SOW Attachment 01 - VHA Required Div 01 Spec Sections.pdf

PDF 110 KB Posted

Attached to
C1DA--512-22-700 EHRM Infrastructure Upgrades Design Baltimore MD (VA-22-00011638)
Solicitation number
36C77623R0010
Issued by

About this file

This document is a pre-solicitation notice for architectural and engineering services to support infrastructure upgrades at the Baltimore Veterans Affairs Medical Center. The scope of work includes upgrading facility fiber, electrical outlets, IT closets, HVAC and power distribution to support a new electronic health record system. A 100% set-aside contract for service-disabled veteran-owned small businesses will be awarded for design services with an anticipated period of performance of 365 calendar days. Construction period services are optional line items that will be exercised after award of the construction project. Submissions of SF 330 qualifications packages are due by January 6, 2023 and will be evaluated based on professional qualifications, specialized experience, capacity, past performance, locality, and experience providing construction period services. The top three firms will be invited to submit written responses, with the highest rated firm receiving the solicitation to negotiate the design contract.

View the file

Other files

File Type Posted
Request for SF 330s Baltimore VAMC.docx DOCX document
36C77623R0010_3.docx DOCX document
PPQ - EHRM Baltimore VAMC.docx DOCX document
36C77623R0010_2.docx DOCX document
SOW EHRM Infrastructure Upgrades - Baltimore MD.pdf PDF
SOW Attachment 02 - VA OEHRM Site Infrastructure Requirements 2-0.pdf PDF
Attachment 2E- CLC Phase4 Specs Volume 2.pdf PDF
SOW- Construct CLC Basement Addition.doc DOC document
PPQ - Basement Philadelphia VAMC.docx DOCX document
36C77623R0010.docx DOCX document
Attachment 2D- CLC Phase4 Specs Volume I.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VHA Required Division 01 – General Requirement Specification Sections

* Note that these have been identified as required Division 01 specifications for this EHRM project. It is the responsibility of the A-E to determine if there are other specifications to include.

01 00 00 – General Requirements

01 32 16.01 - Architectural and Engineering CPM Schedules

01 32 16.15 – Project Schedules (Small Projects – Design/Bid/Build)

01 33 23 - Shop Drawings, Product Data, and Samples

01 35 26 – Safety Requirements

01 42 19 – Reference Standards

01 45 00 - Quality Control

01 45 29 – Testing Laboratory Services

01 57 19 - Temporary Environmental Controls

01 74 19 – Construction Waste Management

01 81 13 – Sustainable Construction Requirements

01 91 00 - General Commissioning Requirements

File details come from the government source that posted it. Updated .