This is a Statement of Work (SOW) for a Blanket Purchase Agreement (BPA) to provide work uniforms for NIH's Central Utility Plant (CUP) employees in Bethesda, MD. The contract includes a base year plus four option years, with a requirement to provide up to 280 shirts and 280 pants annually on an as-needed basis. The uniforms must be Bulwark iQ Series FR with Category 2 Protection certification, meeting ASTM F1506, NFPA 2112, and NFPA 70E standards. Shirts come in Light Blue, Charcoal Gray, or Navy based on position, while pants must be Navy Blue.

The contractor must provide custom embroidery with NIH logo and position emblems (attached via Velcro), conduct in-person measurements at the NIH Bethesda Campus, and deliver uniforms within four weeks of notice. Key deliverables include uniform specifications, samples, and patches/emblems within 20 business days of Notice to Proceed. Responses to the Request for Information are due by December 26, 2024, and proposals must include pricing for base plus 4 option years and a technical proposal submitted to the Contracting Officer. The uniforms support the NIH CUP facility, which operates 24/7 and includes a boiler plant, chilled water plant, and cogeneration facility.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Division of Technical Resources Statement of Work

NATIONAL INSTITUTES OF HEALTHOffice of Research Facilities
Utilities Systems Design and Technical Support Branch
Bldg. 11, Rm. 203, 11 Service Road West, Bethesda, MD 20892

STATEMENT OF WORK

FOR

SUPPLY SERVICES

CUP WORK UNIFORMS

TABLE OF CONTENTS

1.Project Contact Persons3
2.Introduction3
3.Objective4
4.Background4
5.Scope of Work:4
6.Project Management5
7.Quality Assurance5
8.Contractor Qualifications5
9.Submittals5
10.Deliverables6
11.Performance Schedule6
12.Close-Out6

Project Contact Persons A. Contracting Officer (overall authority in all contractual matters for this project) Brian Baek National Institutes of Health Office of Research Facilities Office of Acquisition, AECCB Building 13, Room 2E48 9000 Rockville Pike Bethesda, MD 20892-5711 Telephone: (301) 435-1604 Email: brian.baek@nih.gov B. Project Officer/Contracting Officer’s Representative (project management and technical authority for this project) Roshan Pandey National Institutes of Health Office of Research Facilities Utility Systems Design and Technical Support Branch Building 13, Room 210 9000 Rockville Pike Bethesda, MD 20892-5758 Telephone: (301) 827-6505 Email: roshan.pandey@nih.gov

C. Contracting Specialist (CS) Brian Baek National Institutes of Health Office of Research Facilities Office of Acquisition, AECCB Building 13, Room 2E48 9000 Rockville Pike Bethesda, MD 20892-5711 Telephone: (301) 435-1604 Email: brian.baek@nih.gov D. In this scope of work, the Government point of contact will be the PO. All correspondence shall only be issued through the PO.

Introduction NIH Central Utility Plant: The Central Utility Plant (CUP), located in Building 11, generates steam and chilled water for distribution to the buildings on the Bethesda Maryland campus. The continuous and efficient operation of the CUP is critical for the NIH mission.

The CUP includes a boiler plant with an installed maximum steam generating capacity of 800,000 pounds per hour of steam and a chilled water plant with an installed chilled water generating capacity of 60,000 tons of cooling. NIH also has a 23 MWe cogeneration facility (gas turbine with heat recovery steam generator). The steam generating capacities of the heat recovery steam generator (HRSG) (referred to as Boiler No. 6) are unfired 107,000 PPH and fired 180,000 PPH. The CUP houses five traditional gas and oil-fired boilers and twelve chillers to meet the ongoing 24/7 operations of the research activities on campus.

CUP Uniforms: The NIH CUP recently purchased new uniforms (Bulwark iQ Series FR Shirts and Pants) more suited for the work environment of the employees and are certified CAT 2 and NFPA 2112. The uniforms are also customized with an embroidered NIH logo and position emblem specific to each employee. The color of the shirts also varies based on the employee’s position.

Objective The objective is to establish a Blanket Purchase Agreement (BPA) to procure additional uniforms on an as-needed basis equivalent to current uniforms for future NIH CUP employees to maintain consistency and worker safety.

Background A.

a. Project Title: CUP Work Uniforms

b. Location: Building 11 Scope of Work:

NIH seeks to secure a Blanket Purchase Agreement (BPA) contract to provide work uniforms for newly hired NIH CUP employees for the Base Year and four (4) Option Years. The work uniforms must be equivalent to the uniforms currently in use by the NIH CUP, as detailed below.

The Contractor shall provide:

A. Bulwark iQ Series FR Woven Men's Lightweight Shirt

a. Quantity: Contractor shall provide up to two hundred eighty (280) shirts per year, which will be ordered on an as-needed basis as new employees are onboarded.

b. Certifications: Category 2 Protection, ASTM F1506, NFPA 2112, NFPA 70E

c. Hazard: Arc Rating ATPV 8.5 cal/cm2

d. Color shall be Light Blue (QS52LB), Charcoal Gray (QS50DG), or Navy (QS50NV), depending on the employee’s position.

e. Contractor shall include embroidery of custom NIH logo, name emblem, and custom Position Emblem

i. Design for position emblems and NIH logo will be provided by NIH

ii. Position emblems will be attached via Velcro, to be included by the Contractor

B. Bulwark iQ Series FR Men's Lightweight Pant

a. Quantity: Contractor shall provide up to two hundred eighty (280) pants per year, which will be ordered on an as-needed basis as new employees are onboarded.

b. Color shall be Navy Blue (QP14NV)

c. Certifications: Category 2 Protection, ASTM F1506, NFPA 2112, NFPA 70E

d. Hazard: Arc Rating ATPV 8.5 cal/cm2 C. Shirt color, position emblem, and sizes are dependent on the new employee and will be coordinated with NIH CUP.

a. Contractor shall come measure employees onsite at NIH to determine sizing.

b. Position emblems will be attached via velcro.

c. Name patch of the employees in uniform.

D. Contractor shall come to NIH site to measure employees to determine sizing.

E. Provide 1 year warranty covering all defects.

F. The Contractor shall provide delivery of the uniforms to NIH Bethesda Campus at:

Building 11 (Central Utility Plant) National Institutes of Health 9000 Rockville Pike Bethesda, MD 20892-5758

G. Contractor shall provide submittal of uniform specifications and a sample of each color uniform and each patch/emblem for NIH approval within twenty (20) business days of NTP.

Project Management The contractor shall appoint an Account Manager, who shall be the Government's single point of contact, and provide all necessary project representation for the successful accomplishment of the work. The Account Manager shall be thoroughly familiar with all requirements.

Quality Assurance NIH reserves the right to review and reject any material, equipment, method, design, or qualifications of any, manufacturer, or testing laboratory performing work under this project that it determines to not be in conformance with project requirements, acceptable practice, or suitable to the project application.

Contractor Qualifications To be deemed qualified, the Contractor shall be able to provide the product as described in Section 5. Scope of Work with conformance to all listed requirements. The contractor must be able to provide custom embroidery affixed to the garments, as well as Velcro for removable position emblems, and provide uniforms on an as-needed basis as new employees are onboarded. Contractor shall be able to provide uniforms within four weeks notice. Contractor shall be able to take measurement of new employees in-person at NIH Bethesda Campus for sizing of uniforms.

Submittals E. Contractor shall provide submittals to NIH Project Officer for approval. NIH shall have ten (10) business days to review submittals.

F. Upon review of the submittals, the Government shall take one of the following actions:

a. Determine that the documents or submittals are in conformance with the Contract and approve them.

b. Determine that the documents or submittals are not in conformity with the Contract and reject them.

c. Determine that the documents or submittals are not in conformity with the Contract, but are accepted pending incorporation of the Government’s comments.

Deliverables G. Specifications of Uniform within twenty (20) business days of NTP.

H. Sample Uniform within twenty (20) business days of NTP.

I. Sample of each patch and emblem for embroidery within twenty (20) business days of NTP.

J. Instructions for maintaining uniforms within five (5) business days of receipt of first uniform.

K. Warranty Document within five (5) business days of receipt of first uniform.

Performance Schedule A. NTP: The work shall proceed within 14 days after the issuance of the Notice to Proceed (NTP) by the CO for the activities indicated.

B. Period of Performance: Three hundred sixty-five (365) days, plus four (4) option years

Close-Out At the close of the project, the contractor shall package all documents related to the project (including submittals) in an orderly manner and send them to the PO for archiving. The project closeout documents shall, at a minimum, consist of the following documents:

A. Instructions for Maintaining Uniforms B. Warranties C. Approved Submittals

END OF STATEMENT OF WORK