This document is a draft Scope of Work (SOW) for a federal contract opportunity to provide camera inspection and video cleaning services for the Tioga Dam and Mansfield Levee System located in Tioga County, Pennsylvania.

The SOW covers three separate features of work at Tioga Dam (8-inch tile drain, left abutment drain, and right abutment drains) and various drainage structures, toe-drains, and pump stations at the Mansfield Levee that require video inspection and cleaning. The contract also requires removal of sediment, rocks, debris, and vegetation from the identified features. Some work will require qualified dive crews. The contract duration is estimated at 365 calendar days. The solicitation is anticipated to be released on or about August 15, 2024, with responses due by September 16, 2024 under a full and open competition using a best value tradeoff source selection process. A pre-proposal conference is estimated for August 27, 2024.

View the file

Other files

File Type Posted
SOW_APPENDIX-A.pdf PDF
SOW_APPENDIX-D.pdf PDF
SOW_APPENDIX-B.pdf PDF
SOW_APPENDIX-C.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CAMERA INSPECTION SCOPE OF WORK

Tioga Dam, PA

Mansfield Levee, PA

SCOPE OF WORK

1. Overview

The work involves video inspection and some cleaning of the features at Tioga dam and Mansfield Levee owned by the Baltimore District US Army Corps of Engineers. The Contractor shall provide all labor, supervision, materials, equipment and supplies to complete the work stated in the Scope of Work (SOW).

2. Tioga Dam

2.1 General

Tioga-Hammond Lakes are located on the Tioga River and Crooked Creek in Tioga County, Pennsylvania, approximately 8 miles south of the Pennsylvania-New York State boundary. Tioga- Hammond Lakes have two separate dams, Tioga and Hammond dams, connected by a weir channel. The Tioga project site is located on the Tioga River about 1.7 miles upstream from its confluence with Crooked Creek (Latitude 41.898549, Longitude -77.13638). The project is owned, operated, and maintained by U.S. Army Corps of Engineers, Baltimore District. The primary features of the Tioga dam include an earthen embankment, an outlet conduit with associated gate control tower and stilling basin, and a connecting weir channel between the two reservoirs. The left and right directional references made within this scope are in relation to facing the downstream side. Refer to figure 1 in appendix A for project location.

2.2 Features of Work

Three separate features of work at Tioga Dam are covered within this scope for performing the camera inspection and any associated cleaning as required. These three features of work are stated below along with their descriptions. Figure 2 in appendix A shows an aerial view of the general location for these features of work and more details are provided in the subsequent figures.

2.2.1 8-inch Tile Drain

Original construction drawing records show that an 8-inch diameter tile drain is located on each side of the Outlet Works Structure. The length of this tile drain is approximately 900 feet on each side. The exact alignment of the tile drain is unknown, but the estimated alignment is projected in figure 4 and figure 5 in appendix A. Outlet Works section views at different stations highlighting the tile drain are shown in figure 6 and figure 7 in appendix A. Based on the original construction specifications, the tile drain conforms to the requirements of ASTM Designation C4, Heavy-Duty Drain Tile. The tile drain is surrounded by processed gravel and select pervious material around

it. The tile drain was installed 2.5 feet above the finished channel grade or invert elevation of the conduit as shown in the tile drain details. The elevation of the tile drain varies with grade of the outlet channel, therefore bends are present within the tile drain. The camera shall be able to maneuver and travel the full length of the tile drain in the upstream direction.

It shall be noted that the exit location of the tile drain is not visible, and it may be located further downstream of the stilling basin walls. Section L/72 in Figure 6 and the plan view in Figure 5 show that an 8-inch diameter asbestos outlet pipe is connected to the tile drain for discharging the flow into the stilling basin. Contractor’s dive crew shall try to locate the exit location of the tile drain prior to the inspection, which may be submerged under water. If the exit location of the tile drain is not located, the camera shall be inserted from the 8-inch diameter asbestos outlet pipe located within the stilling basin. The camera shall be able to make the turn into the 8-inch tile drain given the bends shown on referenced drawing sheets and travel upstream for the full length of the 8-inch tile drain.

Contractor will be required to hire qualified dive crew for performing the camera work within the stilling basin and locating the exit location of the tile drain. All the requirements of Corps of Engineers Safety and Health Requirement Manual EM 385-1-1 must be met for the dive operations. For the camera works to take place from within the stilling basin, the flow of water will need to be shutoff for a very limited period of time for providing contractor access into the stilling basin. The flow of water will be shutoff for an hour and then released for a duration of time before the next shutoff period. The duration of release before the next shut-off period will be determined by the Baltimore District Water Management Section based on the existing weather conditions.

Contractor shall assume that duration of release before the next shut-off period can be between 1 to 4 hours. Contractor shall notify the Dam Operator a minimum of one week prior to any desired shut down of flows in the stilling basin.

2.2.2 Left Abutment Drain

A storm drain (BCCGMP) is located on the left abutment as shown in the plan and profile views in Figure 8 to Figure 11. The storm drain system collects surface run-offs and flows from the Treatment Plant/Chlorinator House and discharges into the outlet channel. The storm drain line from the Treatment Plant/Chlorinator House to the centerline of the main Tioga embankment is a 15-inch diameter pipe. From the centerline of the Tioga embankment to its discharge end into the outlet channel, the drain pipe diameter transitions to 24-inches. The total length of this drain line is approximately 2065 feet. The storm drain system consists of a series of manholes and inlets as shown in the referenced figures stated above. Refer to Figure 12 and Figure 13 of Appendix A for manhole and inlet details, respectively. The entire length of the storm drainpipe from approximate Access Road station 89+50 to its discharge end into the outlet channel shall be video inspected.

All of the associated manholes and inlet structures present within this length shall be video inspected to document their conditions.

The storm drain pipe may have accumulated sediments and shale fragments coming from the adjacent hillside slopes. Contractor shall be required to flush the entire length of the storm drain line prior to the video camera inspection.

2.2.3 Right Abutment Drains

There are two separate drainage lines located at the right abutment. One of the drainage lines consists of a 36-inch diameter storm drainpipe, whose intake is located slightly downstream of the dam axis and the outlet is located several feet on the upstream right abutment. This drainage line is referred to as Right Abutment Upstream Drain within this Scope of Work. The length of the Right Abutment Upstream Drain line is approximately 1400 feet. Refer to Figure 3 and Figure 14 of Appendix A for plan and profile views of the Right Abutment Upstream Drain, respectively.

There is a metal grate present in front of the intake structure, which will require removal for the inspection. This grate will be difficult to remove and it is anticipated that excavation will be required to remove the boulders around the intake structure for grate removal. Contractor shall put the metal grate back in place after completion of the inspection. The invert elevation of drain pipe at its outlet end is at 1050 ft. The normal summer and winter pools at Tioga dams are 1081 feet and 1061 feet, respectively. Water is expected to be present within this pipe to its full depth up to a length where the water elevation in the pipe is equal to the lake elevation.

The second drainage line is for an underground drainage system, consisting of a 36-inch diameter perforated BCCGM pipe, surrounded by processed gravel. This drainage line is referred to as Right Abutment Downstream Drain within this Scope of Work. The length of the Right Abutment Downstream Drain line is approximately 1000 feet. The drain pipe within this line starts at manhole 1 and ties into the junction point at manhole 2. At manhole 2, there’s also a 24-inch perforated BCCGM pipe that enters into it from the US-15 Highway drain extension. Based on the distance from manhole 2 to US-15 Highway crossing, this distance is approximately 600 feet. Combined flow from manhole 2 is carried further downstream within the perforated pipe section and discharges from an outlet structure located near the downstream toe of the right abutment. Refer to Figure 3, Figure 15 through Figure 17 of Appendix A for plan, profile, and detail views of the underground drain and associated manholes, respectively. The two drainage lines shall be fully video inspected along with the 24-inch inch diameter perforated pipe coming from the US-15 Highway drain extension. The video inspection length for the 24-inch diameter pipe shall be up to the US-15 Highway crossing. Manhole 1 and manhole 2 shall be video inspected to document their conditions.

2.3 Site Access and Manholes Entrance

Site access to the manholes located on both left and right abutments are on steep slopes with vegetation. Contractor shall note that accessing the manholes for the purpose of camera inspection may require building temporary access routes. Contractor will be required to communicate with dam staff and provide the plans for the construction of these access routes for approval. The access routes can be left in place upon completion of work at the discretion of the dam staff. Contractor shall note the dimensions of the manholes provided in the reference sheets for complying with safety requirements such as confined space entry and fall protections. Refer to the Accident Prevention Plan under the Special Conditions section within this scope for further requirements.

3. Mansfield Levee Protective Works

3.1 General

The Borough of Mansfield is located at the head of the Tioga Reservoir on the right bank (east side) of the Tioga River approximately 10 miles upstream (southeast) from Tioga dam. US-15 Highway (trending north-south) and US-6 Highway (trending east-west) intersect in the business district Borough of Mansfield. Corey Creek, which is a significant westerly flowing tributary of Tioga River, passes through Mansfield and joins the Tioga River approximately 1,900 feet downstream from the US-6 Highway bridge over the river. Refer to Figure 1 Appendix B for location of the Mansfield Levee.

The Mansfield levee works project involves an 11,740 feet long earthen levee on the right (eastern) side of Tioga River and a below grade 3,000 ft long concrete conduit over Corey Creek.

Corey creek flows from the east to the west and empties into Tioga River. The conduit divides the earthen levee in two sections – an 8,240 feet long levee section upstream of the conduit extending from Levee Station 70+00 to 152+00 and another section that is downstream of the conduit.

Three drainage structures (DS 1, 2, and 3) and three pump stations (PS 1, 2 and 3) are present at the levee at various stations. Refer to Figure 18 and Figure 19 in appendix B for location of pertinent features.

3.2 Features of Work

Mansfield Levee has utility lines for the toe-drain, storm drain, sanitary sewer, and water main present at the site. Several of the storm drains, sanitary sewer drains, and water mains belongs to the non- USACE entities such as the Borough of Mansfield. Some of these utility lines goes through the pump stations and drainage structures on site, which are described in the following sections. For the purpose of this scope, only the highlighted utility lines for the toe-drain, storm drain, and sanitary sewer drain shown in Figure 20 to Figure 27 and Figure 35 to Figure 36 of Appendix B shall be video inspected. Utility lines to be video inspected are also highlighted in profile and section views of the referenced figures. The features of work to be video inspected and cleaned are described in the subsequent section.

3.2.1 Toe-Drain

A toe-drain to discharge the seepage flow exists along the entire length of the landside toe of the levee, except in the vicinity of the U.S. Route 6 Bridge over the Tioga River (Station 91+00 to 96+00) and the upstream portion where Route 15 crosses the levee (Station 146+35 to 152+25).

The length of the toe- drain line is approximately 10,650 feet. The toe-drain system intercepts the seepage and carry the water to the pump stations from where it is discharged into the river. The toe-drain has an Asbestos-Treated bituminous Coated Corrugated Steel Pipe (ACCMP) that is perforated on its underside and varies in diameter from 12 to 21 inches and is laid within a 4-ft thick layer of processed pervious fill. A series of manholes are present at different locations along the length of the levee which ties the toe-drain system to the pumping stations and are used for inspection and maintenance of the toe-drain. The entire length of the toe-drain pipe shall be video inspected. All of the associated manholes with the toe-drain system shall be video inspected to document their conditions. The toe-drain and associated manholes may have accumulated sediments and sludge. The entire length of the toe-drain pipe and associated manholes shall be flushed prior to performing the video camera inspection. Contractor shall submit their plan for flushing the toe-drain and associated manholes for approval by the Geotechnical Branch.

3.2.2 Interior Drainage Areas

3.2.2.1 Drainage Structure No. 1

Drainage Structure No. 1 is located at Station 98+92 and is a gravity flow structure. It houses two-84- inch diameter, 79.5-foot-long reinforced concrete pipes that extend from the landside to the riverside. The discharge outlet structure has 18-inch-thick flared wing walls and two large flap gates for the two- 84-inch diameter pipes at the end. The two-84-inch diameter pipes are NOT to be included in the video inspection. In addition to these large flap gates, there are also two smaller flap gates located on the wingwalls of this drainage structure, which carries discharges from Pump Station No. 1 into the riverside. The video inspection of the pipes coming from Pump Station No. 1 and exiting into Drainage Structure No. 1 are required and further discussed in section 3.2.3.1. The riverside slope at this drainage structure is protected with 18-inch-thick riprap over 6-inch bedding material that extends from behind the outlet wing walls to the crest of the levee. The landside slope is grass covered.

3.2.2.2 Drainage Structure No. 2

Drainage Structure No. 2 crosses the levee at Station 72+32, extends beneath Corey Creek, and crosses the levee again at Station 62+18. There is a 48-inch diameter reinforced concrete pipe encased in concrete for an approximate length of 470 feet, which is also referred to as the Sag Culvert. A 6-inch diameter cleanout pipe branches off from the 48-inch diameter pipe and exits into Pump Station No. 3. A 120-ft long 72-inch diameter gravity drainage pipe is also present at Station 72+32 with its landside invert at El. 1114.9 feet NAVD88 and its outlet into Corey Creek at El. 1112.3 feet NAVD88. Two control manholes, Control MH #1 and Control MH #2 are present at stations 72+32 and 62+18, respectively. These pipes along with the control manholes and the intake and outlet structures, shall be video inspected to its full length, as shown in Figure 21, FIGURE 22, and Figure 33 of Appendix B.

3.2.3 Pump Stations

Three pump stations are present near the drainage structures as shown in Figure 19 of Appendix B. In general, the function of these pump stations is to discharge seepage from the toe-drain system and the combined sanitary and sewage overflow over the levee protection works. The principal features of the pump stations consist of a windowless brick-faced main building with underground concrete sumps, and underground discharge lines to the outlet structures. However, at Pump Station No. 3, a gravity discharge line with a control manhole is provided to discharge to the outlet structure. Pump station intakes consist of sewer overflow lines, toe-drain lines, an effluent line, and manhole drains. Contractor shall note that camera placement from inside the pump stations will be inaccessible and will therefore require access through either the manholes or exit locations.

3.2.3.1 Pump Station No. 1

Pump Station No. 1 is located at levee Station 99+88 and adjacent to Drainage Structure No. 1.

A 14-inch diameter and a 10-inch diameter discharge pipe is present to convey the water over the crest of the levee and drain it into the wing wall for Drainage Structure No. 1 adjacent to the river channel. Both the 14-inch and 10-inch discharge pipes are provided with flap gates at the outlet end. These discharge pipes are provided with an air relief chamber at the top. Within the air relief chamber, there is also a 4- inch diameter drain pipe that discharges onto the landward side of the levee. The 14-inch, 10-inch, and 4-inch diameter pipes along with the air relief chambers shall be fully video-inspected as shown in the plan and profile views (Figure 35 of Appendix B).

3.2.3.2 Pump Station No. 2

Pump Station No. 2 is located at levee Station 76+65 and to the west of Drainage Structure No.

2. A 14- inch diameter and a 10-inch diameter discharge pipe is present to convey the water over the crest of the levee and drain it into the outlet structure on the riverside. The pump station houses two electric pumps for the 14-inch discharge pipe and one seepage pump for the 10-inch discharge pipe. Both the 14-inch and 10-inch discharge pipes are provided with flap gates at the outlet end. These discharge pipes are provided with an air relief chamber at the top. Within the air relief chamber, there is also a 4-inch diameter drain pipe that discharges onto the landward side of the levee. The 14-inch, 10-inch, and 4- inch diameter pipes along with the air relief chambers shall be fully video-inspected as shown in the plan and profile views (Figure 35 of Appendix B).

A by-pass culvert is present between levee stations 76+00 to 77+00 on the landward side, as highlighted in Figure 21, which shall also be included in the video inspection.

3.2.3.3 Pump Station No. 3

Pump Station No. 3 is located at levee Station 58+21 and has the additional function of discharging effluent during high river stages. A 16-inch diameter and a 10-inch diameter discharge pipes are present to convey the water over the crest of the levee and drain it into the outlet structure on the riverside. A 16-inch diameter effluent gravity flow discharge pipe that is encased in concrete comes in from Manhole No. 1G and passes along the outside wall of this pump station and through the levee embankment and discharges into the outlet structure at this location. A sluice gate operated from the control manhole on levee crest controls the effluent discharge pipe, while a flap gates allow water to discharge through the 16-inch and 10-inch discharge pipes. This pump station houses three electric pumps for the 16-inch discharge pipe and one seepage pump for the 10-inch discharge pipe. These discharge pipes are provided with an air relief chamber at the top. Within the air relief chamber, there is also a 4-inch diameter drain pipe that discharges onto the landward side of the levee. The 16-inch, 10-inch, 16-inch (effluent discharge pipe), and 4-inch diameter pipes along with manhole 1G, control manhole, and air relief chambers shall be fully video-inspected as shown in the plan and profile views (Figure 36).

4. Sediment Removal & Cleaning

Properly remove all sediment, rocks, debris, and vegetation from the Left Abutment Drain covered in section 2.2.2 and Mansfield Levee Toe-Drain & associated manholes covered in section 3.2.1. The cleaning equipment must be able to navigate turns within the specified pipes where cleaning is required. The interior surface area of such pipes, including the invert, shall be cleaned, and left exposed so that a camera inspection of the complete length of the pipe can be performed.

5. Spoils

Flushed sediments, rocks, debris, and vegetation from the pipes specified for cleaning shall be prevented from entering the downstream river channel with a sediment control system, such as sandbags, silt fences, etc. A spoil area on the project for the removed material will be designated by the Head Dam Operator/Levee Operator.

6. Camera Inspection

6.1 Television Camera Video-Taping (CCTV) Inspection: The complete length of the pipe shall be visually inspected by means of CCTV cameras. The CCTV inspection shall be performed by CCTV personnel trained and certified in the use of National Association of Sewer Service Companies’ (NASSCO’s) Pipeline Assessment and Certification Program (PACP). All CCTV inspections shall be performed in accordance with PACP standards including the specific date and time of inspection.

6.2 Camera: The camera used for the inspection shall be one specifically designed and constructed for such inspection. Lighting for the camera shall be suitable to allow a clear picture of the entire periphery of the pipe. The camera shall be operative in 100% humidity conditions. The camera shall include 360-degree pan, zoom, and tilt capabilities with a minimum resolution of 720P. The camera, television monitor, and other components of the video system shall be capable of producing picture quality to the satisfaction of the Government. Manholes and inlets should be fully video inspected with a camera having a minimum resolution of 720p with adequate lighting to clearly show conditions. The designation of the manhole or inlet should be included in the video.

6.3 Camera Inspection Rate: The camera shall be moved through the line in either direction at a moderate rate, stopping when necessary to permit proper documentation of the pipe’s condition. In no case will the camera be advanced at a speed greater than 25 feet per minute.

7. Storm Events

During and subsequent to rain events, the river stages can rise, increased flows from the stilling basin and the drainage structures can be expected. These situations pose a significant safety risk to human health and damaging equipment. The contractor should not perform work when conditions are capable of flooding the pipe due to storm events. The contractor is responsible for removing personnel and equipment from the area before and during inclement weather.

8. Deliverables

Documentation of the inspection results shall be as follows:

8.1 Camera Inspection Logs Deliverables: Electronic media location records shall be kept by the Contractor and will clearly show the location, by distance in 1/10 of a foot from the downstream terminus of pipe or the gate. In addition, other points of significance such as locations of unusual conditions, roots, cracks, fractures, broken pipe, presence of scale and corrosion, and other discernible features, as defined in the PACP defect codes, will be recorded on electronic media and will be supplied to the Government. It is Required that contractor logs be delivered as a submittal and reviewed by Government for approval.

8.2 Inspection Report Deliverable: A contractor furnished report will be generated detailing the findings of the cleaning operation and camera inspection findings. The contractor furnished report will include inspection notes, detailed findings diagrams and documentation of defects.

It is Required that contractor report be delivered as a submittal and reviewed by Government for approval.

8.3 Inspection Digital Photographs Deliverables: Detailed inspection photographs of the pipe condition and all defects shall be taken by the Contractor. Photographs shall be located by distance in 1/10 of a foot from the downstream terminus of pipe or the gate. It is required that contractor digital photographs be delivered as a submittal and reviewed by Government for approval.

8.4 Inspection Video Recordings Deliverable: Inspection video recording shall be collected to supply a visual and audio record of the drain’s condition, including problem areas. Two copies of the recordings will be delivered to the Government upon completion of the inspection. It is Required that contractor video recordings be delivered as a submittal and reviewed by Government for approval.

9. Work Plan:

A submittal detailing the Contractor plans for the cleaning and inspection shall be submitted at least 30 days prior to the start of work. The submittal will include the following information:

a. Detailed list of the equipment to be used for the cleaning and inspection of the drains.

b. Estimated date for cleaning and inspection to take place.

c. Plan detailing the water source that will be utilized during the cleaning effort.

10 SPECIAL CONDITIONS

10.1 OPSEC Security Requirements:

10.1.1 Site Security. All personnel working on this project will be required to follow all security and access rules and regulations (i.e., physical access and/or network access requirements) as set forth by the US Government in order to gain access to the USACE offices and/or systems to perform work assignments and/or for the delivery of equipment.

10.1.2 All contractors and all associated sub-contractors employees shall comply with applicable installation, facility and area commander installation/facility access, and local security policies and procedures (provided by Government representative). The contractor shall also provide all information required for background checks to meet installation/facility access requirements to be accomplished by the installation Provost Marshal Office, Director of Emergency Services, or Security Office. The contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA, and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or facility change, the Government may require changes in contractor security matters or processes.

10.1.3 Keys or security codes to access gated or secured project facilities will be provided by the Government for the execution of this contract. These keys are to be used exclusively for completing the duties prescribed in this contract. Any use of Government keys for other than the performance of this contract is strictly prohibited. Making duplicate keys is prohibited. Such improprieties shall include recommending the termination of the employee(s) and possible default of the contractor. Any loss of keys will be reported to the Contracting Officer Representative (COR) within 24 hours. If keys are lost or cannot be returned at the end of the contract period, the Government shall deduct $300 per key from the Contractor’s final invoice.

10.1.4 Keys or security will not be issued to provide access to highly secure areas located at the dam. The contractor must provide a list of employees and driver’s licenses of those who will work behind locked gates at the dam at least 30 days before performing work. The contractor must schedule access a minimum of one week in advance to these secure and restricted areas with the COR.

10.1.5 Employees

10.1.5.1 All contractor employees working on this contract shall be citizens of the United States of America, be an alien who has been lawfully admitted for permanent residence as evidenced by an Alien Registration Receipt Card, Form 1-151, or present other evidence from the INS that employment will not affect his/her immigration status.

10.1.5.2 All persons hired by the contractor during the course of the contract shall be at least 18 years of age and shall possess a valid state driver’s license. The contractor shall ensure that the COR is able to communicate in the English language.

10.1.5.3 The contractor and all contract employees shall be subject to the rules and regulations provided in Title 36 of the Code of Federal Regulations, Section 327, during the performance of the contract.

10.1.5.4 The contractor and employees shall not use or be under the influence of drugs or alcohol at any time while performing the obligations of this contract. During an on-duty status, the contractor and contractor representatives must hold themselves to the standard of acceptable behavior expected of the public and to all rules and regulations governing Corps property and facilities. Unacceptable behavior, deemed so by the COR, that brings discredit to the Government, or the contractor may be grounds for barring the employee(s) from access to Federal property or termination of the contract.

10.1.5.5 All Contractor and Employees, including subcontractors who do not have the appropriate security clearance or access privileges, shall be escorted in areas where they may be exposed to classified and/or sensitive materials and/or sensitive or restricted areas inside the gated areas of the dam and spillway.

10.1.5.6 The Contractor shall pre-screen Candidates using the E-verify Program (http://www.uscis.gov/e-verify) website to meet the established employment eligibility requirements. The Vendor shall ensure that the Candidate has two valid forms of Government-issued identification before enrollment to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible Candidates shall be provided to the COR no later than one week prior to the pre-work meeting.

10.1.5.7 Identification of Contractor and Employees: The employee identification which must be worn while performing the task associated with this contract, will be in the form of a permanently attached patch, logo, or company name on the breast pocket or left shoulder reflecting the company identification. All vehicles and equipment shall also be easily identifiable with the company name or logo at a minimum viewable from the passenger and driver side of the vehicle. Approved magnetic signs are acceptable.

10.2 Commencement of Work: Work shall be performed within 365 days of award. The start date will be coordinated with the COR.

10.3 COR, Government Designated Representative, or the Baltimore District, Geotech Branch staff must be present during the cleaning process to ensure that the dam features are not damaged during the cleaning process.

10.4 Maintaining Infrastructure: Contractor shall ensure all methods of sediment removal do not damage the existing pipe and adhere to all Local, State, and Federal guidelines and regulations involved in the disposal of materials.

10.5 Performance of Work: The Contractor shall perform work only during normal Corps of Engineers duty hours (7:30 a.m. to 4:00 p.m., Monday through Friday, excluding national holidays). Exceptions to this condition must be coordinated with and approved in advance by the COR.

10.6 Insurance: The contractor shall provide insurance as required in Clause 52.228-5 “Required Insurance”. Before the start of contract work, the Contractor shall furnish to the COR a current certificate or written statement of insurance requirements of the contract.

Policies evidencing required insurance shall contain an endorsement to the effect that cancellation or any material change in policies adversely affecting the interests of the Government in such insurance shall not be effective for such period as may be prescribed by the Laws of the State in which this contract is to be performed and in no event less than thirty (30) days after written notice thereof to the Contracting Officer.

10.7 Accident Prevention: In performing this contract the Contractor shall comply with all current Federal, State and Local safety regulations, including Corps of Engineers Safety and Health Requirement Manual EM 385-1-1 and shall comply with any subsequent changes. If the contractor utilizes equipment that anticipates the need for fall protection, proper equipment, and certifications to perform the work is required. If human entry is anticipated to facilitate the cleaning, a confined space plan and the required certifications to perform work in a confined space is required. The Corps of Engineers Safety and Health Requirement Manual EM 385-1-1 may be found on the World wide web at the below address:

https://www.publications.usace.army.mil/portals/76/publications/engineermanuals/em_385-1- 1.pdf.

Prior to commencement of work under this contract the Contractor shall furnish the following for approval by the Government:

A. Accident Prevention Plan Section I, Article 01.A.12, EM 385-1-1, dated 30 Nov 14 B. Activity Hazard Analyses Section I, Article 01.A.14, EM 385-1-1, dated 30 Nov 14

10.8 Accident Reporting: In the event of an accident or injury involving contractor personnel or equipment in performance of work, the Contractor shall immediately notify the COR by the most expedient means feasible. If instructed so, the Contractor shall complete forms furnished, and/or provide a written description of the incident within 24 hours of notification to do so.

10.9 Operations and Storage Areas: The Contractor shall confine all operations (including storage of materials) to areas authorized or approved by the COR The Contractor shall hold and save the Government, its officers and agents free and harmless from liability of any nature occasioned by the Contractor’s performance.

10.10 Housekeeping: The Contractor shall keep the work area, including storage areas, free from accumulations of waste materials. Before completing the work, the Contractor shall remove from the work site and premises, any rubbish, tools, equipment and materials that are not property of the Government. Upon completing the work, the Contractor shall restore the work area to the original condition, satisfactory to the Contracting Officer.

10.11 Environmental Protection: The Contractor is required to comply with all Federal, State and Local environmental regulations.

http://www.publications.usace.army.mil/portals/76/publications/engineermanuals/em_385-1-

10.12 Permits and Licenses: The Contractor shall, at his/her own expense, obtain any license or permits required to perform the contract. The Contractor shall comply with all Federal, State and Local laws and regulations and shall comply with any subsequent changes.

10.13 Records and Reports: In addition to the administrative requirements dictated elsewhere in this contract, the Contractor shall complete a Daily Construction Quality Control Report form to maintain record of contract performance, accident/injury incidence, and observance of project deficiencies. Forms will be distributed at pre-work conference.

10.14 Superintendent: The Contractor shall act as or provide a Superintendent who is responsible for quality control whenever the work specified herein is being performed. The Superintendent shall conduct overall management coordination and be the central point of contact with the Government for performance of all work under this contract. The Superintendent and any individual designated to act for him/her shall have full authority to contractually commit the Contractor for prompt action on matters pertaining to the administration of the entire contract. Such authorization shall be submitted in writing to the Government representative. The Superintendent shall deal directly with the designated, for normal day-to-day administration of the contract provisions. Superintendent’s (s) will be required to attend pre-work conference prior to commencing work under this contract.

10.15 Project Operation: Tioga Dam and Mansfield Levee are flood control projects and the Contractor’s access to the work areas and the execution of the requirements specified herein shall not interfere with the daily operations of the projects or employees. It is the responsibility of the Contractor to coordinate all work with the Dam/Levee Operator.

10.16 Invoices and Payment:

10.16.1 Invoices: The Contractor shall submit itemized invoices no later than 15 days from the completion of the total contract activity. The invoice shall accurately reflect the work completed. Each invoice at a minimum shall contain the following information:

• Contractor name and address, exactly as it appears on the contract

• Contract number

• Date of invoice submission

• Actual dates of work performed noted on each invoice

• Invoice or Call Order number

• Invoice Total

10.16.2 Corrections: Incorrect invoices will be returned to the Contractor for correction before processing payment. Corrected invoices shall be re-dated to reflect the new submission date.

10.16.3 Remittance: Invoices shall be submitted via post-mail and/or electronic mail to the following address for payment. Should changes occur to the mailing addresses the Contractor shall be notified of the correct recipient.

VIA Post Mail: Tioga-Hammond

ATTN: Robert J. Schnell 710 Ives Run Lane

Tioga, PA 16946

VIA Electronic Mail: If submitting invoices electronically, please send invoices to all emails listed below.

Robert.J.Schnell@usace.army.mil James.S.Nixdorf@usace.army.mil Stephen.S.Sporer@usace.army.mil Nicholas.R.Hansrote@usace.army.mil mailto:Robert.J.Schnell@usace.army.mil mailto:James.S.Nixdorf@usace.army.mil mailto:Stephen.S.Sporer@usace.army.mil mailto:Nicholas.R.Hansrote@usace.army.mil

CAMERA INSPECTION SCOPE OF WORK
1. Overview
2. Tioga Dam
3. Mansfield Levee Protective Works
4. Sediment Removal & Cleaning
5. Spoils
6. Camera Inspection
7. Storm Events
8. Deliverables
9. Work Plan:
10 SPECIAL CONDITIONS