SOW.pdf

PDF 259 KB Posted

Attached to
LOS System Federal contract opportunity
Solicitation number
N0017824Q6829
Issued by
Department of the Navy Naval Sea Systems Command

About this file

This document is a Statement of Work (SOW) for a government contract opportunity related to the installation and testing of a Roll-On/Roll-Off (RO/RO) Line of Sight (LOS) communications relay solution on a Navy EC-130J aircraft.

The key requirements include providing a RO/RO MANET LOS upgrade with an LOS MANET radio compatible with the Persistent Systems Cloud Relay Layer-2 extension, supporting LOS communications over an S-Band RF datalink. The solution must integrate with switching network capability to test MEO and LEO satellite networks. The contractor is responsible for the design, manufacture, flight certification, and installation of the communications solution, as well as conducting testing and providing support for 20 weeks post-delivery. The work is unclassified, and travel will be limited to the minimum required. The related federal contract opportunity, N0017824Q6829, is a sole source RFQ for the required hardware solution and installation services, to be awarded to Persistent Systems and R4 Integration, Inc. The RFQ requires TAA compliant items, and award will be based on lowest price technically acceptable.

View the file

Other files for this federal contract opportunity

Other files attached to LOS System, newest first.
File Type Posted
updated SOW 6.24.24.pdf PDF
P0001.pdf PDF
LOS System Reqts List.xlsx XLSX spreadsheet
CDRL.pdf PDF
N0017824Q6829.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ROLL-ON/ROLL-OFF (RO/RO) BELLY MOUNT LINE OF SIGHT (LOS)

COMMUNICATIONS RELAY INSTALLATION AND TEST SUPPORT

STATEMENT OF WORK (SOW)

1.0 BACKGROUND

The Naval Surface Warfare Center, Dahlgren Division (NSWCDD), Unmanned & Expeditionary Weapon System (Code H), Weapon Control Test & Evaluation (Code H45), Battle Management Systems (BMS) program requires a flight-certified, communications relay solution for the integration of a belly mounted solution using Line of Sight (LOS) Mobile AdHoc Networking (MANET) Radio utilizing Multiple In / Multiple Out (MIMO) Antennas on a Navy EC-130J aircraft for testing of new capabilities in support of Air Force Special Operations Command (AFSOC). The integration is to be accomplished as a Temporary, Roll-On/Roll-Off (RO/RO) installation, with no permanent mechanical or electrical modifications to the aircraft.

2.0 APPLICABLE DOCUMENTS

2.1 Original Equipment Manufacturers (OEM) Specifications;

2.2 Center for Disease Control (CDC) Guidelines; and

2.3 Occupational Safety and Health Association (OSHA) Regulations.

3.0 REQUIREMENTS

3.1 The Contractor shall provide a RO/RO MANET LOS Upgrade to include an LOS MANET radio, which is compatible with the Persistent Systems Cloud Relay Layer-2 extension and shall support LOS communications over an S-Band RF datalink. The operation of the LOS upgrade shall not affect any other systems on the EC-130J aircraft.

3.2 The LOS solution shall be mounted in an approved EC-130J egress hatch location and must maintain hatch functionality while in operation.

3.3 The Contractor shall provide a LOS Relay Solution that can integrate into a switching network that allows an operator to switch between the desired satellite networks for capability testing on the aircraft for Medium Earth Orbit (MEO), and Low Earth Orbit (LEO) satellites. The RO/RO LOS Communication Upgrade shall include a MESH Network mobile waveform providing a self-healing, self-forming mesh network.

3.4 The Contractor shall attend a bi-weekly regular Integrated Product Team (IPT) meeting chaired by the Government Project Lead.

3.5 The Contractor shall be responsible for the design, manufacture, and flight certification of all hardware, including electronics and cable/harness assemblies. Approved system mounting location, as well as cable routing plans shall be coordinated with Government Project Lead and the Government aircraft operators.

3.6 The Contractor shall perform installation of the certified communication solution to the EC- 130J.

3.7 The Contractor shall conduct testing of the system to ensure proper functionality with the Technical Point of Contact (TPOC) present for confirmation.

3.8 The Contractor personnel shall wear personal protective equipment IAW OSHA regulations and CDC guidelines throughout the project.

3.9 The Contractor shall protect Government property from damage or disfigurement.

3.10 The Contractor shall complete all associated installs, tests and provide support twenty (20) weeks post delivery.

3.11 The Contractor shall coordinate with the technical point of contact (TPOC) identified below to schedule all required work and perform a final work-through to ensure installation is fully complete meeting the government’s requirements.

4.0 DATA DELIVERABLE

The Contractor shall provide data IAW CDRL A001.

5.0 GOVERNMENT-FURNISHED PROPERTY/MATERIAL/INFORMATION

(GFP/GFM/GFI)

None

6.0 SECURITY

The work to be performed under this contract is unclassified.

7.0 TRAVEL

The Contractor will conduct required local travel at no additional charge to the Government in performance of this contract. The number of trips and types of personnel traveling shall be limited to the minimum required to accomplish work requirements and shall be coordinated with the technical point of contact. All travel shall be conducted in accordance with the Federal Travel Regulations

(FTR).

8.0 TECHNICAL POINT OF CONTACT

Justin Ryan Mackay

NSWCDD/H45

Phone: (540) 653-9045 Email: justin.r.mackay3.civ@us.navy.mil