Past Performance Reference Check.pdf
PDF 423 KB Posted
- Attached to
- United States Holocaust Museum Construction IDIQ
- Solicitation number
- RFQ-954767-20-0611
- Issued by
-
United States Holocaust Memorial Museum
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PAST PERFORMANCE REFERENCE CHECK
I. YOU ARE BEING CONTACTED FOR A REFERENCE REGARDING THE PERFORMANCE OF
Contractor:
City and State:
Type of Contract:
Please fill out items II – IV.
II. NAME OF COMPANY/ GOVERNMENT AGENCY PROVIDING REFERENCE:
Name and Title of Individual Providing Reference Responses:
Signature: __________________________________________________Date: ______________________
Phone Number: ________________________Email:___________________________________________
Does the information in Section I above accurately describe your project and or contract, if not, please explain.
III. PAST PERFORMANCE QUESTIONNAIRE
Use the following adjective ratings and definitions in your evaluation of the Key Personnel’s performance.
RATING
DEFINITION
NOTE
(E) Exceptional Performance meets requirements and exceeds many to the Government/Owner’s benefit. The performance being assessed was accomplished with few minor problems for which corrective actions taken by the Key Personnel was highly effective.
An Exceptional rating is appropriate when the Key Personnel successfully performed multiple significant events that were of benefit to the Government/Owner. A singular benefit, however, could be of such magnitude that it alone constitutes an
Exceptional rating. Also, there should have been NO significant weaknesses identified.
(VG) Very Good Performance meets requirements and exceeds some to the Government’s/Owner’s benefit. The performance assessed was accomplished with some minor problems for which corrective actions taken by the Key Personnel were effective.
A Very Good rating is appropriate when the Key Personnel successfully performed a significant event that was a benefit to the Government/Owner. There should have been NO significant weaknesses identified.
(S) Satisfactory Performance meets minimum requirements. The performance had some minor problems for which corrective actions taken by the Key Personnel appear or were satisfactory.
A Satisfactory rating is appropriate when there were only minor problems, or major problems that the Key Personnel recovered from without impact to the Government/Owner. There should have been NO significant weaknesses identified.
(L) Less than Satisfactory Performance does not meet some or most requirements. The performance being assessed reflects a serious problem for which the Key Personnel did not identify corrective actions.
The Key Personnel's proposed actions appear only marginally effective or were not fully implemented.
A Less than Satisfactory rating is appropriate when multiple significant events occurred that the Key Personnel had trouble overcoming and which impacted the Government/Owner. A singular problem, however, could be of such serious magnitude that it alone constitutes a less than satisfactory rating.
(N) Not Applicable No information or did not apply to your work with the Key Personnel.
Rating will be neither positive nor negative.
Past Performance Reference
Instructions: Please select the adjective rating that best reflects your evaluation of the Key Personnel’s performance.
1. QUALITY:
E VG S L N
(a) Quality of technical data/report preparation efforts including but not limited to schedule, submittals, shop drawings, manuals, as-builts.
(b) Ability to meet quality standards specified for technical performance, including but not limited to, materials, workmanship, protection of property, clean up.
(c) Timeliness/effectiveness of contract problem resolution without extensive customer guidance.
(d) Adequacy/effectiveness of quality control program and adherence to quality assurance requirements (without adverse effect on performance).
(e) What could have improved your ratings for Quality?
2. SCHEDULE/TIMELINESS OF PERFORMANCE:
(a) Compliance with delivery/completion schedules including any significant intermediate milestones. (If liquidated damages were assessed or the schedule was not met, please address below.)
(b) Rate the Key Personnel’s use of available resources to accomplish tasks identified in the contract.
(c) Rate the Key Personnel’s time commitment to the project.
(d) What could have improved your ratings for Schedule/Timeliness of Performance?
3. CUSTOMER SATISFACTION:
(a) Contractor was reasonable and cooperative in dealing with your staff (including the ability to successfully resolve disagreements/disputes; responsiveness to administrative reports, businesslike and communication).
(b) To what extent was the contractor cooperative, businesslike, and concerned with the interests of the customer?
(c) Timeliness of communications with you, such as keeping you informed of the project status, advising you of issues or concerns, etc.
(d) Overall customer satisfaction.
(e) What could have improved your ratings for Customer Satisfaction?
4. MANAGEMENT/ PERSONNEL/LABOR
(a) Effectiveness of on-site management, including management of subcontractors, suppliers, materials, and/or labor force?
(b) Ability to hire, apply, and retain a qualified workforce to this effort and compliance with applicable labor laws.
(c) Knowledge/expertise demonstrated by contractor personnel.
(d) Ability to simultaneously manage work items with multiple disciplines and trades.
(e) Ability to assimilate and incorporate changes in requirements and/or priority, including planning, execution and response to changes.
(f) Effectiveness of overall project management (or design), including ability to effectively lead, manage and control the program.
(g) What could have improved your ratings for Management/Personnel/Labor?
5. COST/FINANCIAL MANAGEMENT
(a) Ability to meet the terms and conditions within the contractually agreed price(s)?
(b) Contractor proposed innovative alternative methods/processes that reduced cost, improved maintainability or other factors that benefited the client.
(c) If this is/was a Government contract, has/was this contract been partially or completely terminated for default or convenience or are there any pending terminations? (Indicate if show cause or cure notices were issued, or any default action in comment section below.)
Yes _____ No _____
(d) Were any claims or mechanics liens filed in connection with this project? (If yes, please explain in the comment section below.)
(e) Have there been any indications that the contractor has had any financial problems? (If yes, please explain in the comment section below.)
(f) What could have improved your ratings for Cost/Financial Management?
IV. ADDITIONAL COMMENTS
Submit the completed form to via email, send it akubiak@ushmm.org.
6. SAFETY/SECURITY/ENVIRONMENTAL
(a) To what extent was the Key Personnel able to maintain an environment of safety, adhere to its approved safety plan, and respond to safety issues? (Includes: following the users rules, regulations, and requirements regarding housekeeping, safety, correction of noted deficiencies, environmental compliance, etc.).
(b) Key Personnel complied with all security requirements for the project and personnel security requirements.
(c) For the person named above and for his/her employer, how satisfied were you with their ability to comply with environmental laws, regulations and policies?
(d) Were there any violations of law or regulations (specifically, but not limited to, environmental or safety violations) with respect to their performance, or were there any other serious performance issues? (If yes, please explain in the comment section below.)
(e) What could have improved your ratings for Safety/Security?
7. GENERAL
(a) Ability to successfully respond to emergency situations and resolve contractual and project issues.
(b) Compliance with contractual terms/provisions (If there were specific issues, please explain in the comments sections below
(c) In summary, provide an overall rating for the work performed by this contractor.
8. SUMMARY
Would you hire or work with this person again? (If no, please explain in the comments section below.)
| Name and Title of Individual Providing Reference Responses: |
| explain: |
| e What could have improved your ratings for Quality: |
| d What could have improved your ratings for ScheduleTimeliness of Performance: |
| e What could have improved your ratings for Customer Satisfaction: |
| g What could have improved your ratings for ManagementPersonnelLabor: |
| f What could have improved your ratings for CostFinancial Management: |
| e What could have improved your ratings for SafetySecurity: |
| NAME OF COMPANY GOVERNMENT AGENCY PROVIDING REFERENCE: |
| Date: |
| Phone: |
| Email: |
| Check Box 21: Off |
| Check Box 22: Off |
| Check Box 23: Off |
| Check Box 24: Off |
| Check Box 25: Off |
| Check Box 26: Off |
| Check Box 27: Off |
| Check Box 28: Off |
| Check Box29: Off |
| Check Box30: Off |
| Check Box31: Off |
| Check Box32: Off |
| Check Box33: Off |
| Check Box34: Off |
| Check Box35: Off |
| Check Box 36: Off |
| Check Box 37: Off |
| Check Box 38: Off |
| Check Box 39: Off |
| Check Box 40: Off |
| Check Box 41: Off |
| Check Box 43: Off |
| Check Box47: Off |
| Check Box49: Off |
| Check Box 42: Off |
| Check Box44: Off |
| Check Box46: Off |
| Check Box48: Off |
| Check Box50: Off |
| Check Box: Off |
| Check Box45: Off |
| Check Box51: Off |
| Check Box52: Off |
| Check Box53: Off |
| Check Box54: Off |
| Check Box 1: Off |
| Check Box 2: Off |
| Check Box 3: Off |
| Check Box 4: Off |
| Check Box 5: Off |
| Check Box 6: Off |
| Check Box 7: Off |
| Check Box 8: Off |
| Check Box 9: Off |
| Check Box 10: Off |
| Check Box 11: Off |
| Check Box 12: Off |
| Check Box 13: Off |
| Check Box 14: Off |
| Check Box 15: Off |
| Check Box 16: Off |
| Check Box 18: Off |
| Check Box 19: Off |
| Check Box 20: Off |
| Check Box 55: Off |
| Check Box 56: Off |
| Check Box 57: Off |
| Check Box 58: Off |
| Check Box 59: Off |
| Check Box 60: Off |
| Check Box 62: Off |
| Check Box 64: Off |
| Check Box 66: Off |
| Check Box 68: Off |
| Check Box 85: Off |
| Check Box 86: Off |
| Check Box 87: Off |
| Check Box 88: Off |
| Check Box 89: Off |
| Check Box 90: Off |
| Check Box 17: Off |
| Check Box 91: Off |
| Check Box 92: Off |
| Check Box 93: Off |
| Check Box 94: Off |
| Check Box95: Off |
| Check Box96: Off |
| Check Box97: Off |
| Check Box98: Off |
| Check Box 61: Off |
| Check Box 63: Off |
| Check Box 65: Off |
| Check Box67: Off |
| Check Box 69: Off |
| Check Box 70: Off |
| Check Box 71: Off |
| Check Box 72: Off |
| Check Box 73: Off |
| Check Box 74: Off |
| Check Box 75: Off |
| Check Box 76: Off |
| Check Box 77: Off |
| Check Box 78: Off |
| Check Box79: Off |
| Check Box 80: Off |
| Check Box 81: Off |
| Check Box 82: Off |
| Check Box 83: Off |
| Check Box 84: Off |
| Check Box99: Off |
| Check Box100: Off |
| Check Box 101: Off |
| Check Box102: Off |
| Check Box 103: Off |
| Check Box104: Off |
| Check Box 105: Off |
| Check Box 106: Off |
| Check Box 107: Off |
| Check Box 108: Off |
| Check Box 109: Off |
| Check Box110: Off |
| Check Box 111: Off |
| Check Box112: Off |
| Check Box 113: Off |
| Check Box 114: Off |
| Check Box 115: Off |
| Check Box116: Off |
| Check Box117: Off |
| Check Box 118: Off |
| Check Box 119: Off |
| Check Box120: Off |
| Check Box121: Off |
| Check Box 122: Off |
| Check Box 123: Off |
| Check Box 124: Off |
| Check Box125: Off |
| Check Box 126: Off |
| Check Box127: Off |
| Check Box 128: Off |
| Check Box 129: Off |
| Check Box 130: Off |
| Check Box131: Off |
| Check Box132: Off |
| Check Box133: Off |
| Check Box134: Off |
| Contractor Name: |
| City and State: |
| Type of Contract: |
File details come from the government source that posted it. Updated .