This pre-solicitation notice requests Standard Form 330 submissions from architecture and engineering firms for design services. The Veterans Health Administration seeks to award a firm-fixed price contract to upgrade infrastructure at the Perry Point VA Medical Center in Maryland to support a new electronic health record system. Design services include site investigations, drawings, specifications, cost estimates and construction period support. The period of performance for design is 144 calendar days, with construction period services as optional line items. Submissions are due April 18, 2023. A two-phase evaluation process will shortlist three firms for written responses. The highest rated response will be selected for negotiations. This is a 100% set-aside for verified Service-Disabled Veteran-Owned Small Businesses.

View the file

Other files

File Type Posted
PPQ - EHRM DCVAMC.docx DOCX document
SOW Attachment 02 - VA OEHRM Site Infrastructure Requirements 2-0.pdf PDF
SOW.pdf PDF
36C77622R0053_1.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VHA Required Division 01 – General Requirement Specification Sections

* Note that these have been identified as required Division 01 specifications for this EHRM project. It is the responsibility of the A-E to determine if there are other specifications to include.

01 00 00 – General Requirements

01 32 16.01 - Architectural and Engineering CPM Schedules

01 32 16.15 – Project Schedules (Small Projects – Design/Bid/Build)

01 33 23 - Shop Drawings, Product Data, and Samples

01 35 26 – Safety Requirements

01 42 19 – Reference Standards

01 45 00 - Quality Control

01 45 29 – Testing Laboratory Services

01 57 19 - Temporary Environmental Controls

01 74 19 – Construction Waste Management

01 81 13 – Sustainable Construction Requirements

01 91 00 - General Commissioning Requirements