SOW- Construct CLC Basement Addition.doc

DOC document 60 KB Posted

Attached to
C1DA--512-22-700 EHRM Infrastructure Upgrades Design Baltimore MD (VA-22-00011638)
Solicitation number
36C77623R0010
Issued by

About this file

This document is a presolicitation notice for architectural and engineering design services. The Veterans Health Administration Program Contracting Activity Central is seeking statements of qualifications from firms to provide investigative and feasibility design, schematic design, design development, construction documents, final bid documents, specifications, calculations, cost estimates, narratives, and construction period services for infrastructure upgrades at the Baltimore Veterans Affairs Medical Center to support a new electronic health record modernization system. Key details include a 100% set-aside for service-disabled veteran-owned small businesses, a projected award date of March 31, 2023, a 365-day period of performance for design services, and optional construction period services to match the construction project period. Statements of qualifications are due by January 6, 2023 following submission requirements and evaluation criteria pertaining to professional qualifications, specialized experience, capacity, past performance, locality knowledge, and construction period experience.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CORPORAL MICHAEL J. CRESCENZ

DEPARTMENT OF VETERAN AFFAIRS MEDICAL CENTER

3461 CIVIC CENTER BLVD.

PHILADEPHIA, PA 19104

CONSTRUCT CLC BASEMENT ADDITION

PROJECT NUMBER: 642-400

WORK STATEMENT

A. DESCRIPTION OF WORK

The Architect/Engineer (A/E) firm shall provide all investigative surveys and verifications of as-built conditions required for fully developed construction documents for the renovation and upgrade of the Basement of Building #30 Community Living Center. There is 100% designed document titled “Upgrade CLC Phase 4 Project No 642-CSI-105” that would add 3500 square feet support space wing under an existing structure. The newly designed space hold administrative offices, bed charging and storage rooms.

The A/E shall review and 100% design drawings and update it to meet VA’s current requirements. The A/E should review an existing set of bid documents (including drawings and specifications) titled “Upgrade CLC Basement Phase 2 Project No 642-CSI-102” and determine the sequence of work for the basement addition.

Work in the existing space shall include the replacement of existing finishes (wall, floors, ceilings) and design of existing Sterile Processing and Distribution (SPD) processing room to bring up to current VA design guide.

A/E shall review and update design for electrical, plumbing, fire protection system and new HVAC system (i.e. new air handler, terminal boxes, and piping). Investigations shall include the existing building structure, site utility plans and any system modifications necessary to complete the new addition.

The A/E shall provide recommendations for energy reduction and water conservations and will incorporate into final design based on approved recommendations.

The A/E shall collaborate with Medical Center Infection Control staff to conduct the Infection Control Risk Assessment (ICRA) to incorporate the necessary protection as part of the construction documents.

The A/E firm will be required to collaborate with the Department of Veterans Affairs staff to determine structural, architectural, mechanical, and electrical design requirements. The firm will also attend programming meetings with Medical Center staff.

Drawings concerning the existing conditions will be provided to the A/E firm. These drawings may not accurately reflect existing as-built conditions and are to be considered a guide only. Drawings and specifications from “Upgrade CLC Basement Phase 2 Project No 642-CSI-102” is provided. 100% drawings from Upgrade CLC Phase 4 Project No 642-CSI-105” also provided. Department of Veterans Affairs design manuals for each design discipline are available on the VA Facilities Management Homepage (www.cfm.va.gov). Any major design deviations from these manuals should be discussed and approved by Facilities Management Support before the design is incorporated on the contract documents.

The survey of existing conditions is to include all areas above, below and adjacent to the work site that will be affected by the construction project. A/E firm will be required to investigate the condition and capacity of the existing utility systems, to include but not limited to the hot water heating, domestic hot water, chiller capacity in order to determine their capability to handle the renovations and building addition. Provide new HVAC systems to building addition if required.

A/E firm will be required to include the services of an independant Fire Safety Engineer for review of all drawings and specifications.

B. GENERAL

1. A/E firm shall have licensed professional architects/engineers currently registered in the state of Pennsylvania or in a state of which Pennsylvania has recognized the engineering license.

2. A/E shall be responsible to provide a complete bid package to the Contracting Officer consisting of plans, specifications, cost estimates and their related information. Drawings shall be submitted in AutoCAD, specifications in Microsoft Word and cost estimate in Microsoft Excel.

3. The contract drawings shall have a cover sheet, which shall include but not limited to the following information:

· Department of Veterans Affairs Logo

· Drawing Index

· AE Firm Name and Logo

· General Notes

4. All drawings shall be scaled.

5. Each professional discipline shall be separately designed and be sealed by the respective A/E.

6. All design work shall be coordinated by the prime A/E, who shall be responsible for all field investigation, site surveys, measurements, and engineering design calculations.

7. The A/E shall assure compliance with and design according to all local, federal, Department of Veterans Affairs, OSHA Regulations, state laws, regulations, codes, and ordinances.

8. AE shall prepare specifications using the VA master specification.

9. Plans shall be drawn using standard professional and acceptable engineering drafting skills, scales, and standards. The A/E shall be responsible to provide and show in scale plans, elevations and details required to construct this project in which the prospective bidder is clear on the proposed intent and scope of work.

10. A/E shall define and indicate on plans all “new” and “existing” conditions.

11. A/E shall show, draw, locate, define, denote, and detail all points of connection of new work to the existing.

12. A/E shall plan, define, detail, draw and show on the contract documents exact routing of any new utility proposed for this project. A/E shall as part of this project, physically inspect each new routing, provide routings and/or rerouting of existing utilities to prevent any conflicts. A/E shall design project to show exact location of new utilities on the contract plans.

C. ARCHITECTURAL

1. Provide final 1/8” scale plans for the proposed project. The 1/8” scale plans should show footprint of new addition, modifications to the existing structure necessary to maintain life safety and egress from the area. Show all rooms, room numbers as provided by VAMC, door swings, corridors, electrical closets, mechanical shafts and spaces, plumbing fixtures, all vertical circulation, including stairs. Provide all demolition plans for all items required for removal.

2. Provide 1/8" scale reflected ceiling plans for all areas.

3. Provide a separate 1/8” scale plan for fire protection measures. Include smoke barrier partitions, fire partitions, fire alarm devices, fire extinguisher cabinets and exit patterns to demonstrate compliance with the applicable codes and the fire egress pattern.

4. Provide separate ¼” scale details for toilet room, SPD area and conference room.

5. Provide a title sheet with drawing index.

6. Review and update all details necessary to fully describe the installation requirements of the architectural elements (i.e. wall types, typical framing details, typical door details, etc.).

D. PLUMBING

1. Review existing building and site utility plans and provide plans that address any necessary relocations to construct the new addition.

2. Review and update demolition plans for fixtures and piping to be removed.

3. Review and update drawings showing all locations of fixtures and related piping to be installed.

4. Review and update details necessary to fully describe the installation requirements of the plumbing system.

E. FIRE PROTECTION

1. Review and update drawings showing all changes to the existing fire sprinkler system to accommodate new floor plan layouts. Provide drawings showing all changes and new pipe installations. Show installation of new fire sprinkler system throughout the new space. Show smoke zone partitions and coordinate with sprinkler system zones.

2. All plans shall be reviewed by a fire protection engineer.

F. HVAC

1. Review and update demolition plans for all HVAC systems and devices to be removed.

2. Review and update schedules for all HVAC equipment to be incorporated on the project

3. Review and update details necessary to fully describe the installation requirements of the HVAC systems and any changes to existing.

4. Review and update data that is the basis for the design, including design calculations, parameters and factors. Reference source of all data. Provide total heating and cooling loads for the affected areas.

5. Review and update duct and piping layouts for floor plans. Show the smoke and fire protection features of the HVAC system.

6. The HVAC design should be based on direct digital control (DDC) and connected to the existing building computer system.

7. Review and update design for new air handler and associates systems for new addition.

G. ELECTRICAL

1. Review and update lighting and power plans with single drawing of any new riser or plan feeds.

2. Review and update demolition drawings for all items to be removed and relocated including single line demolition plans.

3. Review and update fire alarm system and revisions dictated by new space requirements.

4. Review and update light fixture schedule and fixture detail drawings.

5. Review and update panel schedules for all panels incorporated on the project.

6. Review and update systems drawings for nurse call, cable TV antenna.

7. A/E firm will work with VA Police and security consultant in development of plans.

H. CIVIL/SITE/LANDSCAPING

1. Provide all survey work, and site plans necessary to accommodate the new addition. New site plan shall address site security, parking and pedestrian walkways.

2. Review and update revised grading and landscaping plans.

3. Review and update site utility plan, which addresses electrical site lighting, existing duct banks, storm, and sanitary lines, impacted by the proposed new addition.

4. Site plans to be coordinated with existing CLC construction projects for Unit “C” renovations.

I. STRUCTURAL

1. Review and update foundation and framing plan necessary for the new addition.

2. New addition shall match existing building construction.

3. Review and update all necessary details for bid documents.

J. REVIEWS

A. A conceptual review (35%) will be held with selected VA Medical Center staff to ensure an understanding of the project between the VA and the selected A/E firm. At this review the AE firm shall present its’ program, methods, potential phasing plan and schedule under this work statement. This review will be scheduled after the design team has completed the on-site investigative review.

B. Formal Review: There will be two formal reviews; one each at the 70% and at the 100% design completion stages. The AE shall supply five (5) copies of drawings, five copies of specifications and five copies of cost estimates for each formal review. Review meetings will be scheduled approximately two weeks after receipt of the documents by the Medical Center. The AE shall incorporate any comments, notes or changes provided at a review meeting into the next review package. In addition, the AE shall incorporate any comments, notes or changes provided at 100% review meeting into the construction documents and cost estimate.

SEVENTY PERCENT (70%) REVIEW—WORKING DRAWINGS

A. Specifications: Submit (2) copies of marked-up VA master specifications for each section to be used in final specifications.

B. Constructions Drawings: Provide (2) copies of plans showing all necessary alternations to existing areas affected by this project. Drawings should include demolition plans, final room and floor configurations with all doors and equipment located on the subject plans. A reflected ceiling plan, HVAC plan, plumbing plan, electrical power and lighting plans should be provided for this review. A room finish schedule should be provided for each type of room in the project along with plans, elevations and details. Engineering drawings shall identify all major points of connections to existing systems.

C. Estimates: Provide (2) copies of construction cost estimates.

ONE HUNDRED (100%) PERCENT REVIEW—WORKING DRAWINGS

A. Specifications: Furnish (2) complete sets of specifications bound in final format.

B. Construction Drawings: Furnish (2) complete sets of drawings, including all elevations, details and schedules and all other plans necessary to complete the construction drawings. Review meetings will be scheduled approximately two weeks after receipt of the documents by the Medical Center. The AE shall incorporate any comments, notes or changes provided by the VAMC into the final construction drawings

C. After incorporation of 100% comments the A/E shall provide (1) complete set of Mylar reproducible drawings, one (1) single sided unbound copy and one (1) bound copy of the contract specifications after incorporation of 100% review comments.

D. Estimate: Furnish complete and detailed construction time and cost estimates.

E. The AE shall provide (2) sets of construction specifications in Microsoft Word and drawings in AutoCAD Version 2011 and a complete set of bid documents (drawings and specifications) in Adobe PDF format.

ESTIMATES

The Engineering firm will make use of the construction budget to derive the 70% and 100% construction cost estimates. All estimates shall be current as of the date of submission and escalated to the date of award as provided by the VA. Show unit quantity, unit measure, unit cost and total cost of labor and materials for each subheading, as required by “VA FORM 10-6238, Estimate Work Sheet”. All costs will include insurance, taxes and applicable subcontractors’ markup. Use wage rates that reflect current local wages. The latest Department of Labor wage survey available at the VA will be provided upon request. The A/E shall price materials and equipment at the contractors buying level. Sales tax, when applicable, will be added to the material and equipment costs. Estimates should include an appropriate percentage for overhead and profit.

K. CONSTRUCTION PERIOD SERVICES

Services during the construction phase of this project shall consist of:

A. Review of contractors’ submittals with regards to architectural, mechanical, electrical, structural and with recommendations to the VA.

B. Site visits when requested by the VA, in accordance with the Engineering contract, each will be followed with a mandatory written field report.

C. After completion of the project correct the complete set of digital files showing any changes from the original design.

L. SCHEDULE

Design Duration is 197 Calendar Days from Notice of Proceed.

Furthermore, AE Firm shall meet the following schedule, unless negotiated otherwise with VA CO and COR prior to award.

Notice to Proceed

Initial Meeting With VA COR and End User
14 Days After Notice To Proceed
Submission of 35% Documents to VA COR
40 Days After Initial Meeting
VA Comments to 35% Documents
21 Days After Reception of 30% Package
Submission of 70% Documents to VA COR
40 Days After Reception of 70% Review Comments From VA
VA Comments to 70% Documents
21 Days After Reception of 70% Package
Submission of 100% Documents to VA COR
20 Days After Reception of 100% Review Comments From VA
VA Comments to 100% Documents
21 Days After Reception of 100% Package
Submission of Stamped and Sealed Documents to VA COR
20 Days After Reception of 100% Review Comments From VA

Attachments Drawings and Specifications for “Upgrade CLC Basement Phase 2 Project No 642-CSI-102” and Drawings and Specifications for “Upgrade CLC Phase 4 Project No 642-CSI-103” Attachment 2D- CLC Phase4 Specs Volume 1 Attachment 2E- CLC Phase4 Specs Volume 2

File details come from the government source that posted it. Updated .