SOW Demo Bldg 656 657 2701 Demo FINAL.pdf
PDF 5 MB Posted
- Solicitation number
- 5205056FE01
About this file
This is a Performance Work Statement (PWS) for building demolition services at Joint Base Langley-Eustis (JBLE), Fort Eustis, Virginia, effective April 14, 2026.
The contractor shall demolish three semi-permanent buildings (656, 657, and 2701) totaling approximately 15,824 square feet. Building 656 (7,438 sq ft) was constructed in 1949; Building 657 (6,451 sq ft) was constructed in 1949; and Building 2701 (1,935 sq ft) was constructed in 1956. The scope includes removal and disposal of all building structures, contents, foundations, footings, and associated systems including piping, electrical systems, chimneys, and bollards. The contractor must perform asbestos and lead-based paint abatement as required—Buildings 656 and 657 require abatement due to current conditions, while Building 2701 requires approximately 30 percent (580 sq ft) abatement based on 1992 testing. All hazardous materials (smoke alarms, fluorescent lights, batteries, thermostats) must be removed to Building 1208 (Hazardous Waste Accumulation Facility) for disposal. The contractor is responsible for refrigerant evacuation, dust control, debris management, utility coordination, environmental compliance including recycling of steel, copper, aluminum, glass, and lumber, site restoration with grading and hydro-seeding, and all asphalt and concrete paving repairs. Work shall comply with JBLE Environmental Management Plan 4.4.6.16, OSHA regulations, Virginia stormwater management requirements, and the Virginia Runoff Reduction Method (VRRM). Operations occur Monday through Friday, 0700-1600 EST, excluding federal holidays, with work hours outside normal times requiring advance coordination. The contractor must submit numerous deliverables including Quality Control Plan, Storm Water Management Plan, Erosion and Sediment Control Plan, Asbestos Abatement Plan, Demolition Plan, Waste Management Plan, Hot Work Permit, Safety Plan, soil and topsoil sampling plans, permits, and site plans according to specified schedules. Government will provide as-built drawings, utilities drawings, and topography maps (subject to verification by contractor) but will disconnect utilities prior to demolition through privatized utility providers (Dominion Energy Virginia for electrical; American States Utility Services for water/sewer; Virginia Natural Gas for natural gas). The contractor shall obtain and maintain all required state and local permits, base access passes (DBIDS), and identification badges for personnel. Performance evaluation includes daily inspections by contractor, periodic inspections by Quality Assurance personnel, and acceptance upon final inspection completion. The Services Summary establishes performance thresholds for environmental compliance, building demolition, utility disruption notification, site restoration (including two grass cuttings), plan/report submissions, and progress reporting via AF Forms 3064 and 3065. No government-furnished property or equipment is provided; the contractor furnishes all management, transportation, tools, supplies, equipment, labor, and supervision required.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Site Visit Sign in Sheet.pdf | ||
| SAM.gov Wage Determination.pdf | ||
| QA DEMO 656 657 2701 2026.pdf | ||
| Combo Synopsis Solicitation - 656 657 2701 PDF 2026.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CUI
PERFORMANCE WORK
STATEMENT FOR BUILDING 656, 657, & 2701 DEMOLITION SERVICES
733rd Civil Engineering Squadron
Joint Base Langley Eustis, VA 23604
April 14, 2026
TABLE OF CONTENTS
1.0 SCOPE OF WORK 3
2.0 DESCRIPTION OF SERVICES 4
• DEMO BUILDING 656 4
• DEMO BUILDING 657 8
• DEMO BUILDING 2701 14
3.0. GENERAL INFORMATION 28
4.0. SERVICES SUMMARY 36
5.0. GOVERNMENT AND CONTRACTOR FURNISHED
PROPERTY, SUPPLIES AND SERVICES 39
APPENDIX A – ACRONYMS 40
APPENDIX B – APPLICABLE PUBLICATIONS AND 43
FORMS
1.0 SCOPE OF WORK. The contractor shall provide all management, transportation, tools, supplies, equipment, labor, testing and supervision to perform field investigations, vehicles and equipment necessary to perform services on Joint Base Langley-Eustis (JBLE), Virginia (VA) in a manner that shall ensure continuous and reliable service. The contractor shall demolish buildings 656, 657 and 2701 on Fort Eustis, Virginia. All work shall be performed in accordance with attached drawings, specifications, and all applicable laws, regulations, standards and commercial practices as described in the performance work statement with the focus on safety and customer service. Additional work that is not listed, but may be required, to accomplish the desired results is inclusive in this project scope.
1.1 Government will provide the following items if available as courtesy which may have errors or omissions. The contractor is responsible for verifying plans, testing, and dimensions as needed. All final costs should be included in the price proposal.
• As-built Record drawings
• Utilities drawings
• Topography Map Survey 2020 ground elevation
• Most recently tested for asbestos containing materials (ACM) and lead based paint (LBP).
1.2 Government reserves the right to remove mechanical equipment and furniture prior to demolition.
1.3 All Aspect of this contract must fully comply with:
• JBLE Environmental Management Plan (EMP) 4.4.6.16.
• Ft. Eustis Map: Bldgs. 656, 657, and 2701.
2.0 DESCRIPTION OF SERVICES.
The contractor shall demolish building 656, 657 & 2701. This scope of work shall include specified requirements, drawings and technical requirements set forth below. All work shall be accomplished in accordance with the specifications, site map, Contract Progress Schedule (AF 3064) and Contract Progress Report (AF 3065) and terms and conditions of the contract.
BLDG 2701
MAIN GATE
BLDG 656 &657
CUI
2.1 DEMOLISH BUILDINGS - 656 (Asset Size: 7,438 S.F)
2.1.1 Building 656 is a semi-permanent building that exceeded its service life and is inefficient to maintain. The project requires removal of building 656 and all associated systems to include not limited to: any above ground piping and any storage sheds.
Sidewalks, trees, gazebos, signs, and concrete sections to be removed will be identified during the pre-bid site visit.
2.1.2 Install a temporary chain link fence and around the entire area of work site. Fence footprint shall encompass entire facility.
2.1.3 The contractor is responsible for the removal and disposal of the building structure as well as all contents including, but not limited to all furnishings, trash, fixtures, appliances, electrical systems, chimneys, complete foundations, footers, bollards, and building structure.
Demo pipe/pipe supports .
Demo s idewalk & Driveway
DO NO T d emo sidewalk
Demo Bldg 6 56
CUI
2.1.4 IAW JBLE’s hazardous waste disposal policy, contractor is responsible for removal of all smoke alarms, fluorescent lights, batteries, thermostats and any other hazardous materials.
Any hazardous materials shall be taken to building 1208 (Hazardous Waste Accumulation Facility) for disposal prior to demolition.
2.1.5 Bldg. 656 was constructed in 1949. The Government has not tested for asbestos containing materials (ACM) and lead based paint (LBP); however, upon entering the building environmental toxins were present. Due to the current conditions of the building, abatement is required. If any additional testing is required, the cost should be included in the contractor’s proposal. A full destructive sample is permitted at the pre-bid site visit.
2.1.6 Contractor is responsible for evacuating and recycling refrigerants from all mechanical equipment prior to demolition.
2.1.7 Dust resulting from demolition shall always be controlled.
2.1.8 The contractor shall not allow demolition debris to accumulate at the work site.
2.1.9 The utilities to Building 656 (Gas, Electric, Water, Sewer, Fiber optics etc.) will be disconnected and removed (by others) prior to demolition. Contractor shall attend all coordination meetings with the Utility Service Providers.
2.1.10 In accordance with sound environmental principles and EMP 4.4.6.16, the contractor shall salvage or recycle as much steel, copper, aluminum, glass and lumber as possible.
Weight tickets for all recycled material and material going to the landfill must be turned in to the CES PM within 14 days of recycling.
2.1.11 Remove and dispose of all foundations, footings complete, and concrete sections identified during the pre-bid site visit.
2.1.12 Repair ALL asphalt and concrete paving damaged by contractor operations. Backfill area of excavation as necessary to establish elevation matching that of surrounding area.
Conduct soil compression test prior to placing asphalt or concrete paving.
2.1.13 See Government provided the topography map survey 2020 ground elevations around Bldg.656.
2.1.14 After demolition, Contractor shall thoroughly clean all sites of debris and grade all disturbed soil to implement positive drainage.
2.1.15 Photo(s): Building 656.
Do NOT demolish CMU wall that separates both buildings .
Demo ALL pipe that runs through 656.
Cap off at 655.
Utilities Drawing:
Floor Plan Drawing Bldg. 656 (7,438 Sq. Ft)
B. 65 6
CUI
2.2 DEMOLISH BUILDINGS - 657 (Asset Size: 6,451 S.F)
2.2.1 Building 657 is a semi-permanent building that exceeded its service life and is inefficient to maintain. The project requires removal of building 657 and all associated systems to include not limited to: any above ground piping and any storage sheds. Sidewalks, trees, and concrete sections to be removed will be identified during the pre-bid site visit.
2.2.2 Install a temporary chain link fence, construction fence and silt fence system around the entire area of work site. Fence footprint shall encompass entire facility.
2.2.3 The contractor is responsible for the removal and disposal of the building structure as well as all its contents including, but not limited to all furnishings, trash, Demo Bldg. 657
Demo ALL entrance sidewalks & Driveways
Demo pipe/pipe supports .
Demo asphalt/concrete to existing grass line.
CUI
fixtures, appliances, electrical systems, chimneys, complete foundations, footers, bollards, and building structure.
2.2.4 IAW JBLE’s hazardous waste disposal policy, contractor is responsible for removal of all smoke alarms, fluorescent lights, batteries, thermostats and any other hazardous materials. Any hazardous materials shall be taken to building 1208 (Hazardous Waste Accumulation Facility) for disposal prior to demolition.
2.2.5 Bldg. 657 was constructed in 1949. The Government has not tested for asbestos containing materials (ACM) and lead based paint (LBP); however, upon entering the building environmental toxins were present. Due to the current conditions of the building, abatement is required. If any additional testing is required, the cost should be included in the contractor’s proposal. A full destructive sample is permitted at the pre-bid site visit.
2.2.6 Contractor is responsible for evacuating and recycling refrigerants from all mechanical equipment prior to demolition.
2.2.7 Dust resulting from demolition shall be always controlled.
2.2.8 The contractor shall not allow demolition debris to accumulate at the work site.
2.2.9 The utilities to Building 657 (Gas, Electric, Water, Sewer, Fiber Optics etc.) will be disconnected and removed (by others) prior to each demolition. Contractor shall attend all coordination meetings with the Utility Service Providers.
2.2.10 In accordance with sound environmental principles and EMP 4.4.6.16, the contractor shall salvage or recycle as much steel, copper, aluminum, glass and lumber as possible. Weight tickets for all recycled material and material going to the landfill must be turned in to the CES PM within 14 days of recycling.
2.2.11 Remove and dispose of all foundations, footings and concrete sections.
2.2.12 Grade site such that all areas drain to exist drainage without ponding, substantial depressions, or unusual mounds of dirt. Remove dirt clods and rocks over ½” and hydro-seed all the way to five (5) feet past the silt fence, or as determined at the Prebid Site Visit (PBSV).
2.2.13 Repair ALL asphalt, sidewalks and concrete paving damaged by contractor operations. Backfill area of excavation as necessary to establish elevation matching that of surrounding area. Soil Compression Test prior to placing asphalt or concrete paving.
CUI
2.2.14 See Government provided the topography map survey 2020 ground elevations around Bldg. 657.
2.2.15 After demolition, Contractor shall thoroughly clean all sites of debris and grade all disturbed soil to implement positive drainage and hydro-seed the area with fescue grass. Contractor shall haul, spread and grade soil to ensure 4” of suitable top layer exists prior to seeding. Contractor shall water as necessary until grass is established.
Photo(s): Building 657
Demo ALL pipe that runs through 656.
Cap off at 655.
Floor Plan Drawing Bldg. 657 (6,451 SF.)
First Floor Plan
2.3 DEMOLISH BUILDINGS - 2701 (Asset Size: 1,935 S.F)
2.3.1 Building 2701 is a semi-permanent building that exceeded its service life and is inefficient to maintain. The project requires removal of building 2701 and all associated systems to include not limited to: any above ground piping and any storage sheds. Sidewalks, trees, and concrete sections to be removed will be identified during the pre-bid site visit.
B. 65 7
2.3.2 Install a temporary construction fence and silt fence system around the entire area of work site. Fence footprint shall encompass entire facility.
2.3.3 The contractor is responsible for the removal and disposal of the building structure as well as all its contents including, but not limited to all furnishings, trash, fixtures, appliances, electrical systems, chimneys, complete foundations, footers, bollards, and building structure.
2.3.4 IAW JBLE’s hazardous waste disposal policy, contractor is responsible for removal of all smoke alarms, fluorescent lights, batteries, thermostats and any other hazardous materials. Any hazardous materials shall be taken to building 1208 (Hazardous Waste Accumulation Facility) for disposal prior to demolition.
2.3.5 Bldg. 2701 was constructed in 1956. Asbestos Containing Materials (ACM) and
Lead Based Paint (LBP). If any additional testing is required, the cost shall be included in the contractor’s proposal. A full construction sample is permitted at the pre-bid site visit The Government has tested for asbestos containing materials (ACM) and lead based paint (LBP) in 1992. Given the decades that have passed since testing, a 30% (580 sq. ft) abatement is required. If any additional testing is
B. 2701
CUI
required, the cost should be included in the contractor’s proposal. A full destructive sample is permitted at the pre-bid site visit.
2.3.6 Contractor is responsible for evacuating and recycling refrigerants from all mechanical equipment prior to demolition. IF APPLICABLE
2.3.7 Dust resulting from demolition shall always be controlled.
2.3.8 The contractor shall not allow demolition debris to accumulate at the work site.
2.3.9 The utilities to Building 2701 (Gas, Electric, Water, Sewer, Fiberoptics etc.) will be disconnected and removed (by others) prior to each demolition. Contractor shall attend all coordination meetings with the Utility Service Providers.
2.3.10 In accordance with sound environmental principles and EMP 4.4.6.16, the contractor shall salvage or recycle as much steel, copper, aluminum, glass and lumber as possible. Weight tickets for all recycled material and material going to the landfill must be turned in to the CES PM within 14 days of recycling.
2.3.11 Remove and dispose of all foundations, footings and concrete sections.
2.3.12 Grade site such that all areas drain to exist drainage without ponding, substantial depressions, or unusual mounds of dirt. Remove dirt clods and rocks over ½” and hydroseed all the way to five (5) feet past the silt fence, or as determined at the Pre- Bid Site Visit (PBSV).
2.3.13 Repair ALL asphalt, sidewalks and concrete paving damaged by contractor operations. Backfill area of excavation as necessary to establish elevation matching that of surrounding area. Soil Compression Test prior to placing asphalt or concrete paving.
2.3.14 After demolition, Contractor shall thoroughly clean all sites of debris and grade all disturbed soil to implement positive drainage and hydro-seed the area with fescue grass. Contractor shall haul, spread and grade soil to ensure 4” of suitable top layer exists prior to seeding. Contractor shall water as necessary until grass is established.
Photo(s): Building 2701
Demo pipe/supports.
They do not connect to the adjacent building.
Demo Pol e /Braces.
It does not enter the adjacent building.
Floor Plan Drawing Bldg. 2701 (1,935 SF.)
2.4 UTILITIES. The privatized Utility Service Providers will disconnect all utilities to at least 5’ out from the buildings, and normally to the next primary connection point. Prior to demolition, contractor will ensure all utilities to building 656, 657, and 2701 (Gas, Electric, Water, Sewer, Fiber Optics etc.) have been disconnected, and that the underground water and sewage to the building have been cut and capped prior to each demolition. Contractors shall attend all coordination meetings with the privatized Utility Service Providers. The contractor shall coordinate utility disconnects with the CES PM and privatized utility providers. The contractor shall return all fire extinguishers, alarm panels and transmitters to the government if requested. The demolition contractor will not need to pay a fee for disconnecting.
2.4.1 Request for permission to shut down services shall be coordinated with the PM, CES and privatized utility providers not less than 14 calendar days prior to date of proposed interruption.
2.4.2 The request shall give the following information:
• Nature of Utility (Gas, Elect, Water, Etc.).
• Size of line and location of shutoff.
• Building and services affected.
• Date of shutoff.
2.4.3 Miss Utility: Contact Miss Utility (phone number: dial 811) to have utilities marked prior to demolition.
2.4.4 Shutoffs: Shutoffs which will cause interruption of Government work operations as determined by the CES shall be accomplished during regular non-work hours or non-workdays of the using agency without any additional cost to the Government.
2.4.5 Electrical: All electrical services at Ft Eustis is owned by Dominion Energy Virginia (DEV).
Contractors shall coordinate directly with DEV and the CES PM for all electrical connections or disconnections.
2.4.6 DEV will disconnect the electrical service and remove electrical equipment, transformers, and other DEV equipment in conflict with the demolition. After award, the contractor will need to coordinate with Dominion Energy (DEV) on a timeline that will give DEV enough time to completely remove DEV equipment before demolition begins. Some of the buildings need more work than others and will take much longer to complete equipment removal. The contractor is responsible for contacting Dominion in advance if temporary power will be needed at any of the buildings.
2.4.7 All water and sewer service on Ft Eustis is owned by American States Utility Services
(ASUS). Contractors will coordinate directly with ASUS and the CES PM for all water and sewage connections or disconnections.
CUI
2.4.8 Valve Operation: Where shutoff of water lines interrupts service to fire hydrants or fire sprinkler systems, the Contractor shall arrange his operations and have sufficient material and personnel available to complete the work without undue delay or restore service without delay in the event of an emergency.
2.4.9 Water Access: The contractor may attach to the nearest fire hydrants at each demolition site, if available. Priority use of the fire hydrants will be to provide water to fight fires. For using the water hydrants, the demolition contractor shall call American States Utility Services (ASUS) POC prior to the first hydrant hookup at each site and they will come out to the site.
The contractor shall use a backflow preventer on all hydrant connections, and the backflow preventer must be approved by ASUS and protected from freezing during winter months.
Notify ASUS POC after disconnecting from the fire hydrant at the completion of the building demolition.
2.4.10 All-natural gas service on Ft Eustis is owned by Virginia Natural Gas (VNG). Contractors will coordinate directly with VNG and the CES PM for all natural gas connections or disconnections.
2.4.11 Gas Mains: Flow in gas mains which have been shut off shall not be restored until the
Government inspector has stated that all items’ services by the gas line have been shut off.
2.4.12 The storm sewer system in Ft Eustis is not privatized and is not owned by ASUS. For services regarding the storm sewer contact the CES PM and Operations CES.
2.5 SITE RESTORATION: Contractor shall perform site restoration for buildings 656, 657, and 2701 in accordance with commercial practice and this PWS. After demolition, contractor shall thoroughly clean all sites of debris, restore and hydro seed areas that are made bare and/or damaged by the demolition, IAW EMP 4.4.6.16 “Environmental Special Conditions, Environmental Management Procedure’s, §11.7 Installation Clean Soil Program. Contractor shall haul, spread and grade to ensure 4 inches of suitable topsoil layer exists prior to seeding. Contractor shall water as necessary until grass is established. Mobilization of heavy equipment is at the contractor’s discretion but should not cause damage to roads, grounds, vegetation or surrounding areas.
2.5.1 Backfill area of excavation as necessary to establish elevation matching that of surrounding area.
Contractor shall restore any depressions and holes to finish grade to provide positive drainage at the site. The contractor shall take care to protect surrounding landscape existing trees will remain as they are and shall not be pruned or cut. The contractor shall only use approved routes to and from storage, work and disposal areas. Confine all operations, tools, and equipment, parking of vehicles and storage to areas designated by the Approved Storm Water Management Plan. If required, written requests for street closures shall be submitted fourteen working days prior to closing the street. The contractor shall reference UFC 3-220-O4FA (Backfill for Subsurface Structures) and EMP 4.4.6.16 in their proposal and include specifications that will be followed
CUI
related to material type, lifts, compaction, and testing procedures to ensure the finished site is suitable for future projects. Fill, compact, lift in 1-foot lifts to minimize settling.
2.5.2 Note 1: All soils (including topsoil and backfill dirt), grass sod, hay/straw, mulch, and other articles listed in EMP 4.4.6.16, §11.7 shall not be imported onto JBLE-Eustis if the source of the article is within the current Virginia Imported Fire Ant Quarantine Area. See EMP 4.4.6.16, §11.7 for full requirements.
See following web link to see a map of the quarantine area:
(https://www.vdacs.virginia.gov/plant-industry-services-fire-ant- suppression and- eradication.shtml)
2.5.3 Note 2: All soils (including topsoil and backfill dirt), grass sod, hay/straw, mulch, and other articles listed in EMP 4.4.6.16, §11.7 shall not be exported from JBLE-Eustis without the contractor entering into a written cooperative agreement with Virginia Department of Agricultural and Consumer Services (VDACS) and meet related protocols. See EMP 4.4.6.16, §11.7 for full requirements.
2.6 DELIVERABLES: The contractor shall submit all deliverables in electronic form and shall produce reports using the Microsoft Office suite of applications. All deliverables must meet professional standards, and the requirements set forth in contractual documentation. The contractor shall be responsible for delivering all end items specified.
Schedule of Deliverables
Contractor's Quality Control Plan (QCP) If applicable, include the Mission-Essential Contractor Services Plan in the QCP
NLT 10 business days after contract award
Current Employee Listing NLT 10 business days after contract award and upon change in personnel
DBIDS Employee Base Pass Spreadsheet NLT 14 days prior to starting demolition
Storm Water Pollution Prevention Plan. See §2.7.3.
See EMP 4.4.6.16 (Revised 26 Mar ’21) for additional information regarding the Environmental submittals.
Storm Water Management Plan. See §2.9.1.
NLT 10 business days after Contract award. See EMP 4.4.6.16, §8.1.2
Virginia Runoff Reduction Method (VRRM) compliance sheets
Include in the Storm water Management Plan.
(For LDA’s 10,000 sf and under, if the Contractor chooses to not submit an SMP, the VRRM still must be submitted.)
http://www.vdacs.virginia.gov/plant-industry-services-fire-ant-
Soil Management Plan
NLT 14 days prior to starting demolition
State and Local Permits
NLT 10 business days prior to starting
Fill Dirt Sampling Plan & Test Results NLT 15 days prior to this work phase
(reminder to schedule source location field visit with CES)
Topsoil Sampling Plan & Test Results NLT 15 days prior to this work phase (reminder to schedule source location field visit with CES)
Safety Plan (Accident Prevention Plan)
NLT 14 days prior to starting demolition
Appointment of new Supervisor or Quality Control Inspector. Include contact information.
Include DBIDS pass request if new arrival
As occurs, prior to arrival. Plan for 10 business days for DBIDS pass, but more time may be needed.
Hot Work Permit
NLT 3 business days prior to starting
Demolition Plan
NLT 15 days prior to starting demolition
Waste Management Plan
NLT 15 business days after contract award
Asbestos Sampling & Test Report
NLT 30 days prior to starting demolition
Asbestos Abatement Plan along with Personnel Respirator Fitness Test
NLT 30 days prior to starting demolition
Erosion & Sediment Control Plan if 2,500 sf disturbed. Show location of temporary fence and silt fence.
NLT 45 days prior to starting demolition
Site Plan
NLT 15 days prior to starting demolition
Asphalt or concrete paving submittal NLT 15 days prior to installing paving
Soil Compression Test prior to placing asphalt or concrete paving
NLT 3 days prior to placing asphalt or concrete paving
Manifests for Disposal of Materials
As Required
Manifests for Disposal of Hazardous Materials.
CUI
Transfer and Acceptance of DoD Real Property (DD Form 1354)
NLT 30 days prior to demolition completion
Inventory of Real Property Installation Equipment (RPIE), BUILDER data collection form
NLT 30 days prior to demolition completion
Virginia Department of Environmental Quality Erosion & Sediment Control Plan. This is required if the Local Data Area is more than 10,000 sf of disturbance.
NLT 60 days prior to starting demolition
Grading Plan. One for each building. May be combined with Erosion and Sediment Control Plan, or another submittal, or provided separately.
Same schedule as other documents. The Grading Plan will be combined with, but NLT 14 days prior to starting demolition of the building.
Asbestos Trip Ticket Manifest
NLT 40 days after signed by receiving landfill
Record of Waste Generated
NLT 10 business days after contract completion
DD 1354 Draft DD 1354: NLT 7 days prior to Final Inspection Final DD 1354: NLT day of Final Inspection See EMP 4.4.6.16 (Revised 26 Mar ’21) for additional information regarding the Environmental submittals. (Note: Don’t use the older EMP 4.4.6.16.)
Contract Progress Schedule (AF 3064) As Required
Contract Progress Report (AF 3065) As Required
2.6.1 Storm Water Management Plan (SWM): Provide Storm Water Management Plan IAW
EMP4.4.6.16, for Land Disturbing Activities (LDAs) over 10,000 sf. For Local Data Area LDAs 10,000 sf and under, it is the contractor’s responsibility to develop and implement a SWM Plan, but it does not have to be submitted to the Government (see EMP 4-4-6-16 §8.1.2).
2.6.2 Virginia Runoff Reduction Method (VRRM): Provide VRRM IAW EMP 4.4.6.16 §8.1.2 compliance sheet for each building. LDA, to document of reduces water runoff, due to changing from impervious cover to managed turf.
CUI
Go to the Virginia Stormwater Best Management Practices (BMP) Clearinghouse website at https://swbmp.vwrrc.vt.edu/vrrm/Under “TOOLS”, select “VVRM Redevelopment Spreadsheet” link, to download the “VA Department of Environmental Quality Virginia Runoff Reduction Method Re- Development Compliance Spreadsheet”.
2.6.3 Storm Water Pollution Prevention Plan: If greater than one acre of land will be impacted by this project, the contractor shall also submit a Storm Water Pollution Prevention Plan IAW EMP 4.4.6.16 to the government to be covered by the base NPDES permit. EMP 4.4.6.16 §8.1.3 states. The contractor must develop a SWPPP and submit with the registration statement of coverage under the permit. A copy of the SWPPP must be submitted to the CEIE Water Program Manager so that it can be referenced during internal inspections and VDEQ site visits. More information on what should be included in the SWPPP can be found at the link below:
https://www.deq.virginia.gov/Portals/0/DEQ/Water/StormwaterManagement/CGP%20A D A/CGP2019.pdf?ver=2019-05-06-131630-407
2.6.4 Permits: The contractor shall provide a copy of all required state and local agency permits to the Contracting Officer before starting any demolition services at Fort Eustis.
The permits shall always remain on the job site.
2.6.5 Hot Work Permit: Before using any spark producing devices or open flames either inside or outside of work areas, the contractor shall obtain a Hot Work permit from the Post Fire Department at least three (3) days in advance.
2.6.6 Waste Management Plan. A waste management plan (IAW EMP 4.4.6.16) shall be submitted within 15 days after contract award and prior to initiating any site preparation work. The plan shall include the following:
A. Name of individuals on the contractor's staff responsible for waste prevention and management.
B. Actions that will be taken to reduce solid waste generation
C. Description of the specific approach used in recycling/reuse of the various materials generated, including the areas and equipment to be used for processing, sorting, and temporary storage of waste.
D. Characterization, including estimated types and quantities, of the waste to be generated.
E. Name of landfill and/or incinerator used.
F. Identification of local and regional reuse programs, including non-profit organizations such as schools, local housing agencies, and organizations that accept used materials such as materials exchange networks and Habitat for Humanity.
http://www.deq.virginia.gov/Portals/0/DEQ/Water/StormwaterManagement/CGP%20AD http://www.deq.virginia.gov/Portals/0/DEQ/Water/StormwaterManagement/CGP%20AD
G. List of specific waste materials that will be salvaged for resale, salvaged and reused, or recycled.
H. Identification of materials that cannot be recycled/reused with an explanation or justification.
I. Anticipated net cost savings determined by subtracting Contractor program management costs and the cost of disposal from the revenue generated by sale of the materials and the incineration and/or landfill cost avoidance.
2.6.7 Waste Generated Record. Records shall be maintained to document the quantity of waste generated; the quantity of waste diverted through sale, reuse, or recycling; and the quantity of waste disposed of by landfill or incineration. The records shall be made available to the Contracting Officer during construction, and a copy of the records shall be delivered to the Contracting Officer upon completion of the construction.
2.6.8 Asbestos Trip Ticket Manifest. The manifest shall be submitted NLT 40 days after being signed by receiving landfill. Manifest shall include product that is demolished, quantity, date, truck number, demolished building number, signature from 733 CES/CEIE Hazardous Waste Manager, demolition Contractor, transporter company name, driver’s name/signature, disposal site, name/signature of receiver.
Note: The Manifest document typically originates from the receiving landfill.
2.6.9 Construction/Demolition and Debris. Submit Construction/Demolition and Debris
(C&D) tickets IAW EMP 4.4.6.16. Remember to also include the “Construction/Demolition(C&D) Debris Recycling and Reporting” form in EMP 4.4.6.16Attachment 1, with each quarterly submittal.
2.7 (Underground storage tanks (UST)). There is no UST(s) at demolition site. If the contractor encounters any other UST(s), please call the Government Project Manager (PM) or Quality Assurance Inspector (QA).
2.7.1 Construction Scheduling. The contractor may work on more than one building at a time, as long as:
a) They deploy a large enough work force that each site under demolition is being actively worked, and sites are not left with open debris for any extended period.
b) They provide a superintendent or alternate superintendent at each site.
2.7.2 Progress Reporting. The contractor shall submit all schedule work on (Contract
Progress Schedule) AF 3064 with approval of the contracting officer. Once work in progress has been completed the Contract Progress Report (AF 3065) must be completed and forwarded to contracting officer for approval for payment.
3.0. GENERAL INFORMATION
3.1. Hours of Operation. The hours of operation are 0700 to 1600 Eastern Standard Time (EST), Monday – Friday, excluding federal holidays; if the contractor wishes to perform any services outside of the normal hours of operation, the contractor shall coordinate with the Contracting Officer Representative (COR) and the Contracting Officer (CO) no later than one week prior to the scheduled event. In the event of emergency circumstances, accommodations may be made on a case-by-case basis.
3.1.1. Base Closure Days. If the Base Commander determines the base is closed due to snow, hurricane, or Acts of God, the contractor shall reschedule work planned for this time.
3.1.2. Federal Holidays. The Contractor shall not be required to work any of the following federal holidays:
New Year’s Day - 1 January Martin Luther King Day - 3rd Monday in January President’s Day - 3rd Monday in February Memorial Day - last Monday in May Juneteenth – 19 June Independence Day - 4 July Labor Day - 1st Monday in September Columbus Day - 2nd Monday in October Veteran’s Day - 11 November Thanksgiving Day - 4th Thursday in November Christmas Day - 25 December
3.1.2.1. If a holiday falls on Saturday, the preceding Friday shall be observed. If a holiday falls on Sunday, the following Monday shall be observed. If a holiday falls on a scheduled service day, the contractor shall be responsible for rescheduling services for the first day post the holiday observance.
3.2. Non-Mission-Essential Functions. It has been determined by the Functional Commander of this service that the requirements under this PWS are non-essential and shall not be performed during a crisis, exercise or inclement weather.
3.3. English Language Requirement. All contractor personnel shall read, understand, speak and write English fluently.
3.4. Contract Manager. The Contractor shall provide a contract manager and an alternate who shall be responsible for the performance of the work; these duties can be an additional duty. These individuals shall have full authority to act for the contractor on all contract matters relating to the daily operation of this contract and shall be designated, in writing, to the Contracting Officer (CO).
The alternate contract manager shall act for the contract manager when the manager is absent.
3.4.1. The contract manager or alternate shall be available within 2 hours to meet on the installation or by telecom with the CO and/or with other government personnel designated by the CO during normal duty hours to discuss issues or concerns.
3.5. Communication. Contractor personnel shall always maintain open and professional communication with government personnel. Complaints validated by the COR shall be reported in writing to the CO and the contractor for action. Failure of the contractor to take corrective action on validated complaints raised by the COR, and the CO will be considered a failure to perform.
3.6. Appearance. Contractor personnel shall present a professional, conservative, and neat appearance. Contractor personnel shall report for duty in a professional manner, in appropriate attire and having complied with socially acceptable standards of personal hygiene.
3.7. Contractor Identification. All contractor personnel attending meetings, answering Government telephones, and working in other situations where their contractor status is not obvious are required to identify themselves as such to avoid being mistaken for Government officials. Contractors performing work at Government workplaces will provide their employees with an easily readable identification (ID) badge indicating the employee's name, the contractor’s name, the functional area of assignment, and a recent color photograph of the employee. Contractors shall require their employees to wear the ID badges visibly when performing work at Government workplaces. Contractor personnel must also ensure that all e-mails, documents, or reports they produce are suitably marked as Contractor products or that Contractor participation is appropriately disclosed. All signature blocks on e-mails shall indicate the Contractor's name. All e-mail address lines shall include CTR in the address line.
3.8. Conflict of Interest. The contractor shall not employ any person who is an employee of the United States Government if the employment of that person would create a conflict of interest.
The contractor shall not employ any person who is an employee of the Department of the Air Force, either military or civilian, unless such a person seeks and receives approval in accordance with the Department of Defense (DOD) Directive 5500.7 and Air Force policy. If prior military, personnel must have been discharged under honorable conditions with no administrative actions taken against them.
3.9. Security Requirements for Unclassified Contracts. The contractor shall ensure the necessary pass and identification items required for contract performance are obtained for all personnel.
3.9.1. Listing of Personnel. The contractor shall maintain a current list of personnel. The list shall include the employee’s name, social security number and level of security clearance. The list shall be validated and signed by the company’s Facility Security Officer (FSO) and provided to the sponsoring agency’s security manager, the COR, and the CO.
An updated listing shall be provided when an employee’s status or information changes.
3.9.2. Base Access Passes. The contractor shall ensure that each employee obtains the following pass and identification items: all necessary cards, passes, buttons, decals, or other items required for access to the areas and the installation. Upon contract award and the replacement of any employees, the contractor will be required to complete a base access request form which will be submitted to the COR. The COR will submit the pass request to the 733d Security Forces Squadron (733 SFS) to obtain the necessary identification items. Upon approval of the pass request by 733 SFS, the contractor employee will be required to obtain any individual and vehicle identifications media at the 733 SFS Pass and Identification Section, (Bldg. 2) on Fort Eustis, VA. If contractor personnel already have current Langley-Eustis DBIDS cards (or long-term passes), they may use them to come through the manned entries at the Main Gate, until they expire.
3.9.3. Pass and Identification. All prospective contractors shall undergo a verification process to determine trustworthiness and suitability prior to being granted access to federal property. Limited access with escort may be granted (at the installation's discretion) for an interim period while investigations are being conducted. The 633d Security Forces Squadron or 733d Security Force Squadron, as appropriate, will conduct background checks on all contractor personnel requiring access to the installation. IAW 18 USC 1382, the authority of the Installation Commander to control and deny a Contractor employee entry to all or part of the installation is absolute.
3.9.4. Employee clearance requirements. As a minimum, contractor personnel must be able to obtain and maintain a TIER 1, favorable suitability/fitness determination under 5 CFR 731 or equivalent. The Government will submit background investigations for positions that require a Common Access Card (CAC) and/or IT access only. Prior to CAC issuance, an FBI fingerprint check must be completed without adverse comment, and the T1 Investigation or equivalent must be initiated. CACs will not be issued before the fingerprint check results have been completed and the investigation has been opened/scheduled at Office of Personnel Management (OPM). Contractor personnel receiving unfavorable T1 Investigations shall not be employed. The sponsoring Government agency will submit requests for investigation on AF Form 2583, Request for Personnel Security Action, at no additional cost to the contractor. The contractor shall comply with the requirements of DoDM 5200.02, AFM 16-1405 Personnel Security Program and AFI 33-119, Electronic Mail (E-Mail) Management and Use.
3.9.5 Physical Security (Security of Government Property). The contractor shall safeguard all government property, including controlled forms provided for contractor use.
At the close of each work period, government equipment, facilities, and squadron assets and materials shall be secured.
3.9.6. Entry procedures to Controlled/Restricted Areas. The contractor shall implement local procedures for entry to Air Force (AF) controlled/restricted areas where contractor personnel will work.
3.9.7. Reporting Requirements. The contractor shall comply with the requirements of Volume1, AFI 71-101, Criminal Investigations, and paragraph 1.1 of Volume 2, Protective Service Matters. Contractor personnel shall report to an appropriate authority any information or circumstances of which they are aware that may pose a threat to the security of DOD personnel, contractor personnel, resources, and classified or unclassified defense information. The contractor personnel’s immediate supervisor shall brief him/her upon initial on-base assignment and as required thereafter.
3.9.8. Retrieving Identification Media. The contractor shall return all identification media to the sponsoring agency’s security office, the COR or the CO upon completion/termination of the contract or upon departure of any personnel during the contract. Failure to do so may delay payment to the contractor. Final payment may be withheld until identification media is returned.
3.9.9 Key Control. The contractor shall establish and implement key control procedures in the Quality Control Plan (QCP) to ensure keys issued to the contractor by the government are properly safeguarded and not used by unauthorized personnel. The contractor shall not duplicate keys issued by the government. Contractor personnel shall not use keys to open work areas for personnel other than contractor personnel engaged in performance of their duties, unless authorized by the Facility Security Officer (FSO) or Facility Manager.
Contractor will return keys to the government after demolition of the building is complete.
3.9.9.1. Lost Keys. Lost keys shall be reported immediately to the CO and the COR.
The government replaces all lost keys and performs re-keying for all government owned facilities. The total cost of the keys, re-keying or lock replacement shall be deducted from the price of the contract.
3.10. Traffic Laws. The contractor and/or contractor personnel shall comply with the installation traffic code as specified in Virginia State Law and Air Force Instruction (AFI) 31- 218, Motor Vehicle Traffic Supervision (current edition). The Contractor and/or contractor personnel shall comply with current instruction on cell phone use while on any military installation. The movement of all vehicles within the Post shall be confined to the roads designated and shall comply with traffic regulations within the post. Other roads may be used only with the approval of the Quality Assurance Inspector (QAI). The contractor shall keep all roads free of mud and other foreign material resulting from his operations.
Parts of Fort Eustis are restricted access where privately owned vehicles are not allowed and special identification for each person’s entry is required.
3.10.1 Parking and Staging Areas. The contractor staging area(s) shall be at a designated location approved by the PM CES and the COR. The contractor shall store approved trash receptacles, construction materials and equipment in these area(s). The contractor shall maintain these area(s) in a clean and safe manner as approved by the Contracting Officer.
The Contractor's trailer, toilet facilities for use, and a parking area for personal vehicles will be designated in the vicinity of the Contractor staging area(s). The Government will not reimburse the contractor for any losses the contractor may suffer for equipment stored at this or any other site on the installation.
3.10.2. No trailers, materials, or equipment shall be placed or stored outside the fenced area(s). All areas used by the Contractor, for the storage of equipment or materials, or other use, shall be restored to the original or better condition upon completion of the project.
Utilities connections to contractor temporary office trailer shall be accomplished by the Contractor, and payment for utility use shall be paid by the Contractor.
3.11. Weapons, Firearms, and Ammunition. Contractor personnel are prohibited from possessing weapons, firearms, or ammunition, on themselves or within their contractor-owned vehicle or privately-owned vehicle while on any military installation. This prohibition includes any individual who may otherwise possess any legally issued concealed weapons permit.
3.12. Smoking in Air Combat Command (ACC) Facilities. Contractors are advised that the ACC Commander has places restrictions on the smoking of tobacco products in ACC facilities.
AFI 40-102, Tobacco Use in the Air Force (current edition), outlines the procedures used by the commander to control smoking in our facilities. Contract personnel and visitors are subject to the same restrictions as Government personnel. Smoking is permitted only in designated smoking areas.
3.13. ENVIRONMENTAL MANAGEMENT: Joint Base Langley-Eustis (JBLE) is dedicated to the conservation, protection, and enhancement of the environment. The contractor shall comply with all: federal laws and regulations; state and local laws, ordinances, and regulations; and Installation policies and procedures. JBLE Installation specific policies and procedures:
3.13.1. Joint Base Langley-Eustis - Fort Eustis. The contractor must comply with JBLE Environmental Management Procedure (EMP) 4.4.6.16 “Environmental Special Conditions, Environmental Management procedures”. EMPs are reviewed and/or updated at least annually.
JBLE EMPs can be reviewed and downloaded at: http://www.jble.af.mil/Units/Army/Eustis- Environmental.
EMP 4.4.6.16 “Environmental Special Conditions, Environmental Management procedures” (revised 26 March 2021) may be found at the following web site:
https://www.jble.af.mil/Portals/46/Documents/Eustis%20Environmental/EMPs/Misc%20EMPs/EMP http://www.jble.af.mil/Units/Army/Eustis-http://www.jble.af.mil/Units/Army/Eustis-http://www.jble.af.mil/Portals/46/Documents/Eustis%20Environmental/EMPs/Misc%20EMPs/EMP
%204_4_6_16%20Contracting%20Environmental%20Special%20Conditions%20-%20JBLE- Eustis.pdf?ver=5saynAugvG14P6nbW_r_6w%3d%3d.
3.13.2. As part of the submittal process for back-fill dirt and top-soil dirt, contractor shall arrange a visit to the submitted sources of back-fill dirt and top-soil dirt with the CES PM and the Environmental Element POC.
3.14. Safety Standards. The contractor shall comply with the "Occupational Safety and Health Administration (OSHA)" Safety and Health Regulations for Construction, Part 1926, for the performance of all work under this contract.
3.14.1. The contractor shall comply with accident reporting requirements as outlined in AR 420-1, Army Facilities Management. All accident reports will be reported immediately to the QAI/COR/PM.
3.14.2. The contractor shall comply with all safety requirements outlined in AR 420-1, Army Facilities Management, Facilities Engineering: Fire and Emergency Services, Fire Prevention Program, and all rules and regulations issued by the National Fire Protection Association covering storage and use of inflammable mixtures of materials which might constitute a fire hazard.
3.14.3. Confined Spaces. For personnel working in confined spaces, the Contr. shall have their own Confined Space Program that meets OSHA Regulation 29 CFR 1910.146, and 29 CFR 1926 Subpart AA. The Contr. shall have a Confined Space Entry Permit that meets the above regulations; and at the job site each day for any confined space that gets entered, the Contr. shall keep a signed copy of this permit for possible review. CES does not sign the permit.
OSHA Regulation 29 CFR 1910.146 may be found at (https://www.osha.gov/laws-regs/regulations/standardnumber/1910/1910.146 )
OSHA Regulation 29 CFR 1926 Subpart AA may be found at (https://www.osha.gov/laws-regs/regulations/standardnumber/1926/1926SubpartAA )
3.14.4. Covid-19. For current general safety protocols regarding Covid-19, see the Joint Base Langley-Eustis home page at (https://www.jble.af.mil/).
3.15. CLEAN UP. Remove rubbish, debris, and construction materials daily. All rags, cotton waste or materials which might constitute a fire hazard shall be placed in metal containers or destroyed at the end of each day. Upon completion of the work, all staging, scaffolding and containers shall be removed from the site. The contractor shall not deposit or place any cloths, rags, waste, trash or debris in Government owned trash cans, containers or receptacles. The contractor shall furnish adequate trash cans for his use on this contract. All these materials shall be disposed of off post at the Contractor's expense.
3.15.1 Debris shall be removed and transported in a manner that prevents spillage on streets or adjacent areas. Local regulating hauling and disposal shall apply. All vehicles for hauling debris shall be covered.
3.15.2 Note: Concrete cannot be crushed on site and used as fill.
http://www.osha.gov/laws-regs/regulations/standardnumber/1910/1910.146 http://www.osha.gov/laws-regs/regulations/standardnumber/1926/1926SubpartAA http://www.jble.af.mil/)
The Contractor is permitted to crush concrete IAW EMP 4.4.6.16 but may not use it for fill. The Contractor must have their own VDEQ Operating Permit and should be familiar with dust suppression.
Note: EMP 4.4.6.16 §6.1.2 Dust states, “[If the project is likely to create dust emissions, the following requirement applies] Mitigation of fugitive dust emissions shall be accomplished in accordance with 9 VAC5-40-90, Standard for Fugitive Dust/Emissions.” 9 VAC5-40-90 may be found at the following web site:
https://law.lis.virginia.gov/admincode/title9/agency5/chapter40/section90/
All concrete, whether crushed or not, shall be removed off Base.
3.16. Operations Security (OPSEC) This contract has been determined to not have critical or sensitive information requiring an OPSEC Plan.
4.0. SERVICES SUMMARY (SS).
4.1. The contract service requirements are summarized in performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimally acceptable levels of service required for each requirement. The SS and the contractor’s Quality Control Plan provide information on contract requirements, the expected level of contractor performance and the expected method of government surveillance and confirmation of services provided. These thresholds are critical to mission success. Procedures set forth in the Federal Acquisition Regulation (FAR) 52.212-4 (a), Contract Terms and Conditions - Commercial Items, Inspection/Acceptance, will be used to remedy all deficiencies. The absence of any contract requirements from the SS shall not detract from its enforceability nor limit the rights or remedies of the Government under any other provision of the contract. The Government has the right to inspect all services required in the contract.
SERVICES SUMMARY TABLE
Item Performance Objective
PWS
Para
Performance Threshold
Method of Surveillance
SS-1 Environmental Compliance: Comply with all federal, state, local, and Fort Eustis Environmental Laws, Regulations, Instructions and Publications and the National Emission Standards for Hazardous Air Pollutants (NESHAP)
3.13. Environmental
Compliance:
Comply with all federal, state, local, and Fort Eustis Environmental Laws, Regulations, Instructions and Publications and the National Emission Standards for Hazardous Air Pollutants
(NESHAP)
Daily Inspections, Submittals Accepted, and Manifests and Trip Tickets received and approved
SS-2 Demolish buildings in accordance with the PWS
2.0. The contractor’s
performance shall be ACCEPTABLE When service is completed, and the Final Inspection is accepted.
Daily Inspections and Final Inspection is accepted for all buildings
SS-3 Utilities. Provide notification of any disruption of service
2.3. The contractor’s
performance shall be determined
ACCEPTABLE
As Required when service does not exceed two valid Customer complaints.
SS-4…
This is the start of the file's text. The full file is on GovTribe.