This is a Statement of Work (SOW) for the maintenance and support of analytical laboratory equipment at the National Institute of Standards and Technology (NIST), Department of Commerce. The contractor shall provide preventive maintenance, corrective maintenance, and technical support for three (3) Liquid Scintillation Spectrometers (LSC) and one (1) Wizard2-24800010 gamma well counter. Maintenance services must include routine inspections, calibration, parts replacement, and emergency repair services to ensure equipment operability and compliance with manufacturer specifications. The contractor is responsible for maintaining detailed maintenance records, providing spare parts availability, and ensuring minimal equipment downtime. Technical support includes troubleshooting assistance and training for NIST personnel as needed.
The SOW requires the contractor to establish a service schedule that accommodates NIST operational needs, typically involving quarterly preventive maintenance visits or as mutually agreed upon. The contractor must respond to emergency service calls within defined timeframes and maintain inventory of commonly needed replacement parts. Performance metrics include equipment uptime targets and documented compliance with all maintenance protocols. The contractor shall coordinate directly with NIST's designated point of contact and provide monthly status reports detailing all maintenance activities, equipment performance, and any recommended upgrades or modifications. All work must be performed by qualified technicians with manufacturer certification or equivalent expertise in radiometric and gamma counting instrumentation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation_1333ND26QNB680284.docx | DOCX document | |
| Attachment 2- Applicable Provisions and Clauses.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work Maintenance Services for Three (3) Liquid Scintillation Spectrometers (LSC) and a Wizard2-24800010 gamma well counter
I. BACKGROUND:
The NIST Radioactivity Group mission is to develop, maintain, and disseminate radioactivity standards, develop and apply radioactivity measurement techniques, and engage in research to meet the requirements for new standards. The Radioactivity Group performs radioactivity measurements of Standard and Certified Reference Materials (SRMs, CRMs), testing reference materials and environmental samples. The Group carries out a wide range of programs in low-level standards for environmental and bio-assay measurements, standards used in nuclear medicine and nuclear power plants, and testing of radiological instrumentation. Good maintenance of instruments is crucial to achieve the mission. A maintenance service agreement for the instruments is the best way to maximize return on investment and avoid the high costs associated with instrument failure.
II. SCOPE OF WORK
The Contractor shall provide a service agreement for the service and maintenance for the instruments mentioned above. This effort shall include uninterrupted performance within manufacturers’ specifications on a scheduled and as-needed basis. The Contractor shall guarantee the full system performance of these instruments. The proposed acquisition is for a maintenance/service contract on existing four Instruments: Three (3) Liquid Scintillation Spectrometers (LSC) and a Wizard2-24800010 gamma well counter. Below is a table of the instruments requiring services:
| Instrument Name |
| Serial Number |
| Model |
| NIST Property Tag |
| Ultra-Low-Level Liquid Scintillation Spectrometer, Quantulus-1220 |
| DG10106943 |
| 1220 |
| 640959 |
| Liquid Scintillation Spectrometer, TriCarb-4910 TR |
| SGLO1810765 |
| 4910 TR |
| 947093 |
| Beckman 6500 |
| 2180109 |
| 6500 |
| 620297 |
| Gamma well detector Wizard2-24800010 |
| DG10118408 |
| WIZARD24800010 |
| 644762 |
Services and maintenance shall include unlimited emergency visits during regular business hours in addition to one scheduled preventive maintenance visit per period. Covered expenses shall include all parts, labor, travel, and per diem. The Contractor shall repair/replace all parts required for the operation of the Instruments.
III. SPECIFIC TASKS
The Contractor shall perform services for the instruments listed in the table above.
1. Service Conditions and Repairs:
1.1. All services provided under this agreement must be provided by personnel authorized by PerkinElmer and fully competent in the operation of the covered instruments.
1.2. The Contractor shall only employ tools, parts, instruments, test apparatus, methodologies, techniques, and practices appropriate to use for the instruments by the manufacturer. The service protocols and instruments specifications shall always be adhered to.
1.3. The standard manufacturer’s warranty for parts and labor shall apply to all work performed.
1.4. The Contractor shall respond to an unlimited number of requests for service calls in the event of any instrument failure which requires immediate repair.
1.5. The Contractor shall respond to service calls Monday through Friday, during regular business hours only. The Contractor shall provide a service technician/engineer on-site at NIST Gaithersburg, MD, within 48 hours after the service call is placed by the Government. No weekend service visits shall be required.
1.6. In the event that the Contractor is unable to resolve the problem during the service call, the Contractor shall provide telephone support and on-site support as needed to expedite a solution for NIST.
1.7. The Contractor is responsible to obtain all parts required for all repairs and maintenance. The Contractor shall make a commercially reasonable effort to secure parts within 72 hours after identifying the need for a replacement part for the covered equipment.
1.8. Replacement parts provided under this agreement may be either new or remanufactured and the Contractor may exchange and/or repair existing components.
1.9. All repairs must result in the instruments meeting manufacturer’s specifications as specified in the most recent version of the operation and maintenance manuals for the instruments.
1.10. Any parts or components removed for replacement shall become the property of the Contractor unless otherwise agreed to by the parties, and the cost of all the parts are covered by the contract. The Contractor shall remove the parts from the NIST campus at the time of the service call. This statement of work assumes that the Contractor will take the component(s) with them at the time of the service call, and that no shipping charges will be incurred under this contract. The Contractor shall assume liability for all parts removed from the NIST campus
2. Preventive Maintenance:
2.1. Provide one preventive maintenance visit per year of the service agreement as specified in the manufacturer’s operations and maintenance manuals for the instruments. The contract will include the option for yearly extension over the basic year. The Contractor shall utilize the most recent operation and maintenance manuals available for each instrument.
2.2. Scheduling of the visits shall be consistent with the maintenance requirements of the instruments as detailed in the most recent operation and maintenance manuals for each piece of equipment.
2.3. Preventive maintenance visits shall occur during NIST’s regular business hours as specified in this SOW. The NIST Technical Point of Contact (TPOC) shall contact the Contractor to schedule a mutually acceptable date and time for the preventive maintenance visit. The scheduled maintenance visit may be made at the same time as an unscheduled visit for corrective or other action if such a visit occurs within one month before a scheduled preventive maintenance visit. All visits must be scheduled, in advance with the NIST TPOC.
2.4. Contractor shall remove the parts from the NIST campus at the time of the service call. This statement of work assumes that the Contractor will take the component(s) with them at the time of the service call, and that no shipping charges will be incurred under this contract. The Contractor shall assume liability for all parts removed from the NIST campus.
3. Telephone Support
3.1 Provide telephone support for the equipment during regular business hours. Telephone support must include responses to questions about operating practices, application use, and service issues that can be diagnosed and resolved over the telephone.
4. Compliance with NIST Rules and Regulations
4.1. While on the NIST campus, the Contractor’s representative(s) shall abide by all NIST rules and regulations pertaining to visitors.
4.2. The Contractor shall provide all information necessary for the TPOC to authorize entrance to the NIST campus in accordance with NIST Security Policy and Procedures. In the case of preventive maintenance visits, the Contractor shall provide at least thirty (30) days’ notice to the TPOC.
IV. ACCEPTANCE/INSPECTION BY THE GOVERNMENT
The Government reserves the right to conduct quality assurance testing to confirm that a given instrument meets the manufacturer’s performance specifications. All Government testing will be completed within five (5) working days of the completion date of a maintenance or repair visit.
V. OPTIONS
The Contractor shall perform the work described in section III of this SOW for:
Base Period: 12 months after receipt of the purchase order (ARO) OPTION 1: 12 months after the end of the base period.
OPTION 2: 12 months after the end of OPTION 1.
OPTION 3: 12 months after the end of OPTION 2.
OPTION 4: 12 months after the end of OPTION 3.
VI. DELIVERABLES AND DELIVERABLE DUE DATES
The Contractor shall submit a field service ticket prior to departure from NIST on any given service call for maintenance or repairs. The service ticket shall include the following:
1. Model number.
2. Serial number.
3. Date and time of arrival to NIST.
4. Description of service performed.
5. Name and quantity of any parts that were repaired.
6. Name and quantity of any parts that were replaced.
7. Date and time of departure from NIST.
8. Diagnostic test results or narrative summary demonstrating that the instrument is meeting the performance standards.
9. Any additional comments or recommendations.
10. Printed name and signature of PerkinElmer service person
11. Signature block for NIST personnel accepting the services rendered.
VII. PERIOD OF PERFORMANCE AND PLACE OF PERFORMANCE
The period of performance shall be for a year base period of 12 months and four 12 month option years for a total period of performance of 5 years ARO.
Performance shall be at NIST, 100 Bureau Drive, Building 245, Gaithersburg, MD
VIII. GOVERNMENT-FURNISHED PROPERTY, DATA AND/OR INFORMATION
The Government will provide visitors’ access and an escort to the NIST facilities during the performance of this contract.
IX. CONTRACTOR’S MINIMUM QUALIFICATIONS
The Contractor shall provide engineers or technicians that are fluent in the operation of the covered equipment throughout the period of performance of this requirement.
X. SECURITY
NIST is a restricted campus. An identification badge is required for access to entry into buildings and is shown to the armed Security Police when entering the campus. Contractor personnel must wear the identification badge issued by NIST Security while working at any NIST campus.
XI. REGULAR BUSINESS HOURS
Regular business hours are Monday through Friday, 8:00 am to 5:00 pm local time.
XII. VEHICLE REGISTRATION
All Contractor employees must register their vehicles with the NIST Security Office to gain access to the campus. A valid driver’s license, Government-furnished civilian ID, proof of insurance and current registration must be presented to the NIST Security Office, at which time a NIST vehicle pass will be issued. The pass shall be displayed on the vehicle in accordance with NIST Security Office instructions.
File details come from the government source that posted it. Updated .