SOW.pdf

PDF 19 KB Posted

Attached to
Hydrovac & Sewer Cleaning Equipment Blanket Purchase Agreement
Solicitation number
3-B187-Q-00671-00
Issued by

About this file

This statement of work outlines the parts and on-site service requirements for Argonne National Laboratory's hydrovac and water jet equipment. The contractor must provide routine and emergency parts and service call-ins, both on and off-site, to maintain Argonne's RamJet Hydrovac and water jet lance equipment. The contractor is responsible for timely parts delivery, proper disposal of used chemicals at no cost, and keeping Argonne informed of regulatory changes and new equipment information. All parts and chemicals must meet original equipment manufacturer requirements. Contractor personnel are required to comply with Argonne on-site work and safety training. The contractor must also provide Argonne with price sheets for available parts and service call rates. On-site service may be required during or outside of normal business hours, including weekends and holidays on an emergency basis.

The related federal contract opportunity is a blanket purchase agreement with the Department of Energy Office of Science to provide hydrovac and sewer cleaning equipment under solicitation number 3-B187-Q-00671-00. The type of opportunity is listed as a solicitation.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ARGONNE NATIONAL LABORATORY

STATEMENT OF WORK

(Parts and On-Site Service)

08/09/2023

Contractor to provide the following:

• Routine/normal parts and service call-ins

• On and off-site servicing of RamJet Hydrovac and water jet lance equipment as required.

• Timely delivery of parts or service on an emergency/on-call basis.

• Proper disposal of all used (waste-generated) chemicals at no charge.

• New information / changes on present and future IDOT regulation as it relates to service, and materials to be sent to the MHT-Vehicle Maintenance Department.

• All parts and chemicals used must comply with original equipment (OEM) requirements.

• Vendor service personnel must comply with Argonne on-site work requirements including but not limited to Contractor Safety Training Orientation, ASE Applicable

Certifications, DOT Required Certifications, etc.

• Provide Argonne with line-price sheets of available parts and service call rates.

NOTE: Contractor must have proper equipment to perform repairs on-site.

Service may be required:

• Normal working hours: Monday through Friday, 7:30 am to 3:30 pm.

• Before/After normal working hours: Monday through Friday, before 7 am or after

3:30 pm.

• During Saturday or Sunday, Holiday Time, or if called on an emergency as-needed basis.

File details come from the government source that posted it. Updated .