This is a Statement of Work (SOW) and related Sources Sought notice for the US Coast Guard to obtain access to specialized engineering software through subscriptions to the Cooperative Research Navies (CRNAV) Dynamic Stability and Cooperative Research Ships (CRS) software suites. The software is used for vessel sustainment and acquisition analysis, including stability criteria, operator guidance in heavy weather, ship structure/fatigue loads, composite propellers, maneuvering operations, and propeller efficiency calculations.
The contractor must provide and maintain both software suites, including updates, technical support, and bug fixes. Key deliverables include quarterly progress reports, software documentation, working group reports, and meeting minutes. The period of performance is 12 months. The Sources Sought notice indicates the government intends to award a sole source contract to Stichting Maritiem Research lnstituut Nederland (MARIN), believing they are the only source for these software suites. Interested vendors must demonstrate capabilities by June 28, 2024 by submitting relevant past performance details to Kenneth.C.Tankersley2@uscg.mil.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK (SOW)
FOR
CRNAV and CRS SOFTWARE ACCESS AND SUPPORT SERVICES
1.0 GENERAL
1.1 BACKGROUND
The purpose of this acquisition is to provide US Coast Guard access to data and specialized engineering software used in sustainment and acquisition of USCG Cutters and boats.
1.2 SCOPE
The contractor shall provide the US Coast Guard access to data and specialized engineering software used in sustainment and acquisition of USCG Cutters and boats through a software subscription. This access is provided through the Cooperative Research Navies (CRNAV) Dynamic Stability Joint Industry Government Project and Cooperative Research Ships (CRS) Joint Industry Government Project software suites.
The CRNAV dynamic stability software includes codes for nonlinear larger amplitude vessel motion predictions. The software products are used to apply stability criteria and provide operator guidance in heavy weather for both intact and damaged ships, including naval ships and Coast Guard cutters.
The CRS software provides applied naval architecture tools that address:
· SHIP STRUCTURE / FATIGUE LOADS
· COMPOSITE PROPELLERS
· MANEUVERING OPERATIONS REQUIREMENTS
· PROPELLER EFFICIENCY AND LOADS
· ADDED RESISTANCE IN WAVES
1.3 OBJECTIVE
The specialized engineering software and validation data provided through this solicitation will support USCG acquisition and sustainment programs by improving analyses of vessel performance, lowering technical risks, and increasing efficiencies.
2.0 SPECIFIC REQUIREMENTS/TASKS
2.1 TASK ONE. CRNAV DYNAMIC STABILITY SOFTWARE SUBSCRIPTION
2.1.1 The contractor shall provide access to the CRNAV software suite, which includes FREDYN, Long Run Extreme Value Load Estimation Interactive (LORELEI), Flexible Analysis Method for Extreme Response (FAME), and Fredyn Database Viewer (FDBviewer).
2.1.2 The contractor shall maintain the software, including providing regular updates, technical support, bug fixes, and issue resolution.
2.2 TASK TWO. CRS SOFTWARE SUBSCRIPTION
2.2.1 The contractor shall provide access to the CRS software suite, which includes Structural Loads (STRUC), Hull Pressure Calculation (PRECAL), Crabbing Near Quays (COGNAC), Propeller Design and Tool Development (PROPDEV), Off-axis Propeller Loads (PROPLOADS), and Maneuvering in Waves (MANWAV).
2.2.2 The contractor shall maintain the software, including providing regular updates, technical support, bug fixes, and issue resolution.
3.0 CONTRACTOR PERSONNEL
3.1 QUALIFIED PERSONNEL
The Contractor must provide qualified personnel to perform all requirements specified in this SOW.
3.2 CONTINUITY OF SUPPORT
The Contractor must ensure that the contractually required level of support for this requirement is maintained at all times. The Contractor must ensure that all contract support personnel are present for all hours of the workday. If for any reason the Contractor staffing levels are not maintained due to vacation, leave, appointments, etc., and replacement personnel will not be provided, the Contractor must provide e-mail notification to the Contracting Officer’s Representative (COR) prior to employee absence. Otherwise, the Contractor must provide a fully qualified replacement.
4.0 OTHER APPLICABLE CONDITIONS
4.1 SECURITY
Contractor access to unclassified, but Security Sensitive Information may be required under this SOW. Contractor employees must safeguard this information against unauthorized disclosure or dissemination.
4.2 PERIOD OF PERFORMANCE
The period of performance for this contract is one (1) 12- month period for phase 12.
4.3 PLACE OF PERFORMANCE
The primary place of performance will be the Contractor’s facilities.
4.4 HOURS OF OPERATION
No requirement.
4.5 TRAVEL
Contractor travel is not required.
4.6 POST AWARD CONFERENCE
The Contractor must attend a Post Award Conference with the Contracting Officer and the COR no later than 10 business days after the date of award. The purpose of the Post Award Conference, which will be chaired by the Contracting Officer, is to discuss technical and contracting objectives of this contract and review the Contractor's draft project plan. The Post Award Conference will be held via teleconference.
4.7 PROJECT PLAN
The Contractor must provide a draft Project Plan at the Post Award Conference for Government review and comment. The plan, at a minimum, must include: (a) list of work to be performed;(b) project schedule; (c) description of intended results; (d) (e) how quality of service (project) will be maintained throughout life of contract. The Contractor must provide a final Project Plan to the COR not later than 10 business days after the Post Award Conference.
4.8 BUSINESS CONTINUITY PLAN
Not required.
4.9 PROGRESS REPORTS
The Project Manager must provide a quarterly progress report to the Contracting Officer and COR via electronic mail. This report must include a summary of all Contractor work performed, including an assessment of technical progress, schedule status, and any Contractor concerns or recommendations for the previous reporting period.
4.10 PROGRESS MEETINGS
The Project Manager must be available to meet with the COR upon request to present deliverables, discuss progress, exchange information and resolve emergent technical problems and issues. These meetings must take place via teleconference.
4.11 GENERAL REPORT REQUIREMENTS
The Contractor must provide all written reports in electronic format with read/write capability using applications that are compatible with DHS workstations (Microsoft Office Applications).
4.12 INTELLECTUAL PROPERTY
The contractor shall provide the U.S. Coast Guard with a non-exclusive, non-transferable license to use the software specified in this Statement of Work for the duration of the contract period. This license shall permit use of the software by authorized U.S. Coast Guard personnel for official purposes related to vessel sustainment and acquisition.
The contractor shall provide documentation of all relevant software licenses, including any third-party software incorporated into the systems provided. Any limitations on use, number of users, or other relevant restrictions shall be clearly specified.
4.13 PROTECTION OF INFORMATION
The U.S. Coast Guard shall retain ownership of all data input into the software systems and any outputs generated through the use of the software. The contractor shall not use, share, or distribute any U.S. Coast Guard data without explicit written permission.
4.14 SECTION 508 COMPLIANCE
Section 508 of the Rehabilitation Act (classified to 29 U.S.C. § 794d) requires that when Federal agencies develop, procure, maintain, or use information and communications technology (ICT), it shall be accessible to people with disabilities. Federal employees and members of the public with disabilities must be afforded access to and use of information and data comparable to that of Federal employees and members of the public without disabilities.
All products, platforms and services delivered as part of this work statement that, by definition, are deemed ICT shall conform to the revised regulatory implementation of Section 508 Standards, which are located at 36 C.F.R. § 1194.1 & Appendixes A, C & D, and available at https://www.ecfr.gov/cgi-bin/text-idx?SID=e1c6735e25593339a9db63534259d8ec&mc=true&node=pt36.3.1194&rgn=div5. In the revised regulation, ICT replaced the term electronic and information technology (EIT) used in the original 508 standards. ICT includes IT and other equipment.
Exceptions for this work statement have been determined by DHS and only the exceptions described herein may be applied. Any request for additional exceptions shall be sent to the Contracting Officer and a determination will be made according to DHS Directive 139-05, Office of Accessible Systems and Technology, dated November 12, 2018 and DHS Instruction 139-05-001, Managing the Accessible Systems and Technology Program, dated November 20, 2018, or any successor publication.
5.0 GOVERNMENT FURNISHED RESOURCES
The Government will not furnish any resources to the Contractor in support of this contract.
6.0 CONTRACTOR FURNISHED PROPERTY
The Contractor must furnish all facilities, materials, equipment and services necessary to fulfill the requirements of this contract, except for the Government Furnished Resources specified in SOW 2.0 and SOW 5.0.
7.0 GOVERNMENT ACCEPTANCE PERIOD
The COR will review deliverables prior to acceptance and provide the contractor with an e-mail that provides documented reasons for non-acceptance within ten (10) business days. If the deliverable is acceptable, the COR will send an e-mail to the Contractor notifying it that the deliverable has been accepted within 10 business days
7.1 The COR will have the right to reject or require correction of any deficiencies found in the deliverables that are contrary to the information contained in the Contractor’s accepted proposal. In the event of a rejected deliverable, the Contractor will be notified in writing by the COR of the specific reasons for rejection within 10 business days. The Contractor may have an opportunity to correct the rejected deliverable and return it per delivery instructions within 10 business days.
7.2 The COR will have 10 business days to review deliverables and make comments. The Contractor must have 10 business days to make corrections and redeliver.
7.3 All other review times and schedules for deliverables must be agreed upon by the parties based on the final approved Project Plan. The Contractor must be responsible for timely delivery to Government personnel in the agreed upon review chain, at each stage of the review. The Contractor must work with personnel reviewing the deliverables to assure that the established schedule is maintained.
8.0 DELIVERABLES
| ITEM |
| SOW REFERENCE |
| DELIVERABLE / EVENT |
| DUE BY |
DISTRIBUTION
| 1 |
| 4.6 |
| Post Award Conference |
| 10 working days after award |
N/A
| 2 |
| 4.6, 4.7 |
| Draft Contractor Project Plan |
| 10 working days after award |
| COR |
| 3 |
| 4.7 |
| Final Contractor Project Plan |
| 15 working days after award |
| COR |
| 4 |
| 4.9 |
| Progress Reports |
| Quarterly |
| COR |
| 5 |
| 2.1 |
| FREDYN and Associated Software Releases / Updates |
| As developed |
COR
| 6 |
| 2.1 |
| Access to CRNAV Microsoft Sharepoint site. |
| 10 working days after award |
COR
| 7 |
| 2.1, 4.11 |
| CRNAV Annual Summary Report |
| 48 weeks after Contract Award |
COR
| 8 |
| 2.1, 4.11 |
| CRNAV Working Group Reports, Minutes of Meetings, Presentations, and other related documents |
| 14 calendar days after meetings |
COR
| 9 |
| 2.1, 4.11 |
| CRNAV Software Documentation (user manuals) |
| 14 calendar days after meetings |
COR
| 10 |
| 2.2 |
| CRS Associated Software Releases / Updates |
| As developed |
COR
| 11 |
| 2.2 |
| Access to CRS Microsoft Sharepoint site. |
| 10 working days after award |
COR
| 12 |
| 2.2, 4.11 |
| CRS Working Group Reports, Minutes of Meetings, Presentations, Measurements, and other related documents |
| 14 calendar days after meetings |
COR
| 13 |
| 2.2, 4.11 |
| CRS Software Documentation (user manuals) |
| 2 weeks after software updates |
COR
| 14 |
| 2.2, 4.11 |
| CRS Open / Annual General Meeting Minutes |
| 48 weeks after Contract Award |
COR
8.1 METHOD AND PLACE OF DELIVERY-DESTINATION
8.1.1 All deliverables must be delivered by one of the following two methods:
(a) Electronic mail to:
Jeffrey.A.Bloomer@USCG.MIL Michael.M.Nader@USCG.MIL
(b) FOB destination by tracebale means on a Digital Versatile Disc (DVD) to:
| USCG SFLC ESD |
| 707 E. Ordnance Rd. |
Baltimore, MD 21226 ATTN: Jeffrey Bloomer
PAGE 8/6