY, LOWER P/N: 10122-13 01-138-0337 4 EA

10320-5/E/6 HPAD FILTER ELEMENT, PRE-FILTER ASSEMBLY FOR #1 AND

#2 HPAD 01-108-2589 2 EA

Act Qty

UI

PL12424404/C/26 HPAC SEAL – SPLIT OIL 01-068-9623 2 EA

PL12424404/C/65 HPAC GASKET – DRIVE COVER 01-539-1034 2 EA

PL12424404/C/540 HPAC GASKET – OIL PUMP COVER 01-057-5856 2 EA

10320-5/E/7 HPAD O-RING, SIZE-038, 90 DUROMETER 01-148-2691 2 EA

10320-5/E/8 HPAD O-RING, SIZE-327, 90 DUROMETER 01-289-3214 2 EA

10320-5/E/NONE HPAD CARTRIDGE,VALVE,CHE, VALVE, CHECK 01-118-2633 2 EA

10320-5/E/9 HPAD RETAINER,PACKING, BACKUP RING -038 00-003-5491 2 EA

10320-5/E/10 HPAD RETAINER,PACKING, BACKUP RING -327 00-171-5071 2 EA

10262-10/M/3 HPAD RETAINER ASSEMBLY, PLUG ASSY 01-122-4480 4 EA

PL10101-11/R/117 HPAD GASKET, FACE SEAL, I.D.V. SILVER SURFACE

TREATMENT FOR #1 AND #2 HPAD 01-058-5324 4 EA

PL10101-11/R/43 HPAD VALVE,GLOBE, BLOWDOWN VALVE (BDV) FOR #1 AND

#2 HPAD 01-126-3736 2 EA

PL10101-11/R/87 HPAD O-RING, O-RING SIZE -904, 90 DUROMETER 0.351" ID

X .072" ROUND CROSS SECTION, -30/+500 DEG F 00-167-5172 28 EA

PL10101-

11/R/88/89

HPAD PACKING, PREFORMED, PACKING, PREFORMED SIZE -

906, 90 DUROMETER 00-165-1981 16 EA

PL10101-11/R/91 HPAD PACKING, PREFORMED, PACKING, PREFORMED SIZE -

912, 90 DUROMETER 00-167-5175 4 EA

PL10101-11/R/93 HPAD O-RING, O-RING SIZE -127, 90 DUROMETER 00-166-1104 2 EA

PL10101-11/R/105 HPAD O-RING, SIZE -222, 90 DUROMETER FOR #1 AND #2

HPAD 01-006-2129 12 EA

PL10101-11/R/115 HPAD PACKING, PREFORMED, PACKING, PREFORMED SIZE -

212, 90 DUROMETER 00-166-1109 4 EA

PL10101-11/R/116 HPAD GASKET, FACE SEAL I.D.V. SILVER SURFACE

TREATMENT FOR #1 AND #2 HPAD 01-058-4590 8 EA

PL10101-11/R/210 HPAD O-RING, O-RING SIZE -127, 90 DUROMETER 00-166-1104 2 EA

10262-10/M/10 HPAD O-RING, SIZE -342, 90 DUROMETER FOR #1 AND #2

HPAD 01-212-4623 8 EA

10262-10/M/13 HPAD PACKING, O-RING 0.755" ID X .097" ROUND CROSS

SECTION, -30/+500 DEG F SIZE -910, 90 DUROMETER 01-521-3406 8 EA

10300-60-2/H/7 LPAD COMPRESSOR UNIT, 1-1/2 H.P. PART 7 OF DWG

10300-60-2 01-090-9093 1 KT

10300-60-2/H/59 LPAD PACKING, PREFORMED, PACKING, PREFORMED SIZE -

916, 90 DUROMETER 00-167-5176 5 EA

10300-60-2/H/104 LPAD PACKING, PREFORMED, PACKING, PREFORMED SIZE -

221, 75 DUROMETER 00-166-8412 3 EA

10300-60-2/H/160 LPAD PACKING, PREFORMED, PACKING, PREFORMED, SIZE -

216 75 DUROMETER 00-165-1942 3 EA

10300-60-2/H/159 LPAD PACKING, PREFORMED, PACKING, PREFORMED SIZE -

125, 75 DUROMETER 00-322-6397 6 EA

10300-60-2/H/148 LPAD PACKING, O-RING 0.755" ID X .097" ROUND CROSS

SECTION, -30/+500 DEG F SIZE -910, 90 DUROMETER 01-521-3406 2 EA

10300-60-2/H/103 LPAD PACKING, PREFORMED, PACKING, PREFORMED SIZE -

012 75 DUROMETER 00-166-0980 8 EA

10300-60-2/H/99 LPAD O-RING, O-RING SIZE -904, 90 DUROMETER 0.351" ID

X .072" ROUND CROSS SECTION, -30/+500 DEG F 00-167-5172 4 EA

10300-60-2/H/98 LPAD PACKING, PREFORMED, PACKING, PREFORMED SIZE -

010, 75 DUROMETER 00-166-0969 10 EA

10300-60-2/H/15 LPAD SWITCH,THERMOSTATIC, P/N: 1822L4-8-15, FOR LPAD

OPEN @ 248 DEGREES F, CLOSE @ 221 DEGREES F 01-093-8296 1 EA

Act Qty

UI

PL12424404/C/26 HPAC SEAL – SPLIT OIL 01-068-9623 2 EA

PL12424404/C/65 HPAC GASKET – DRIVE COVER 01-539-1034 2 EA

PL12424404/C/540 HPAC GASKET – OIL PUMP COVER 01-057-5856 2 EA

10300-60-2/H/44 LPAD VALVE,SUCTION, REFRIGERANT SERVICE P/N: 31529-1 01-091-7750 1 EA

10300-60-2/H/43 LPAD VALVE,DISCHARGE, REFRIGERANT SERVICE 01-091-7749 1 EA

10300-60-2/H/34 LPAD VALVE,LINEAR,DIRECT, 4-WAY MANIFOLD MOUNTED 01-091-1494 1 EA

10300-60-2/H/31 LPAD VALVE, TOWER SWING CHECK, 3/4”

P/N: 5299-003 00-483-0680 2 EA

10300-60-2/H/39 LPAD FILTER-D, DRYER, REFRIGERANT 00-950-6997 1 EA

6388-44/C/5 HPAD PACKING, PREFORMED, PACKING, PREFORMED SIZE -

912, 90 DUROMETER 00-167-5175 2 EA

6680-38/D/3 LPAD FILTER ELEMENT, AFTER FILTER 00-780-7565 3 EA

6680-38/D/13 LPAD PACKING, PREFORMED, PACKING, PREFORMED SIZE -

906, 90 DUROMETER 00-165-1981 1 EA

6680-38/D/2 LPAD PACKING, PREFORMED, PACKING, PREFORMED SIZE -

345 75 DUROMETER 00-184-3472 2 EA

10278-8/E/7 LPAD GASKET, 50" X 50" X 1/16" THK. 01-392-2760 1 SH

10278-8/E/3 LPAD DISK ASSEMBLY, DESICCANT TOWERS 01-168-9565 2 EA

10340-4/B/2 LPAD FILTER ELEMENT, PREFILTER 00-864-7737 3 EA

10340-4/B/4 LPAD SEAL,PLAIN, FOR PREFILTER 01-311-5916 1 EA

10340-4/B/9 LPAD GASKET, FOR PREFILTER AUTO DUMP 01-094-0043 1 EA

10340-4/B/5 LPAD VALVE ASSY, AUTO-DUMP 01-101-7431 1 EA

15-0181/J/1-W LPAC VALVE, CHECK 01-301-9076 1 EA

15-0181/J/5-D LPAC VALVE, CHECK 00-451-2682 1 EA

15-0181/J/35 LPAC ORIFICE PLATE, BRASS 01-091-4069 1 EA

15-0181/J/47 LPAC ORIFICE PLATE, BRASS 01-125-5543 1 EA

0501-6// LPAD PARTS KIT, AUTO DRAIN, PC5,7,12,19,21,22,23,&34 00-112-0079 1 KT

ALL UNITS GREASE,B, ROLLER BEARING 00-149-1593 1 CN

HPAD

LPAD LUBE OIL, 7.75 GALLONS, PER COMPRESSOR 01-370-2583 5 CN

HPAD

LPAD

DICHLORODIFLUOROMETHANE, REFRIGERANT R-12,

10LB CYL 00-264-9089 1 CY

HPAD

LPAD CYLINDER, COMPRESSED EMPTY R-12 BOTTLE, 42 LBS 01-355-4017 1 EA

HPAD RESISTOR, THERMAL, 5TH STAGE RTD 00-583-6621 1 EA

5. QUALITY ASSURANCE SURVEILLANCE PLAN:

5.1. Purpose: To ensure that the Government has an effective and systematic method of surveillance for the services in the SOW. The QASP will be used primarily as a tool to verify that the contractor is performing all services and delivery/installation of replacement parts required by the SOW in a timely, accurate and complete fashion.

6. DELIVERABLE ITEMS:

6.1. Provide deliverables as described in the Statement of Work (SOW) and as outlined for format and delivery schedule in Contract Data Requirements Lists (CDRLs):

Number Name Frequency Quantity A001 Condition Found Report one time one each A002 Acceptance Test Report (ATR) one time one each