USS BATAAN LHD-5

STATEMENT OF WORK

USS Bataan is overhauling the CO, Flag, and Wardroom galley as part of a phased replacement plan. The ship is requesting replacement of reefer/freezer combination in the Flag Galley, a replacement of a reefer/freezer combination in the CO galley, and replacement of a reefer and a galley serving line in the Wardroom galley. USS Bataan will assist in Ladder removal during rigging. POP: June 27, 2022 – July 22, 2022

FLAG Galley – Replace existing refrigeration unit

- Remove existing MGR EC20-1358, Recover any remaining refrigerant from the system

- Provide and install new 1 ea. R10F10-2M-SN-MLR (32"W x 30"0 without doors 72"H)

CO Galley – Replace existing refrigeration unit

- Remove existing EC15-1358 S# 558 Recover any remaining refrigerant from the system

- Provide and install new 1 ea. R10F10-2M-SNM-MLR (38"W x 25"0 without doors 72"H)

- Secure and calibrate unit

WDRM Galley Annex – Replace existing refrigeration unit

- Remove existing MGR ER41-1368M S# 2590, Recover any remaining refrigerant from the system

- Provide and install new 1 ea. R412M-SN-MLR (61"W x 30"0 x 72-3/4"H)

- Secure and calibrate unit

WDRM Galley – Replace serving line

- Save all serving line window flashing for reinstall

- Remove existing CFC4T-2M-SNM-MLR S# 4854-08 and sneeze shield display

- Provide and install new 1 ea. CFC4T-2M-SNM-MLR with 2-tier display

- Secure and calibrate unit