SECTION 01 11 00 Page 1
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 11 00
SUMMARY OF WORK
08/15
PART 1 GENERAL
1.1 WORK TO BE PREFORMED
1.1.1 Project Description
1.1.2 Location
1.2 OCCUPANCY OF PREMISES
1.3 EXISTING WORK
PART 2 PRODUCTS
PART 3 EXECUTION
-- End of Section Table of Contents --
SECTION 01 11 00 Page 2
SECTION 01 11 00
SUMMARY OF WORK
08/15
PART 1 GENERAL
1.1 WORK TO BE PREFORMED
1.1.1 Project Description
The work includes installing a new canopy over the section of the front entrance for building 94. It requires the procurement of a new roof canopy of either standing seam insulated metal panels or acrylic panels. The canopy shall be installed using the existing roof beams for support of the new canopy and per the manufacturer’s installation requirements.
1.1.2 Location
The work is located at the front entrance of Building 94,
1.2 OCCUPANCY OF PREMISES
Building(s) will be occupied during performance of work.
1.4 EXISTING WORK
In addition to FAR 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements:
a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.
b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work.
At the completion of operations, existing work must be in a condition equal to or better than that which existed before new work started.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
Not used.
-- End of Section --