SOW_CRG_MPU5.pdf
PDF 224 KB Posted
- Attached to
- Smart Handheld Radios-JBMDL Federal contract opportunity
- Solicitation number
- F3A1AM3202AC01
About this file
This statement of work outlines requirements for smart handheld radios to support contingency response group operations at Joint Base McGuire-Dix-Lakehurst. The Air Force seeks to procure Persistent Systems Man Portable Unit 5 radios and peripherals to provide a self-healing mesh network for voice and data communications. The radios must integrate with Android Team Awareness Kit systems, support radio over IP, allow extended range communication, and offer spectrum diversity. The 621st and 821st Contingency Response Groups will be responsible for maintaining accountability and operations of the equipment once delivered within 120 days of award. The contractor must provide standard commercial warranties and support for any supplied components. This procurement corresponds to solicitation number F3A1AM3202AC01 for smart handheld radios to support operations at Joint Base McGuire-Dix-Lakehurst.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sole source pre-solicitation synopsis.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work for FY23
CRG – MPU5
Joint Base McGuire‐Dix‐Lakehurst
1. General The FY23 USAF Expeditionary Center (EC) Campaign Plan charges Contingency Response (CR) forces to be ready to operate in the Tier-3 threat environment by 2024. In order to operate in a contested environment, enable Mobility Air Force Agile Combat Employment, and address critical capability gaps listed in the Air Mobility Command (AMC)’s Rapid Global Mobility Capability Gaps Memorandum, AMC must make immediate investments in communications solutions for CR forces. As “first-in” forces providing the Open the Airbase Force Element, CR require reliable, redundant systems that ensure Beyond Line of Sight (BLOS) communications with command-and-control (C2) elements and secure line of sight (LOS) communications between teams on the ground. Current systems are outdated, no longer function reliably, and lack modern technological advances required to create a meshed network between nodes. While long-term enterprise replacements are being analyzed, the 621st and 821st Contingency Response Groups (CRGs) identified interim solutions to bridge acute capability gaps while advancing command level initiatives. These solutions have been socialized with AMC/A6, AMC/A34, AMC/CIG, and 618 AOC.
2. Objectives
The L3Harris multi-channel UHF/VHF handheld radio, AN/PRC-152A, currently possessed by CRG for internal ground communications have reached end of life and some maintenance/repair actions are no longer supported through the manufacturer. Additionally, the radios lack the Internet Protocol capability required to create a self-healing mesh network for teams to share voice and data transmissions on the ground. The CR requires Smart Handheld Radios that meets or exceeds the specs and peripherals of the Persistent Systems Man Portable Unit 5 (MPU%) capabilities that works seamlessly with the Android Team Awareness Kit (ATAK) systems, provides a self-healing mesh voice and data network on the ground and backbone utilizing the multiple-input, multiple-output technology aligning with other DoD efforts that allows extended range and increased bandwidth. The smart radio must have Radio over Internet Protocol (RoIP) capability to integrate with legacy radios, have not node limitation with smart routing capability to prevent communications degradation, have ability to communicate BLOS using cloud relay, and offers radio spectrum diversity to allow flexibility.
3. Scope of Work
This equipment will be used for the 621st Contingency Response Wing (621 CRW) operations, on base and various locations for deployments, trainings, and exercises. The vendor will provide the equipment to improve commercial Satellite Communication, Military Small Communications Package, and LOS communications capabilities. The 621 CRW will be responsible for maintaining the accountability for this equipment.
4. Personnel The vendor will provide delivery of this item. The maintenance, accountability, and operations of this equipment will be the responsibility of the CRG Combined Communications Work Center.
a. 621 CRG Point of Contact:
TSgt Anthony Mattera Anthony.mattera.1@us.af.mil 3403 Neely Road, Bldg 3403 Joint Base McGuire-Dix-Lakehurst, NJ 08641
b. 821 CRG Point of Contact:
MSgt Tony Payne Tony.payne.1@us.af.mil 109 Ragsdale Street, Bldg 925 Travis AFB, CA 94535
5. Equipment Requirements and peripheral shall meet or exceed the specs of:
a. Persistent Systems MPU5 and peripherals:
MPU5 Chassis – WR-5100 High Power S Band RF Module – RF-2150 S Band Dipole Spring Base antenna – ANT-2003 Antenna Hpol S Band dismounted – ANT-2040 MPU5-D to IP67 Ether-F – CBL-DATA-2013 MPU5-A to USB-Ethernet Converter – CBL-DATA-2019 MPU5 22 pin to 6 pin U-329//u RoIP 36” – CBL-AUD-0001 Gen 5 Lithium-Ion Twist Lock Battery – BAT-06 Universal Soldier Portable Charger Unit – BAT-05 Battery Adapter Plate – BAT-07 Ruggedized Display Console System – WR-DISP-SYS-01 Dual PTT System – WR-PTT-SYS-03 Stereo headset with Dual PTT connector – ACC-AUD-075 GPS Antenna – ANT-4001 S Band Integrated Sector Antenna – WR-INT-ANT-SYS-01 Battery Eliminator Cable – CBL-PWR-0001 USB out + USB (TOC Display CBL Kit) – CBL-DATA-3003 MPU5 Battery Eliminator to cigarette lighter – CBL-PWR-0003 MPU5 22 pin to USB Compatible with all ports – CBL-DATA-2003 TOC Speaker Setup – WR-SPKR-SYS-01 Tier 2 Cloud Relay Hub Solution Configuration File – Cloud Relay Tier 2
6. Deliverables Delivery shall occur within 120 days of award. Items will be verified upon delivery.
7. Warranty
The contractor shall provide any Original Equipment Manufacturer (OEM) standard commercial warranty applicable to the products being purchased at no additional cost to the Government.
• Prior to project acceptance, the contractor shall provide the customer with all manufacturer warranties as needed for any component incorporated into this project such as equipment manuals, literature, CDs and DVDs and other documentation on all equipment.
• Prior to project acceptance, the contractor shall provide written procedures, points of contact within company, and required information for all warranty services prior to project acceptance. This information shall include written confirmation of the warranty period, phone numbers and contact information/procedures for technical support, troubleshooting assistance, and replacement of faulty equipment.
8. GENERAL INFORMATION: ITEMS MUST BE BRAND NEW. REFURBISHED ITEMS ARE
NOT AUTHORIZED.
JANIE J. RAMSEY, Capt, USAF Requirements & Resource Flight Commander
| 2023-07-13T16:53:19-0400 | |
| RAMSEY.JANIE.JUNGSUN.1285738535 |
File details come from the government source that posted it. Updated .