1. GENERAL SCOPE OF WORK: The United States Holocaust Memorial Museum (USHMM) Division of Operations, Office of Facility Services has identified a requirement for award of up to three (3), Firm Fixed Price (FFP) Indefinite Delivery/Indefinite Quantity (IDIQ), Multiple Award Construction Contracts (MACC) to support the USHMM and its associated buildings.

1.1. The proposed contract is for a full range of General Construction support. The scope of work includes, but is not limited to all labor, materials, equipment, access and supervision necessary to accomplish various repairs, alterations, restoration/modernization, demolition work, and may include civil, structural, mechanical, electrical, fire protection, finish carpentry, painting and communications systems work. Work will be accomplished through the issue of Task Orders (T.O.) for all constructed assets on the USHMM campus.

2. PERIOD OF PERFORMANCE: The contract will be for one (1) base year and have options to extend for four (4) one-year option periods if the museum chooses to do so. The total five year (base and four one-year options) estimated construction cost for all contracts is not to exceed $5,000,000.00 for the life of the contract. The total annual amount shall not exceed $1,000,000.00.

3. BACKGROUND: The USHMM main campus is located south of Independence Ave, SW, between 14th and 15th streets, Southwest Washington D.C. There are two buildings: the Ross Administrative Center (RAC) building and the Museum building which include all driveways, plaza areas and vegetation areas. The seven-story 258,000 square foot Museum was opened in 1993. The RAC is a historically significant building with four stories and approximately 46,000 square feet of administration space and a public café. There are approximately 35,000 square feet of paved and landscaped area. The USHMM also has a collections facility located in Bowie, MD which is approximately 103,000 square feet of administration space, conservation labs, general storage, and artifact storage space.

4. OBJECTIVES: Basic services shall be to provide the USHMM with construction services that allow for the completion of individual TOs as described in this Statement of Work.

5. SELECTION CRITERIA FOR AWARD:

Factor 1 – Professional Qualifications

Factor 2 – Specialized Experience

Factor 3 – Past Performance

Factor 4 – Location

Factor 5 – Management Plan

Factor 6 – Sample Project

5.1. PROFESSIONAL QUALIFICATIONS: The evaluation of the contractor's personnel will consider education, training and relevant experience as well as longevity of the working relationship with the contracting firm.

5.1.1.The contractor must provide personnel with specialized and technical competence in the areas of renovation, alteration, repair and rehabilitation of existing high-visibility and/or historic facilities.

5.1.2.The contractor must demonstrate experience and knowledge of overseeing multi-discipline construction projects through all phases from proposal to close out.

5.1.3.The contractor must provide the professional experience of lead craftsmen for the following disciplines: Electrical, Mechanical, Plumbing, Painting, Carpentry, Safety, and Quality Control. Personnel may work directly with the contracting firm or be a subcontractor to the firm.

5.2. SPECIALIZED EXPERIENCE: The contractor shall submit a minimum of three (3) up to a maximum of (5) relevant construction projects, showing cost and duration, as the PRIME CONTRACTOR that best demonstrates specialized experience based on the following criteria:

5.2.1.The contractor must demonstrate their experience in renovation, alteration, repair and rehabilitation of architecturally and historically significant structures.

5.2.2.The contractor must demonstrate expertise with high visibility, institutional projects with complex programmatic requirements.

5.2.3.The contractor must demonstrate experience working in and around a Metro area, where stringent security, limited access, staging and other mobility issues are frequent.

5.2.4.The contractor shall submit percentage of work completed “in-house” on all projects submitted.

5.3. PAST PERFORMANCE: The contractor shall submit a minimum of three (3) up to a maximum of (5) relevant construction projects, showing cost and duration, as the PRIME CONTRACTOR that best demonstrates past performance based on the following criteria:

5.3.1.Past performance on contracts with government agencies and private industry in terms of cost, quality of work, and compliance with construction schedules.

5.3.2.Past performance working under an IDIQ, with multiple TOs.

5.3.3.Past Performance of interior/exterior alteration or renovation of facilities, and/or repair projects that include repairs to multiple building systems and infrastructures.

5.3.4.Past Performance demonstrating the ability to perform multiple projects simultaneously.

5.3.5.Past Performance with Design Build TOs or projects.

5.3.6.For each project submitted the contractor shall submit the primary POC’s contact information for reference check. Or the contractor shall submit Past Performance Reference check (Attachment 8.1) for each project included.

5.4. LOCATION:

5.4.1.Geographic location of company to ensure timely response to unanticipated requests for on-site support.

5.4.2.Knowledge of regulatory requirements that would affect projects.

5.5. MANAGEMENT PLAN: A proposed management plan, which shall not exceed three (3) pages, shall include the following items:

5.5.1.Organization chart

5.5.2.Management approach to multiple concurrent projects

5.5.3.Team organization

5.5.4.Quality Control procedures

5.5.5.Cost control

5.5.6.Coordination of in-house disciplines and subcontracted discipline

5.6. SAMPLE PROJECT:

5.6.1.After the evaluation of Factors 1 – 5 the successful contractors will then be further evaluated on a sample project. Only the contractors that have made it through the evaluation Factors 1 – 5 will be given a chance to submit a bid on the sample project.

5.6.2.This project will not be awarded and will only be used for evaluation purposes.

5.6.3.The contractors shall bid the project off the documents provided as it stands listing all assumptions and exclusions.

5.6.4.The following are the factors for evaluation for the preliminary project:

Factor 1 – Cost

Factor 2 - Clarity, format and organization of proposal

6. GENERAL INFORMATION:

6.1. Up to three (3) contractors will be awarded contracts under the IDIQ, and will then compete for TOs based on cost, work plan, and timeframe for completion.

6.2. The Contractor shall visit the site to acquaint themselves with all conditions of the property prior to bidding on the work of a task order, and shall be responsible for verifying all quantities and field conditions.

6.3. The Contractor shall be escorted at all times while on site, either by a Museum staff member, a member of the Museum’s Security force, or a badged employee of the Contractor.

The Contractor and all employees shall be subject to the Museum’s standard security inspection, as are all deliveries.

6.4. Task orders shall vary in size and dollar amounts. T.O.s will involve, but will not be limited to, carpentry; roofing; interior renovation; carpet, window, and door installation; electrical;

plumbing; painting and drywall; demolition; masonry; fire protection construction;

telecommunications and HVAC.

6.5. Prior to the issuance of the first T.O.s, the contractor shall provide the COR with a telephone number at which the contractor or his designated and authorized representative may be contacted at any time during regular working hours and an emergency number at which the contractor may be contacted in situations requiring immediate attention. The above mentioned representative must have full power and authority to act on behalf of the contractor

6.6. The Contractor’s Supervisors or Project Managers may be badged and act as an escort.

Average time to acquire a badge is 30 days.

6.7. All trash, dirt and/or debris generated as part of the work of this contract shall be disposed off Museum property. The contractor is responsible for providing their own trash containers.

6.8. Any recycled material shall be documented and submitted to the COR.

6.9. Operating hours for the Museum’s facilities are as follows:

6.9.1. The Museum:

6.9.1.1. Open to the public at 10:00 a.m. until either 5:30 or 6:30 p.m. daily, depending upon the time of year.

6.9.1.2. Staff areas are occupied 7:00 a.m. until 7:00 p.m.

6.9.2. Ross Administrative Center:

6.9.2.1. Museum Cafe is open 8:30 a.m. until either 4:30 or 5:30 p.m. daily, depending upon the time of year.

6.9.2.2. Staff areas are occupied 7:00 a.m. until 7:00 p.m., Monday through Friday, excluding legal holidays.

6.9.3. Portals: 7:00 a.m. until 7:00 p.m., Monday through Friday, excluding legal holidays

6.9.4. The Shapell Center: 7:00 a.m. until 7:00 p.m., Monday through Friday, excluding legal holidays.

6.9.5. Museum facilities are closed on Christmas day and Yom Kippur.

6.9.6. All on-site work to be performed as part of this contract shall be performed during off duty hours, unless approved otherwise by the COR in advance.

6.9.7. The work shall neither disrupt nor interfere with any special events, which are listed in the Museum’s Calendar of Events. The Contracting Officer’s Representative (COR) shall make this calendar available to the Contractor. The final schedule shall be coordinated with and approved by the COR.

6.9.8. If work is performed during normal operating hours, all loud work and material or trash movement in and through the Museum must be accomplished before 9:00 a.m.

6.10. Site Access.

6.10.1. Parking is limited and not guaranteed. The contractor may request parking as part of their weekly schedule, and the COR will notify them if parking has been made available.

The request shall include vehicle make, model and driver for each vehicle needing a space.

6.10.2. Loading Dock. If needed, the contractor may temporarily park in the loading dock to off load material and tools. The contractor shall notify the COR with as much time as possible. Access to the loading dock is not guaranteed.

6.10.3. Facilities. The contractor will be subject to security screenings each time they enter the museum or Ross Administrative Center (RAC).

6.10.4. Deliveries. The contractor shall notify the COR at least 7 days prior to any deliveries being made directly to the Museum on their behalf. Below is the address for deliveries.

Please make sure that the COR and Contractor’s name are on all delivery packages, as follows:

ATTN: [COR] via [Company Name] United States Holocaust Memorial Museum 100 Raoul Wallenberg Place, SW Washington, DC 20024-2126

6.11. Safety:

6.11.1. The Contractor shall comply with all applicable federal, state and local safety, health, and environmental regulations, including the standards set by the Occupational Safety & Health Administration (OSHA).

6.11.2. The Contractor shall, at no additional cost to the USHMM, obtain all licenses and permits required for the performance of specialty or hazardous work in order to comply with all applicable Federal, State and local laws. Evidence of such permits and licenses shall be provided to the USHMM upon request.

6.11.3. The work on this contract shall not obstruct access to or egress from the Museum at any time. Details of all staging and access to the work site by the Contractor shall be coordinated with and approved by the COR prior to commencing work.

6.11.4. The Contractor shall at all times keep work areas including storage areas free from accumulations of waste material or rubbish.

6.11.5. Any hazardous waste must be removed by qualified personnel and be documented and submitted to the COR.

6.12. Payment Instructions:

6.12.1. The Contractor may submit invoices for work completed on a monthly basis, reflecting the percentage of work completed to that date. The COR will need to review all invoices to validate the level of billing prior to payment.

6.12.2. Submissions for payment:

6.12.2.1. Send all proposed invoices electronically, or by mail if preferred, to the COR for review and approval.

6.12.2.2. Invoices must contain the following items in order to begin processing:

6.12.2.2.1. Name and address of the contractor.

6.12.2.2.2. Invoice date and invoice number. (Contractors should date invoices as close as possible to the date of mailing or transmission.)

6.12.2.2.3. Period of performance (date(s) of service) for which supplies or services are being invoiced.

6.12.2.2.4. Contract number or other authorization for supplies delivered or services performed (including order number and line item number).

6.12.2.2.5. Description, quantity, unit of measure, unit price, and extended price of supplies delivered or services performed.

6.12.2.2.6. Shipping and payment terms (e.g., shipment number and date of shipment, discount for prompt payment terms).

6.12.2.2.7. Name (where practicable), title, phone number, and mailing address of person to notify in the event of a defective invoice.

6.12.2.2.8. Any other information or documentation required by the contract (e.g., evidence of shipment).

6.12.2.3. The COR will notify the contractor within seven (7) days if the submitted invoice is approved or if a resubmission is required.

6.12.2.4. Once given notice of approval, the contractor shall submit the approved invoice to Accounts Payable electronically at accountspayable@ushmm.org or by mail at:

ATTN: Accounts Payable

United States Holocaust Memorial Museum

100 Raoul Wallenberg Place, SW

Washington, DC 20024-2126

6.13. Quality Surveillance:

6.13.1. USHMM will conduct periodic, random inspections while the work is in progress to ensure the Contractor is in compliance with project specifications.

6.13.2. The COR shall notify the Contractor immediately of any defects and or discrepancies in workmanship or materials noted during the inspections. In addition, the inspector shall notify the Contracting Officer in writing of the problem. The Contractor shall correct these items at no additional cost to the USHMM.

6.13.3. Contractor shall install all items and perform all work in strict accordance to project requirements, manufacturer’s instructions, industry standards, and in accordance with all mailto:accountspayable@ushmm.org

National, State, and local codes.

6.13.4. The Contractor shall perform their own Quality Assurance, in addition to the USHMM inspection, to ensure that all work is done in compliance with these requirements and to a standard of quality commensurate with that shown in the rest of the Museum.

6.13.5. All materials, unless otherwise indicated, shall be equal to those found in the existing adjacent portion of the Museum.

6.13.6. The Contractor shall at all times protect and preserve all USHMM materials, supplies, equipment, and property. The Contractor shall be responsible for all repairs to bring damaged equipment or property back to their original condition at no cost to the Museum.

6.14. Warranties:

6.14.1. The contractor shall submit all warranty information for products and equipment installed. The warranty submittal shall contain the following information regarding each product or piece of equipment:

6.14.1.1. Manufacturer information: warranty acceptance and duration, contact information, project/job specific number, warranty maintenance guidelines.

6.15. Contractor Reporting Requirements:

6.15.1. The Contractor shall submit a construction schedule no later than 14 calendar days after receipt of the notice to proceed for each task order unless there are time limitations. The schedule shall be subject to approval by the COR. The Contractor shall update the schedule weekly indicating progress made to date.

6.15.2. The Contractor shall notify the COR at least 10 calendar days prior to the start of work on site of their intention to start work.

6.15.2.1. All submittals necessary to start work shall be submitted and approved prior to starting work on site.

6.15.3. The Contractor shall submit a weekly schedule on Wednesday for the work week beginning the following Monday. The COR shall use this schedule to coordinate escorts with Security, parking requests and USHMM events.

6.15.4. Progress meetings shall be held as needed, but not less than weekly once construction has begun. The updated construction schedule shall be delivered by the Contractor at or prior to this meeting.

6.15.5. The contractor shall prepare and furnish monthly reports on all open T.O.s. The format and content of the report will be approved by the Contracting Officer. A copy of each report shall be provided to the COR. Information contained in the status report shall include the T.O. number, title of T.O., issue date, award date, start date, dollar amount, required completion date, actual completion date, schedule of progress and actual progress percentage, and comments.

6.16. Task Order Issuance:

6.16.1. The USHMM Contracting Office will contact each contractor selected under the IDIQ and provide them with a Scope of Work and Cover Sheet. The Scope of Work will contain task order specific requirements and all referenced construction documents. The Cover Sheet will contain specific information on site visits and proposal submission.

6.16.2. Proposal Submission.

6.16.2.1. Cost: detailed cost breakdown showing number of hours and applicable rates for each utilized labor category and other direct and indirect costs.

6.16.2.2. Work Plan: a detailed description of how the work is to be accomplished.

6.16.2.3. Timeframe for completion: an estimated project duration.

6.16.3. The Museum shall not pay any proposal preparation costs, nor make reimbursements for any of the costs associated with responses to these requests, nor is the Museum obligated to procure or contract for the services.

6.17. Task Order Closeout:

6.17.1. Substantial Completion. Before requesting a review for Substantial Completion, the contractor shall complete the following:

6.17.2. Prepare a list of items to be completed and corrected (punch list) and the reasons why the Work is not complete.

6.17.3. Prepare and submit all closeout submittals including, but not limited to, maintenance service agreements and warranty documentation.

6.17.4. Complete final cleaning, including touch up painting.

6.17.5. Submit a written request for review for Substantial Completion. On receipt of request.

COR will notify the Contracting Officer of Substantial Completion after review or will notify the Contractor of items that must be completed or corrected before Substantial Completion will be issued.

6.17.6. Final Completion. The date of Final Completion is when COR determines that the work is acceptable under the Contract Documents and the contract has been fully performed.

Before requesting final review for determining the date of Final Completion, the contractor shall complete the following:

6.17.7. Submit a copy of the punch list, endorsed and dated by the contractor stating that each item has been completed or otherwise resolved for acceptance.

6.17.8. Provide final cleaning. A thorough cleaning of all construction areas shall be completed prior to turn over of construction area to USHMM.

7. PROPOSAL SUBMISSION INSTRUCTIONS:

7.1. In response to this solicitation, the complete proposal shall include a cover sheet referencing project name and solicitation number, brief company overview, limited to no more than one (1) page, followed by the specific factors found in the selection criteria for award.

7.2. All pages shall be numbered and sections appropriately tabbed according to each award factor.

7.3. The contract’s proposal must include all data and information specified and must be submitted in accordance with these instructions. Non-conformance may result in an unfavorable proposal evaluation.

8. ATTACHMENTS:

8.1. Past Performance Reference Check

8.2. Sample Evaluation Project

8.3. List of Task Orders

LIST OF PAST 24 MONTH TASK ORDER AWARDS:

Donor Recognition Glass Panel and Lighting Installation

$82,852

Control Center Video Wall Installation $11,550 Rubinstein Theater Lighting Infrastructure Upgrades $56,057 Cathodic Protection Investigation Support $18,518 Meyerhoff Theater Lobby Emergency Pipe Replace. $43,198 Meyerhoff Theater Lobby Handrail Replacement $13,507 Fifth Floor Personnel Lockers Replacement $15,400 B65 Door Installation $20,411 Kiosk SlatWall Installation $8,538 Wellness Room Kitchenette Installation $37,934 Exit Door Emergency Replacement $14,078 Third Floor Men’s Room Door and Tile Repair $6,235 Laboratory Sink Replacement $10,500 14th St. Skylight Replacement $25,365 Exterior Limestone Weep Installation $59,323 Rm. 315 Water Damage Repair and Window

Recaulking $61,123

HOR Window Recaulking and Roof Repair $124,225 Blue Skies Exhibit Prep $25,150 Cafe Column Wrap and Ceiling Replacement $34,095 Engineer Water Damage Repair and Office

Renovations $34,408

B65 Emergency Water Damage Repair $20,762 Donor Panel Installation $12,500

File details come from the government source that posted it. Updated .