SOW.pdf
PDF 353 KB Posted
- Solicitation number
- 36C77622R0053
About this file
This document is a Statement of Work outlining Architect-Engineer design services required to upgrade infrastructure at the Perry Point VA Medical Center in Maryland to support a new Electronic Health Record Modernization system. Key details include:
-
The scope of design work involves upgrading facility fiber, adding data drops and electrical outlets, upgrading power and HVAC distribution, and conducting physical security assessments. Construction period services such as responding to requests for information and conducting site visits are also required.
-
The period of performance for design completion is 144 calendar days from notice to proceed. Construction period services will be exercised separately after award of the construction project.
-
The estimated construction cost is $32.8 million. This is a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses.
-
The solicitation number is 36C77622R0053. Submissions of SF330 qualifications are due by April 18, 2023. Firms will then be invited to provide written responses for evaluation and selection of the top-ranked firm.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| PPQ - EHRM DCVAMC.docx | DOCX document | |
| SOW Attachment 02 - VA OEHRM Site Infrastructure Requirements 2-0.pdf | ||
| 36C77622R0053_1.docx | DOCX document | |
| SOW Attachment 01 - VHA Required Div 01 Spec Sections.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VA Medical Center 01/17/2023 Perry Point, Maryland 21902
ARCHITECT-ENGINEER DESIGN STATEMENT OF WORK
EHRM INFRASTRUCTURE UPGRADES
PROJECT NO: 512A5-22-70
PROJECT NAME: EHRM Infrastructure Upgrades – Perry Point, Maryland
ESTIMATED CONSTRUCTION COST: $32,894,000
**The Certification and Accreditation (C&A) does not apply, a Security Accreditation Package is not required**
1. GENERAL INTENT:
The Contractor (herein referred to as “A-E”) shall provide Architect-Engineer (A-E) services to design a construction project at the VA Medical Center (VAMC) in accordance with this design statement of work.
2. SCOPE OF WORK:
A-E Part One Services (also known as Design Phase Services) for this design project include site visits, field investigation, studies, and user interviews to prepare drawings, specifications, and cost estimates for all facets of work and disciplines/trades to facilitate a construction project to upgrade the facility infrastructure to support the new Electronic Health Record Modernization (EHRM) system in accordance with VA OEHRM Site Infrastructure Requirements (provided by VHA). The project shall include, but is not limited to, upgrade facility fiber throughout the buildings to each Telecommunications Room (TR), provide a redundant fiber run throughout the facility to each TR, provide redundant fiber mains to the demarcation room from the provider point, install approximately 100 additional needed data drops, install approximately 75 new electrical outlets throughout the facility, provide additional power in each TR, upgrade facility power distribution as required, upgrade facility HVAC distribution as required, physical security assessment and upgrades, reconfiguration, expansion and renovation of existing space (demo, new construction, finishes, cable), datacenter work assess and upgrade fiber infrastructure backbone campus wide within buildings and between buildings, provide diversified path for WAN, and hazardous material abatement. Project buildings include: 1H, 2H, 3H, 4H, 4R, 362T, 363T, 5H, 6H, 8A, 11H, 11W, 13H, 14H, 15H, 15, 17H, 18H, 19H, 22H, 23H, 24H, 25H, 26H, 27H, 59, 80H, 82H, 101, 314A, 314C, 321, 360, 361, 364, 366, 504, T5 and site.
A-E Part Two Services (also known as Construction Period Services) for this design project include responding to construction contractor Requests For Information (RFIs) during the solicitation (solicitation support) and construction phases of the construction project; attendance at pre-bid, post-award, and commissioning kick off construction project conferences; review of construction material submittals and shop drawings; approximately
4 site visits per month during construction (both scheduled and emergent) to ensure compliance with the design drawings and specifications; preparation of site visit reports; coordination with project commissioning requirements (see Third-Party Commissioning under section 14); review of any construction project modifications for cost and technical acceptability; attendance and participation during the final acceptance inspection;
preparation of the punch list; and preparation of record drawings of the completed construction project based on the construction contractor’s as-built drawings. The A-E shall prepare a submittal log to be utilized by the VA during construction period services, maintain RFI log, and provide meeting minutes for weekly construction meetings throughout the duration of construction. All Part Two Services are optional line items and will not be exercised at the time of award.
The above paragraphs constitute a basic outline of the work to be accomplished, and in no way comprise all the details for design of this project. The A-E shall initiate detailed inspection of the project site to determine the needs and conditions for the design of this project. Copies of VAMC record drawings and the EHRM infrastructure readiness assessment documents will be made available to the highest rated A-E firm. The A-E will verify the validity of the record drawings prior to the start of design work and conduct site investigations as necessary throughout the design. SOW Attachment 09 - VAMC Campus Map will give the A-E firm a basic understanding of the VAMC campus. It is the A/E's responsibility to research the existing Government documents, determine those that are applicable to the project and request copies from the Government; the Government will not perform a search of Government documents to determine the information that the A/E may need during design.
Reference SOW Attachment 12 – EHRM Readiness Infrastructure Self Assessment.
The A-E shall be solely responsible for the management, including all associated labor, equipment, materials, mailing costs, and inspection, to meet the requirements of the design project. The A-E shall further provide meeting minutes for all meetings held under this design project.
The A-E firms’ representatives performing site investigations on VAMC campus must have the following additional requirements before starting site investigations on campus:
1. Negative TB Test within the past calendar year
2. N95 fit-tested and documented
3. Clear Face Shield
4. N95 mask with no vent; must be replaced when damaged or soiled
5. Pre and weekly negative COVID tests while working in patient care areas
6. Daily visit at check-in station for COVID and temperature screening; sticker/device must be worn visibly
7. Annual influenza shot is required for all staff performing work on VA campus
8. Contractor or representative must obtain and wear a contractor badge at all times while on campus
The temperature checks are performed on the VAMC campus and must be performed immediately when the contractor arrives on site. Temperature checks are currently performed at Buildings. If at any time an employee of the A-E firm is found in deficiency of the listed requirements, a stop work order will be issued for the safety of
VAMC patients. Any further questions, please reference SOW Attachment 07 - Seasonal Influenza with Vaccines.
When working in or travelling to VHA locations, the A-E must comply with the requirements detailed in VHA
Supplemental Contract Requirements for Combatting COVID-19 dated December 14, 2021. This document is included as SOW Attachment 11.
3. DESIGN WITHIN FUNDING LIMITATIONS:
The design shall be prepared by the A-E to permit the award of a construction contract, using Federal Acquisition
Regulation procedures for the construction of the facilities, at a cost that does not exceed the project’s estimated construction contract price of $32,894,000. The design project must comply with VAAR 836.606-71, Application of 6 percent architect-engineer fee limitation.
A/E is responsible to develop a design that can be built within budget and function as intended without change orders. The design must be based on the reality of existing site conditions and not solely on “As-Built” drawings.
The A/E as part of their site investigation is responsible for confirming all existing conditions that may affect the project construction.
Cost Estimating: A/E shall be responsible, as part of the Quality Assurance Plan, to develop procedures for tracking estimated construction costs throughout the project design. Cost estimates submitted as part of the submission requirements shall not be used as the sole method of meeting this requirement. The A/E shall notify the Project
Engineer (COR) when estimated construction costs exceed the construction budget. The A/E shall be responsible for proposing alternates to bring the project cost estimate within the construction budget. A/E shall modify design elements as necessary to keep the project cost estimate within the construction funding level. These changes shall be made at no additional cost to the Government.
Deduct Alternates: Shall be utilized in the best interest of the Government for market condition variations to maximize the use of available Government funds. The Government shall select the proposed alternates from the A/E recommendations. Deduct Alternates shall not be used to bring the projected project costs within construction funding. These alternates are designed to assure a contract award and are in addition to the requirement to have a project design and estimate at or below construction funding. Deduct Alternates may be formatted as value engineering options or omitted work. Omitted work deducts must not impact the general scope of the project. Add Alternates: Shall not be used.
4. DESIGN INDEPENDENCE, FURNITURE, AND EQUIPMENT:
Designs for construction must produce a “complete and usable” facility or improvement when constructed. VA policy (VHA Office of Capital Assets Management, Engineering and Support memo Updated Construction Guidance and Expectations dated Sep 12, 2016) requires the A-E to certify that their design (including all bid alternates/bid deducts) is independent of any future construction project. In addition, the A-E must certify that it has produced a design that does not include furniture and equipment that will be procured separately. Equipment that can be part of the design includes those items to meet code requirements for building occupancy; items covered in the
VA’s Master Construction Specifications (PG-18-1) Divisions 1 through 10, 13 through 26, or 28 through 48; non-
IT equipment items covered by Division 27; and items covered by Division Numbers 12 31 00, 12 32 00, 12 34 00, and 12 36 00.
The A-E shall submit as part of the Final Bid Documents submittal a signed letter on company letterhead stating the design’s independence.
5. DESIGN CRITERIA:
The VA Technical Information Library (TIL) available at http://www.cfm.va.gov/til/index.asp is managed by the VA
Office of Construction & Facilities Management and is the master repository for all VA Numbered Standards for
Construction to include design and construction specifications, procedures, standard details, BIM/CAD standards, equipment guides, space planning, and design guides. The documents of the TIL shall be the minimum design criteria for all VA projects performed in the construction of new facilities and the modernization, alteration, addition, or improvement of its real property. All design documents shall be developed in accordance with the VA
TIL, including (but not limited to) the following listed Department of Veterans Affairs References:
https://www.cfm.va.gov/til/PhysicalSecurity/dmPhySec.pdf
PG-18-1 Master Construction Specifications
SOW Attachment 01 VHA Required Division 01 Specification Sections List
PG-18-3
Design and Construction Procedures [Including but not limited to: Codes, Standards, and Executive Orders]
PG-18-4 Standard Details and CAD Standards
PG-18-5 Equipment Guide List
H-18-8 Seismic Design Requirements
PG-18-9 Space Planning Criteria
PG-18-10
Design Manuals (by discipline) [Including but not limited to: Guiding Principles checklists as indicated for Minor Projects in Sustainable Design Manual, Life Cycle Cost Analysis]
PG-18-12 Design Guides (graphical, by function)
PG-18-13 Barrier-Free Design Standard
PG-18-14 Room Finishes, Door, and Hardware Schedule
PG-18-15 A-E Submission Requirements, Volume C
PG-18-17 NEPA Interim Guidance for Projects
H-7545 VA Cultural Resource Management Procedures
See SOW Section 17 OIT Infrastructure Standard for Telecommunications Spaces v3.1 (1 July 2021)
The following references should also be used to complete the design documents:
▪ VA Standards Alert 017 – Infrastructure Standard for Telecommunications Spaces and all standards, guides, and manuals incorporated by reference (https://www.cfm.va.gov/til/sAlert/sAlert017.pdf)
▪ 00 VA OEHRM Site Infrastructure Requirements v2.0 (SOW Attachment 02)
▪ HEFP SEP Design Alerts 1-8 (SOW Attachment 03)
Where conflicts exist between VA adopted codes and standards and the documents on the TIL, the A-E shall bring this to the attention of the VA. The resolution of the conflict shall be made by the authority having jurisdiction for
VA to ensure consistency department-wide.
6. DESIGN COLLABORATION:
The A-E during this design project shall collaborate with the VHA Office of Healthcare Environment and Facilities
Programs Special Engineering Program (HEFP/SEP) staff, VISN 12, and the Independent Life Safety Review Agent
(LS Agent) for the project. Design submittal comments from these contractors, if concurred with by VA, shall be incorporated into the design. HEPF/SEP and/or VISN deliverables shall be coordinated with the A-E’s design submittals to ensure compliance with all requirements is met. The A-E is required to ensure all elements of the design adhere to the Life Safety Code, including recommendations for temporary construction barriers, prior to the Independent Life Safety review.
http://www.cfm.va.gov/cost/index.asp http://www.cfm.va.gov/cfm/til/room/RoomFinishes.pdf http://www.cfm.va.gov/CFM/TIL/cPro.asp http://www.cfm.va.gov/CFM/TIL/equip.asp http://www.cfm.va.gov/cfm/til/dGuide.asp http://www.cfm.va.gov/til/projReq.asp http://www.cfm.va.gov/cfm/til/dManual.asp https://section508.gov/ http://www.cfm.va.gov/CFM/TIL/seismic.asp http://www.cfm.va.gov/CFM/TIL/spec.asp http://www.cfm.va.gov/CFM/TIL/planning.asp http://www.cfm.va.gov/til/etc/NEPAGuidance.pdf http://www.cfm.va.gov/CFM/TIL/sDetail.asp?Pub_ID=584&FType=2 https://www.cfm.va.gov/til/dManual/dmTelecomm.pdf
7. INDEPENDENT LIFE SAFETY REVIEW:
The A-E shall incorporate any comments from the VA 3rd party life safety review.
8. ENVIRONMENTAL PROTECTION:
The A-E shall assist the VA with completion of a National Environmental Policy Act (NEPA) assessment as required by the VAMC. If the NEPA assessment results in potential environmental impacts, the A-E shall be responsible for completing any auxiliary documentation required per PG-18-17, NEPA Interim Guidance for Projects located on the TIL (http://www.cfm.va.gov/til/etc/NEPAGuidance.pdf). Additional requirements may include, but are not limited to, Environmental Assessment, Environmental Impact Statement, and Record of Decision. The NEPA analysis and concluding documentation must be completed by the Final Bid Documents submittal.
9. PHYSICAL SECURITY:
The A-E must include a certified physical security specialist. The specialists must be involved with the design, beginning with the concept phase, and the qualifications must be submitted to the COR for review and approval prior to the concept/basis of design phase. The specialists shall meet the specific requirements listed in the VA
Physical Security and Resiliency Design Manual (PSRDM) revised April 1, 2021, located on the TIL
(https://www.cfm.va.gov/til/PhysicalSecurity/dmPhySec.pdf). The A-E shall ensure that all applicable aspects of the VA PSRDM are incorporated into the design and shall prepare a written report acknowledging compliance as required by the VAMC. The A-E must inform the COR of any physical security items that will be difficult to achieve during the concept/basis of design phase and assist the VA with waiver requests as necessary.
10. TELECOMMUNICATIONS DESIGN:
In accordance with Telecommunications and Special Telecommunications Systems Design Manual, February 2016, (https://www.cfm.va.gov/til/dManual/dmTelecomm.pdf), paragraph 1.2 (d), “Telecommunications design must be performed and stamped by a BICSI® Registered Communications Distribution Designer (RCDD®) for all projects.”
11. SUBMITTAL REQUIREMENTS:
Design submittals shall follow the requirements of Program Guide, PG-18-15, Volume C, A-E Submission
Instructions for Minor and NRM Construction Program dated November 2008. This document is included as SOW
Attachment 06. Submittal documents shall be prominently marked “For Official Use Only (FOUO)” if they contain qualifying data as defined in VHA Memorandum 2019-11-13 Sensitive Infrastructure Data Classification - For
Official Use Only (FOUO). This memo is included as SOW Attachment 04, as it is hosted on a non-public VHA site.
The A-E shall deliver design submittal documents that follow the iterative phase breakdown for design work in
PG-18-15 and as additionally specified below. Specific requirements for each discipline/work product listed under each phase can be found in PG-18-15. It is expected for the phase of design that each of the checked items in the
SD/DD/CD columns will be completed for the submittal. The A-E shall attend a review meeting following each design submittal as indicated under the Project Schedule section of this Statement of Work. Each new submittal https://www.cfm.va.gov/til/Cx-RCx/CxManual.PDF http://www.cfm.va.gov/til/aeDesSubReq.asp http://www.va.gov/vapubs/viewPublication.asp will incorporate all VA comments from the previous submittal. The Asbestos Abatement requirements in PG-18-
15 are applicable at Tomah VAMC due to the age of the campus (construction began in the 1960s).
The following submittals will be required for this project:
▪ Quality Assurance/Quality Control (QA/QC) Plan
▪ Basis of Design (BD) - 10% - In addition to the requirements in PG-18-15, a Basis of Design is required.
Basis of Design is a narrative presentation of facts, sufficiently complete, to demonstrate that the project concept is fully understood, and that subsequent design details and their ultimate presentation in the final drawings and specifications will be based on sound architectural and engineering decisions.
Conceptual drawings of the planned design and the initial cost estimate will additionally be included.
▪ Schematic Design (SD) - 35% SCHEMATICS: A/E shall develop specific design needs and requirements with proposed alternatives. These documents are to be developed from the documents, meeting minutes and recommendations made during the conceptual phase. Any existing utilities and/or equipment which are to be incorporated into the project design shall be reviewed and evaluated to assure that they are indeed there and are in sufficient quantity and condition to do so. Documents for this task define project requirements based on the planned scope of work. All required functional requirements shall be identified and incorporated into the project. All Architectural and Engineering requirements shall be identified and incorporated into the project. A/E shall provide an evaluation of the coordination of the drawings between disciplines; identification of errors, omissions or conflicts found within or between drawings and specifications.
▪ Design Development (DD) - 65% Any existing utilities and/or equipment which are to be incorporated into the project design shall be further reviewed and evaluated to assure that they are indeed there and are in sufficient quantity and condition to do so. Documents for this task define project requirements based on the approved scope of work. These documents are to be developed from the documents, meeting minutes and recommendations made during the schematics phase. All required functional requirements shall be identified and incorporated into the project. All Architectural and Engineering requirements shall be identified and incorporated into the project. A/E shall provide an evaluation of the coordination of the drawings between disciplines; identification of errors, omissions or conflicts found within or between drawings and specifications. A/E shall provide an evaluation of schedule to meet operating plan, project phasing and market conditions which may affect bidding. It is expected that at the completion of this phase marks the completion of the data gathering portion of the project. The A/E shall have obtained all information required (including site visits) to proceed directly the preparation of
Construction Documents.
CONSTRUCTION DOCUMENTS: The A/E shall develop complete drawings and specifications and other documents necessary for the bidding and construction of this project. These documents are to be developed from the documents, meeting minutes and recommendations made during the design development phase. A/E shall perform an evaluation of the coordination of the drawings between disciplines; identification of errors, omissions or conflicts found within or between drawings and specifications. A/E shall provide an evaluation of schedule to meet operating plan Invitation for Bids and Award dates, project phasing, and market conditions which may affect bidding.
Special Remarks: Cost estimates shall incorporate construction related issues which include but are not limited to materials, systems and construction techniques. Design documents review, analyses and recommendation of cost estimates covering labor, materials, equipment, general conditions and requirements developed for the project. Estimates shall allow for incorporation of review comments, which are within the SOW.
8. DESIGN COLLABORATION:
The A/E during this design project shall collaborate with the VHA Office of Healthcare Environment and Facilities Programs Special Engineering Program (HEFP/SEP) staff, VISN 05 and the Independent Life Safety Review Agent (LS Agent) for the project. Design submittal comments from these contractors, if concurred with by VA, shall be incorporated into the design. HEPF/SEP and/or VISN deliverables shall be coordinated with the A/E’s design submittals to ensure compliance with all requirements are met. The A/E is required to ensure all elements of the design adhere to the Life Safety Code, including recommendations for temporary construction barriers, prior to the Independent Life Safety review.
9. AUTHORIZED CHANGES
The A/E shall only accept instructions and/or directions from the assigned Project Engineer. Changes in the project scope of work must be authorized by the VA.
Timely Response - As time is of the essence, particularly during the construction phase, the A/E shall promptly review and approve, disapprove or take other appropriate action upon all the VA requests.
10. INDEPENDENT LIFE SAFETY REVIEW:
The A/E shall incorporate any comments from the VA 3rd party life safety review.
11. ENVIRONMENTAL PROTECTION:
The A/E shall assist the VA with completion of a National Environmental Policy Act (NEPA) assessment as required by the Perry Point VA Medical Center. If the NEPA assessment results in potential environmental impacts, the A/E shall be responsible for completing any auxiliary documentation required per PG-18-17 NEPA Interim Guidance for Projects located on the TIL (http://www.cfm.va.gov/til/etc/NEPAGuidance.pdf). Additional requirements may include, but are not limited to, Environmental Assessment, Environmental Impact Statement, and Record of Decision. The NEPA analysis and concluding documentation must be completed by the Final Bid Documents submittal.
In addition, reference requirements of SOW Attachment 10 Environmental Regulatory Requirements for VAMHCS
Projects & SOW Attachment 11 “Attachment B for Environmental Regulatory Requirements”.
12. PHYSICAL SECURITY:
The A/E must include a certified physical security specialist. The specialists must be involved with the design beginning with the concept phase and the qualifications must be submitted to the COR for review and approval prior to the concept/basis of design phase. The specialists shall meet the specific requirements listed in the
Physical Security Design Manual for Mission Critical Facilities located on the TIL
(http://www.cfm.va.gov/til/PhysicalSecurity/dmPhySecMC.pdf). The A/E shall ensure that all aspects of the applicable VA Physical Security Design Manual (either Life-Safety Protected or Mission Critical Facilities; both will be applicable depending on the area the work is taking place) are incorporated into the design and shall prepare a written report acknowledging compliance as required by the VAMC. The A/E must inform the COR of any physical security items that will be difficult to achieve during the concept/basis of design phase of the design and assist the VA with waiver requests as necessary.
13. TELECOMMUNICATIONS DESIGN:
In accordance with “Telecommunications and Special Telecommunications Systems Design Manual,” February
2016 (https://www.cfm.va.gov/til/dManual/dmTelecomm.pdf), paragraph 1.2 (d), Telecommunications design must be performed and stamped by a BICSI Registered Communications Distribution Designer (RCDD) for all projects.
14. DRAWING FORMAT:
All drawings shall adhere to VA project software requirements for Computer Aided Design (CAD)] available at http://www.cfm.va.gov/til/projReq.asp.
▪ Architectural/Interior Design
▪ Square Footage/Volume
▪ Room Names and Numbers
▪ Architectural Schedules
▪ Architectural Specialties and Woodwork
▪ Doors
▪ Windows
▪ Louvers
▪ Roof
▪ Floors
▪ Ceilings
▪ Vertical Circulation
▪ Walls/Curtain Wall Sizes, Shapes, & Material Data
▪ General Signage
▪ Schedules
▪ Equipment
▪ Structural
▪ Foundations
▪ Shafts and Pits
▪ Mechanical
▪ HVAC
▪ Plumbing
▪ Electrical/Telecommunications
▪ Power and Lighting
▪ Steam Distribution
▪ Other Engineering Data as Required
▪ Exterior Building Information
▪ Nurse Call System
▪ Asbestos/Hazardous Material Info
▪ Security System Information (Access Control, Security Cameras, Panic Alarms, Overhead Paging)
▪ Life Safety Information (Fire Extinguishers, Wall Ratings, Door Ratings, Fire Protection/Alarms)
▪ Departmental Ownership (By Common Name, Capital Asset Inventory Department Definition, and Strategic Capital Investment Program Department Definition) http://www.cfm.va.gov/CFM/TIL/accessibility.asp
15. SUBMITTAL FORMATS:
Submittals shall be provided in electronic and hard copy formats as listed below. Portable Document Format (.pdf), Microsoft Office Suite formats (.doc, .xls, and .ppt), Microsoft Project (.mpp), and Autodesk Revit Project (.rvt) files are acceptable. The A-E must establish a submittal exchange service or SharePoint site to provide all electronic copies of required submittals. The A-E must ensure the submittal exchange service is accessible by VA personnel and provide station personnel and PCAC with the information necessary to access the service. Submittals shall additionally be compliant with Section 508 of the Rehabilitation Act (29 U.S.C. '794 d); information on the requirements for accessible media can be found at https://section508.gov/. The A-E shall be responsible for providing:
Meeting/Conference Agendas and Minutes
Agendas and other required documents for all status update meetings will be provided to the Post-Award CO/CS and COR a minimum of 24 hours in advance of the meeting. At the initial status update meeting, the frequency of subsequent status update meetings will be established and mutually agreed to by the contractor, VA station personnel, and the Post-Award CO/CS.
Meeting minutes for all formal meetings and conferences held with the VA, including weekly construction meetings, shall be submitted within seven calendar days of the meeting or conference. All documents in any of the electronic formats listed above.
Minimum meeting minutes requirements
▪ Project name, project number, meeting host, meeting name
▪ Date, time, meeting ID, call-in number, duration, and consecutive number of total related meetings
▪ Participant list (name, title, phone number (office and mobile), email, attended meeting (yes/no))
▪ Meeting purpose, roll call, COVID-19, and additional items
▪ Agenda items (decisions, action items, and fixes or next steps)
▪ Next meeting date and time
▪ Detailed attachment list
Construction Cost Estimates
Construction cost estimates shall comply with the VA Manual for Preparation of Cost Estimates & Related
Documents for VA Facilities dated February 1, 2019, located on the TIL (http://www.cfm.va.gov/cost/index.asp).
All estimates in any of the electronic formats listed above. Cost estimates shall be submitted in 2 hard copies and in electronic form. THE A/E IS RESPONSIBLE FOR ESTABLISHING INTERNAL CONTROLS FOR KEEPING THE PRJOJECT
DESIGN WITHIN PROJECTED CONSTRUCTION FUNDING. THE A/E WILL BE REQUIRED TO REVISE DESIGN AND https://www.cfm.va.gov/til/dguide/OIT-InfrastrucStdTelecomSpaces.pdf http://www.cfm.va.gov/til/index.asp
RESUBMIT COST ESTIMATES AS NECESSARY (AT NO COST TO THE VA) SHOULD COST ESTIMATES EXCEED
CONSTRUCTION FUNDING.
Proposed Phasing and Construction Schedule: The A/E shall prepare a proposed schedule for construction that is consistent with the project construction cost estimate. During development of this schedule, due consideration will be given to standard construction practices, durations of tasks, the sequence of construction, procurement of materials, climatic conditions, etc. It is planned that areas in and adjacent to the proposed construction area shall be occupied during construction. The A/E shall develop a phasing plan that addresses this fact and assures smooth implementation of required construction.
Quality Assurance/Quality Control (QA/QC) Plan
▪ All documents in any of the electronic formats listed above.
Basis of Design (BD)
▪ All documents in any of the electronic formats listed above.
▪ Two half-size paper bond sets of drawings to VA
Schematic Design (SD)
▪ All documents in any of the electronic formats listed above.
▪ Two paper bond sets of specifications to VA
▪ Two paper bond sets of investigation reports, design calculations, space planning data, and cost estimate to VA
Design Development (DD), and Construction Documents (CD)
▪ All documents in any of the electronic formats listed above.
▪ Memo annotating what was not upgraded and corresponding justifications.
▪ One full-size paper bond set of drawings to VA
▪ Two half-size paper bond sets of drawings to VA
▪ Two paper bond sets of specifications to VA
▪ Two paper bond sets of investigation reports, design calculations, space planning data, construction schedule, construction statement of work (SOW), and cost estimate to VA
Final Bid Documents (Bid)
▪ PDF files of drawings, specifications, and any miscellaneous design analysis documents, such as submittal log and physical security compliance report
▪ Certified memo annotating what areas/times were not upgraded and the corresponding justifications
▪ Certified memo that the A-E design is independent of future projects and includes all equipment required for the project to be activated/fully functional
▪ Word files of specifications
▪ Revit and AutoCAD files of drawings
▪ One full-size paper bond set of drawings to VA
▪ Two half-size paper bond sets of drawings to VA
▪ Two paper bond sets of specifications to VA
▪ One paper bond set of investigation reports, design calculations, space planning data, construction schedule, construction SOW, and cost estimate to VA
14. OPTION ITEM REQUIREMENTS:
Solicitation Support Services
Pre-bid site visit to include meeting and project walk around. This is the meeting where contractors are invited to the job site to visually inspect the construction site to accurately develop a construction bid package.
Answer any technical questions/requests for information (RFIs) received from contractors over the duration of the solicitation, including questions asked during the site visit. Questions from contractors may come at multiple times and cover several questions over the course of the solicitation period.
Technical question responses will be provided to the Contracting Officer who will distribute the information via amendment to the solicitation.
Answers to RFIs will be required from the A-E within five calendar days of the date the questions are sent to the A-E from either the project COR or CO. An alternate response period may be submitted for review, however, unless approved by the CO and COR, the A-E is required to comply with the five-calendar-day requirement.
Throughout the solicitation period, the A-E shall provide addenda as necessary if required to revise specs and drawings.
In response to any technical questions and/or addenda issued during the solicitation period, the A-E shall provide any final revisions to the 100% FC CD as part of the construction contract. These documents shall be labeled Final Construction.
Construction Period Services (CPS)
Requests for Information (RFI)
Requests for Information shall be submitted within three calendar days of submittal to the A-E.
Submittal Reviews
Submittal reviews shall be submitted within seven calendar days of submittal to the A-E.
Site Visit Reports
Site visits as required and/or requested by the VA Project Engineer (COR) for inspection of ongoing construction including final tests and inspections; documentation of all necessary site visits to the VA
Project Engineer within five (5) calendar days of the visit.; verification of as-built conditions from contractor supplied marked up prints, and preparation of as-built documents which the VA will retain permanently. IH services associated with any asbestos abatement identified in the project.
All documents in any of the electronic formats listed above.
Modification/Change Order Requests
Modification requests shall be submitted within seven (7) calendar days of submittal to the A-E. This includes the review of the contractor’s change order/modification proposal for construction change orders, as well as the formulation of an IGCE for the modification, as requested. The A-E's reply regarding their review of cost proposals and their recommendations shall include an independent breakdown of costs in detail, quantities, and unit prices and shall cover both additions and deductions of labor, materials, and equipment. The A-E shall also supply cost estimates as requested by the COR for Requests for
Proposals for anticipated changes. All documents in any of the electronic formats listed above. Note: If major modification, VA will provide additional time and document format guidance.
Punch List
Punch list shall be submitted within seven (7) calendar days of the final acceptance inspection. All documents in any of the electronic formats listed above.
Record Drawings
Record drawings shall be delivered to the VA within 30 calendar days after VA acceptance of the construction project AutoCAD (.dwg) format.
Third-Party Commissioning
The A-E shall provide Commissioning and Commissioning Agent services and deliverables in accordance with the reference document, OCFM Whole Building Commissioning Process Manual located on the TIL
(https://www.cfm.va.gov/til/Cx-RCx/CxManual.PDF). See “Commissioning Agent Tasks” in each section of the reference document. The Commissioning Agent shall be involved in all phases of the project, including both design and construction. It is anticipated that the Commissioning Agent will participate in the following: design reviews, owner’s requirements updates, design phase commissioning planning
(facilitate), commissioning specification reviews (facilitate), construction project meetings, construction observation visits, equipment startup and testing, Testing Adjusting and Balancing (TAB) verification, and project commissioning (facilitate in coordination with General Contractor). The commissioning process shall be adapted to the size and complexity of the project. Deliverables shall be as described in the reference document. Additionally, the A-E shall develop the commissioning plan, pre-functional checklists, https://www.cfm.va.gov/til/sAlert/sAlert017.pdf systems functional performance test checklists, integrated system test checklists, and edited master specification templates to serve as a starting point for the commissioning process on all EHRM projects based on the following Systems to be Commissioned.
▪ HVAC (VA Master Specification Section 23 08 00): Direct Digital Control System, Chilled Water System, Condenser Water System, Steam/Heating Hot Water System, HVAC Air Handling System, HVAC
Ventilation/Exhaust Systems, HVAC Terminal Unit Systems, Decentralized Unitary HVAC Systems, Humidity Control Systems, Hydronic Distribution Systems
▪ Electrical (VA Master Specification Section 26 08 00): Grounding and Bonding Systems, Electric Power
Monitoring Systems, Low-Voltage Distribution System, Emergency Power Generation Systems
▪ Communications (VA Master Specification Section 27 08 00): Grounding and Bonding Systems, Structured
Cabling System
▪ Electronic Safety and Security (VA Master Specification Section 28 08 00): Grounding and Bonding, Physical Access Control Systems, Access Control Systems, Security Access Detection Systems, Video
Surveillance System
15. PROJECT SCHEDULE/PERIOD OF PERFORMANCE:
The A-E shall perform Part One Services/Design Phase work according to the schedule shown below. The A-E is also responsible for following Specification Section 01 32 16.01, Architectural and Engineering CPM Schedules, located in SOW Attachment 05. If a due date on the timeline below falls on a Holiday or Weekend, the submittal shall be due the following business day. The remaining timeline will not be shifted to accommodate Holidays or
Weekends.
QA/QC Submittal & 10% BD Submittal
7 calendar days after receipt of Notice of Award
QA/QC & 10% BD Review Meeting 28 calendar days after VA receipt of QA/QC & 10% BD Submittals
35% SD Submittal 28 calendar days after VA acceptance of QA/QC & 10% BD
Submittals
35% SD Review Meeting 21 calendar days after VA receipt of 35% SD Submittal
65% DD Submittal 42 calendar days after VA acceptance of 35% SD Submittal
65% DD Review Meeting 28 calendar days after VA receipt of 65% DD Submittal
95% CD Submittal 28 calendar days after VA acceptance of 65% DD Submittal
95% CD Review Meeting 28 calendar days after VA receipt of 95% CD Submittal
Final Bid Documents Submittal 28 calendar days after VA acceptance of 95% CD Submittal
Final Bid Documents Acceptance Meeting
21 calendar days after VA receipt of Final Bid Documents
Submittal
Total Part One Services/Design Phase Schedule
259 calendar days
The 259 calendar days listed for Total Part One Services in the project schedule may fluctuate based on when 95%
CD Submittal meets all VA guidelines and acceptance is issued. If 95% CD Submittal is not accepted due to insufficient design requirements throughout the design period and additional time is deemed necessary, it is the responsibility of the A-E firm to cover all costs associated with such delays.
Solicitation Support Services (Option Line Item) shall be performed for the length of time between the time the option is exercised and award of the construction project. Construction Period Services (Option Line Items) and
Third-Party Commissioning (Option Line Item) shall be performed for the length of time between the time the option(s) are exercised and acceptance of Construction Completion. The VA has 365 calendar days from final acceptance of the design to exercise the option(s) for Solicitation Support Services, Construction Period Services, and Third-Party Commissioning.
16. CONTRACT OVERSIGHT:
All contracts for this project shall be awarded by the Program Contracting Activity Central (PCAC); only a warranted
VA Contracting Officer shall have authority to change the terms and conditions of a contract. These changes may involve the contract award amount, contract period of performance, issuance of stop work orders, and changes to the statement of work.
PCAC shall designate a Contracting Officer’s Representative (COR) to monitor and manage the A-E’s performance under the design project contract. The COR shall be a representative of the VAMC Engineering team and have the technical knowledge required to monitor and oversee the project.
A COR from the Perry Point VAMC Engineering team shall also be designated for the construction project contract to monitor and manage the construction contractor’s performance under the construction project contract. This designation under the construction contract shall be considered equivalent to the industry standard of “Owner’s
Representative” and does not supersede or eliminate the A-E’s responsibility for Part Two Services/Construction
Period Services. The A-E ultimately shall be responsible for any errors and omissions with the design discovered during and after the construction phase.
17. OI&T INFRASTRUCTURE STANDARD FOR TELECOMMUNICATIONS SPACES:
The current version for this standard is version 3.0, dated August 21, 2020 is located on the TIL
(https://www.cfm.va.gov/til/dguide/OIT-InfrastrucStdTelecomSpaces.pdf). The design for this project at the Perry
Point VAMC in Perry Point, Maryland must meet the Campus Support Center (CSC) requirements of the
Infrastructure Standard for Telecommunications Spaces (The Standard).
The Standard serves as the master reference document of criteria for Department of Veterans Affairs (VA) facility
Information Technology (IT) support infrastructure. It defines the technical requirements necessary to maintain http://www.cfm.va.gov/til/etc/NEPAGuidance.pdf optimum reliability and efficiency within VA facilities and computing centers. IT Support Infrastructure is defined as all passive telecommunications and information technology equipment and supporting physical space and equipment.
This Standard is maintained by the Enterprise Data Center Infrastructure Collaboration Team (EDICT). Questions or concerns should be directed to Enterprise Data Center and Infrastructure Engineering (DCIE) at
VAITESEDatacenterEngineering2@va.gov.
Users must ensure their use of this technology/standard is consistent with VA policies and standards, including, but not limited to, VA Handbooks 6102 and 6500; VA Directives 6004, 6513, and 6517; and National Institute of
Standards and Technology (NIST) standards, including Federal Information Processing Standards (FIPS). Users must ensure sensitive data is properly protected in compliance with all VA regulations. Prior to use of this technology, users should check with their supervisor, Information Security Officer (ISO), Facility Chief Information
Officer (CIO), or local Office of Information and Technology (OI&T) representative to ensure that all actions are consistent with current VA policies and procedures prior to implementation.
18. EXEMPTIONS TO VA OEHRM SITE INFRASTRUCTURE REQUIREMENTS:
Any variances or exemptions to SOW Attachment 02, most recent version, must be referenced, documented, and discussed with the CO, the COR, and HEFP SEP. Following approval of variance or exemption, the A-E shall submit documentation describing variance or exemption, indicate reference in VA documentation, describe any mitigating measures, and include an attachment with documentation of discussion with the CO, the COR, and
HEFP SEP.
19. REPORTING REQUIREMENTS:
The Contractor shall be required to report to the VA Police Service (Building 102) to log in during normal working hours as well as after normal working hours. This check-in is mandatory. VA Police Service will issue a badge that will expire after 12 hours. The Contractor is now cleared to report to Engineering Project Section, Facility
Management Service, BLDG. 102 RM 127G to log in during normal working hours. This check-in is mandatory.
When the service is completed, the Contractor shall document services rendered on a legible field service report.
The Contractor shall return to the same service and building to submit the field service report to the COR for signature during normal working hours or leave the service ticket in/at the mail slot in front of BLDG. 102 RM
127G after hours.
20. SOW ATTACHMENTS:
The following documents are attached to this SOW for A-E use and incorporation into the project documents:
▪ VHA Required Division 01 Specification Sections (SOW Attachment 01)
▪ 00 VA OEHRM Site Infrastructure Requirements v2.0 (SOW Attachment 02)
▪ HEFP SEP Design Alerts 1-9 (SOW Attachment 03)
▪ Sensitive Infrastructure Data Classification Memo - FOUO (SOW Attachment 04)
▪ 01 32 16.01 EHRM Architectural and Engineering CPM Schedules (SOW Attachment 05) mailto:VAITESEDatacenterEngineering2@va.gov
▪ Program Guide, PG-18-15 Volume C - A-E Submission Instructions for Minor and NRM Construction Program dated November 2008 (SOW Attachment 06)
▪ Seasonal Influenza with Vaccines (SOW Attachment 07)
▪ VHA Directive 1061 Prevention of Healthcare Associated Legionella Disease (SOW Attachment 08)
▪ VAMC Campus Map (SOW Attachment 09)
▪ Site Self-Assessment X-Matrix (SOW Attachment 10)
▪ VHA Supplemental Contract Requirements for Combatting COVID-19 (Amended December 14, 2021) (SOW
Attachment 11)
▪ Site-Specific SOW Attachments
▪ Underground Utilities Drawing B32 (SOW Attachment 12)
▪ Historical Resource Management Plan (HRMP) - VAMC City, State (SOW Attachment 13)
▪ VISN Facility Condition Assessment (FCA) (SOW Attachment 14)
End of SOW
File details come from the government source that posted it. Updated .