About this file
The document is a Scope of Work (SOW) from the Illinois Department of Natural Resources (IDNR) for the purchase and installation of a hydraulic thumb attachment for a Volvo EC220DL excavator. The IDNR requires the hydraulic thumb to expand the capabilities of their Heavy Equipment Crew (HEC) who maintain equipment used statewide for various construction and maintenance projects. The SOW provides detailed specifications for the hydraulic thumb, including required features, dimensions, and operating pressures. Installation shall be completed within 90 days at the HEC headquarters in Pawnee, Illinois, or the excavator can be delivered to an off-site location within 60 miles. Contractor must provide an operations and maintenance manual, product literature, and a 12-month manufacturer's warranty. The contract is subject to the Illinois Small Business Set-Aside Program, and the contractor must provide required insurance coverage. Payment terms are subject to the Illinois Prompt Payment Act, and a $15 fee is required for the Minority Contractor Opportunity Initiative. The contract award is not guaranteed, and all questions must be directed to the designated Information Contact/Purchaser.
The SOW does not specify a budget or funding source. Pricing is to be submitted through the BIDBUY system, with a paper bid option if necessary. The procurement is set aside for small businesses registered in the Illinois Procurement Gateway program. No information is provided about any incumbent contractor or the current procurement environment.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ILLINOIS DEPARTMENT OF NATURAL RESOURCES
SCOPE OF WORK & PROJECT REQUIREMENTS
Date: February 18, 2019 File# 0-19-004
| LOCATION: | Perschbacher Service Center | |
| 505 10th Street | ||
| Pawnee, IL 62558 |
PROJECT TITLE: Purchase Hydraulic Thumb for Excavator
PROJECT NARRATIVE:
The Illinois Department of Natural Resources (IDNR) maintains a work unit in Pawnee, Illinois known as the Heavy Equipment Crew or HEC. The HEC consists of one site supervisor who handles all scheduling, purchasing, and personnel operations, and five (5) power shovel operators who operate the equipment and do most of the work. In addition, the HEC has an Engineering Technician in Springfield who evaluates work requests from the field staff, performs calculations to determine quantities for materials and supplies, and coordinates all construction projects performed by the operators.
The HEC maintains a wide variety of equipment in Pawnee ranging from large pieces of equipment such as bull dozers, excavators, graders, and dredges, down to smaller equipment such as pumps, blades, augers, and box scrapers. This equipment is used state-wide to construct waterfowl levees, dams, install culverts, clean-out ditches, construct horse trails, repair roadways, and remove invasive vegetation. From time to time, new equipment is needed to replace old or damaged equipment, or to expand the capabilities of the HEC.
SCOPE OF WORK:
The HEC needs a Hydraulic Thumb which is an attachment on the end of an excavator. The hydraulic thumb will allow the excavator operator to grab onto tree trunks, boulders, poles, or structures which need to be relocated. The hydraulic thumb will be very valuable during demolition projects and clearing projects. It will also be helpful to move smaller equipment such as tanks, pumps and generators around the yard at Pawnee or at a job site.
ATTACHMENTS:
See attached photographs which demonstrate a typical hydraulic thumb required for this procurement.
PROJECT SPECIFICATIONS & REQUIREMENTS:
A. Provide and install a Main Pin hydraulic thumb on a Volvo EC220DL excavator with a 42-inch bucket. Base Bid Price shall include whip hoses, installation labor, delivery and all components to provide a fully functional system. Hydraulic lines, control valves and JRB power latch quick coupler are provided on the machine.
SPECIFICATIONS
T-1 Steel 140 Degree Rotation Reinforced Side Plates Reinforced Fingers Serrated Thumb Fingers Greaseable Bushing on Main Pin 3000 psi Minimum operating pressure 2500 psi Minimum System Relief Pressure 5000 psi Max Seal Operating Pressure Cylinder Diameter: 4.00” Bore: 2.50” Stroke: 35” Pin Diameter: 1.9995” – 2.0000”
a. Installation shall be at the Heavy Equipment Crew Headquarters, located at:
Perschbacher Service Center 505 10th Street Pawnee, IL 62558, or
b. The IDNR HEC will deliver the Volvo excavator to an off-site location within 60 miles of Pawnee, IL so that the installation can be completed.
B. Operation and Maintenance Manual. Contractor shall submit a comprehensive and detailed O&M manual. One hard copy and one electronic copy shall be required.
C. Bid should include product literature.
D. Warranty Period: Manufacturer shall warrant all manufactured products and installed systems for 12 months.
E. Installation shall be completed within 90 days of the awarded bid date.
F. All work activities and entry to the site must be coordinated with the site superintendent. Vendor shall contact Mr. Rick Merritt at 217.625.2908 to schedule an appointment.
1) Small Business Set-Aside The Contractor awarded the project must be registered as a small business, as required by the Small Business Set-Aside Program. (For complete requirements, to become registered, or to certify your business is in the Small Business Set-Aside Program, visit the Illinois Procurement Gateway (IPG) at https://ipg.vendorreg.com/ or call (217) 782-1270.
| 2) | Insurance |
| Contractor shall, at all times during the term of this contract and any renewals or extensions, maintain and provide a Certificate of Insurance naming the State as an additionally insured for all required bonds and insurance. Certificates may not be modified or canceled until at least thirty (30) days’ notice has been provided to the State. Contractor shall provide: (a) General Commercial Liability insurance in the amount of $1,000,000 per occurrence (Combined Single Limit Bodily Injury and Property Damage) and $2,000,000 Annual Aggregate; (b) Auto Liability, including Hired Auto and Non-owned Auto (Combined Single Limit Bodily Injury and Property Damage), in amount of $1,000,000 per occurrence; and (c) Worker’s Compensation Insurance in the amount required by law. Insurance shall not limit Contractor’s obligation to indemnify, defend, or settle any claims. |
3) New Products Unless otherwise specifically provided in the contract documents, all materials, equipment and products incorporated in the work under the contract shall be new and of a suitable grade for the purpose intended.
| 4) | Steel Products |
| Any steel product(s) used or supplied in the performance of this contract shall be manufactured or produced in the United States, in accordance with the Steel Products Procurement Act, unless a waiver is granted by IDNR (30 ILCS 565/). |
5) Specified Materials Quotes shall be based on providing all products exactly as required by the project specifications. Contractor may select from the list of acceptable manufacturers, or, for products specified only by reference or performance standards, select any product which meets or exceeds the specified standards, by any manufacturer, subject to the approval of DNR.
6) Final Cleaning Contractor shall clean-up all work related debris and construction materials and properly dispose off-site. The Contractor shall repair and otherwise make good any damage caused by the work and leave the premises in the equivalent of the original condition. If any landscaping repairs or seeding is required, it will be at no additional cost to the state.
7) Warranty The Contractor warrants that all work provided under the contract will be in conformance with the contract and free from defects in workmanship, materials, and equipment for a period of one year from the goods acceptance date.
8) Payment Payments, including late payment charges, will be paid in accord with the State Prompt Payment Act and rules when applicable, 30 ILCS 540/; 74 III. Adm. Code 900. This shall be the Contractor’s sole remedy for late payments by the State. Payment terms contained in Contractor’s invoice(s) shall have no force or effect.
9) Minority Contractor Opportunity Initiative The State requires a fee of $15 to cover Expenses related to the administration of the Minority Contractor Opportunity Initiative. Any Vendor awarded a contract under Section 20-10, 20-15, 20-25 or 20-30 of the Illinois Procurement Code (30 ILCS 500) of $1000 or more is required to pay a fee of $15. The Comptroller shall deduct the fee from the first check issued to the Vendor under the contract and deposit the fee in the Comptroller’s Administrative Fund.
| 10) | Request for Quote |
| Bids should be entered in BIDBUY. If necessary, a paper bid may be submitted to the Information Contact listed on the BidBuy solicitation. |
| 11) | Submittal Date and Time: |
| Refer to BidBuy for Date and Time. |
| 12) | Term of Contract |
| All work shall be completed within 90 days from the last dated signature on the fully executed | |
| Contract or from the Notice to Proceed, unless agreed to by both the Contractor and | |
| DNR, that a time extension is warranted. |
| 13) | Award |
| The Department of Natural Resources is not obligated to award a contract pursuant to this Request. |
14) Questions
ALL QUESTIONS PERTAINING TO THIS PROCUREMENT OR THE BIDBUY PROCEDURES, MUST
BE DIRECTED TO THE INFORMATION CONTACT/PURCHASER LISTED IN THE BIDBUY SOLICITATION.
| 15) | Contact Information | |||
| Billing: | ||||
| Kim Gibson | ||||
| Illinois Department of Natural Resources |
One Natural Resources Way Springfield, IL 62702
| Phone: | 217 / 785 - 4827 | ||
| Fax: | 217 / 782 - 9599 | ||
| E-mail: | kimberly.gibson@Illinois.gov |
image2.jpeg image1.jpeg
File details come from the government source that posted it. Updated .