SOW.docx
DOCX document 16 KB Posted
- Attached to
- PM on Reverse Osmosis Unit/IEE Set Aside Federal contract opportunity
- Solicitation number
- 75H70525Q00009
About this file
This Statement of Work (SOW) outlines requirements for preventative maintenance services for Reverse Osmosis (RO) equipment at the Red Lake Hospital's Sterile Processing Department in Red Lake, MN. The contract period is for five years (base plus 4 option years).
The contractor (identified as Lindsey Crystal Pure Water) must service two specific RO units: Nustream Filtration model LB30 (serial #1353) and model CGD14 (serial #1352). Required maintenance includes quarterly loop/storage tank disinfection, sediment pre-filter service, and DI tank exchange; bi-yearly endotoxin filter maintenance; and annual UV bulb and vent filter replacement. The work must be performed during business hours (Monday-Friday, 7am-5pm), with findings reported to BioMed personnel after each visit. The associated pre-solicitation notice indicates this opportunity may be set aside for Indian Economic Enterprises under the Buy Indian Act, with NAICS code 811210 and PSC J065, and interested parties must submit capabilities statements to christopher.millard@ihs.gov.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| IHS IEE Representation Form.pdf | ||
| IEE Sources Sought INFO.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCOPE OF WORK
Service Contract for SPD RO Unit PM
I. Purpose of Contract:
The purpose of this contract is to obtain a service contract for the Sterile Processing Department (SPD) RO (Reverse Osmosis) Unit PMs.
II. Objective:
The contractor will provide routine maintenance service for the RO Unit located in the SPD.
Period of the contract will be for five years (Base + 4 years).
III. Government Furnished Property, Facilities, and Services
The Red Lake Hospital will provide access to the Sterile Processing Department (Working hours Monday - Friday 7am-5pm).
IV. Contractor Furnished Equipment, Facilities, and Services
The Contractor shall provide service to the Red Lake Hospital located at 24760 Hospital Drive Red Lake, MN 56671. The contractor is responsible for servicing the RO Unit located in the SPD.
V. Statement of Work:
The contractor (Lindsey Crystal Pure Water) will provide preventative maintenance and repair services for RO equipment located in the Sterile Processing Department at the Red Lake Hospital. The equipment shall be routinely serviced (per manufacturers recommendations). Nustream Filtration model LB30 serial number 1353, Nustream Filtration model CGD14, serial number 1352.
VI. Technical Requirements:
Sterile Processing Department: Reverse Osmosis Equipment
1. Loop, Storage Tank and RO Disinfect (Quarterly)
2. Slimline Sediment Pre-Filter (Quarterly)
3. DI Tank Exchange (Quarterly)
4. 2.5X20 Endotoxin Filter (Bi-Yearly)
5. UV Bulb Exchange (Yearly)
6. 0.5 Micron Vent Filter (Yearly) Vendor – will provide service including parts, labor and travel to perform:
1. Scheduled preventative maintenance in accordance manufacturers recommended schedule
V. Additional Requirements:
Vendor shall inform BioMed personnel of findings before leaving the Service Unit (each visit):
File details come from the government source that posted it. Updated .