SOW Attachment 01 - VHA Required Div 01 Spec Sections.pdf
PDF 110 KB Posted
- Solicitation number
- 36C77623R0010
About this file
This document is a pre-solicitation notice for architectural and engineering services to support infrastructure upgrades at the Baltimore Veterans Affairs Medical Center. The scope of work includes upgrading facility fiber, electrical outlets, IT closets, HVAC and power distribution to support a new electronic health record system. A 100% set-aside contract for service-disabled veteran-owned small businesses will be awarded for design services with an anticipated period of performance of 365 calendar days. Construction period services are optional line items that will be exercised after award of the construction project. Submissions of SF 330 qualifications packages are due by January 6, 2023 and will be evaluated based on professional qualifications, specialized experience, capacity, past performance, locality, and experience providing construction period services. The top three firms will be invited to submit written responses, with the highest rated firm receiving the solicitation to negotiate the design contract.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Request for SF 330s Baltimore VAMC.docx | DOCX document | |
| 36C77623R0010_3.docx | DOCX document | |
| PPQ - EHRM Baltimore VAMC.docx | DOCX document | |
| 36C77623R0010_2.docx | DOCX document | |
| SOW EHRM Infrastructure Upgrades - Baltimore MD.pdf | ||
| SOW Attachment 02 - VA OEHRM Site Infrastructure Requirements 2-0.pdf | ||
| Attachment 2E- CLC Phase4 Specs Volume 2.pdf | ||
| SOW- Construct CLC Basement Addition.doc | DOC document | |
| PPQ - Basement Philadelphia VAMC.docx | DOCX document | |
| 36C77623R0010.docx | DOCX document | |
| Attachment 2D- CLC Phase4 Specs Volume I.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VHA Required Division 01 – General Requirement Specification Sections
* Note that these have been identified as required Division 01 specifications for this EHRM project. It is the responsibility of the A-E to determine if there are other specifications to include.
01 00 00 – General Requirements
01 32 16.01 - Architectural and Engineering CPM Schedules
01 32 16.15 – Project Schedules (Small Projects – Design/Bid/Build)
01 33 23 - Shop Drawings, Product Data, and Samples
01 35 26 – Safety Requirements
01 42 19 – Reference Standards
01 45 00 - Quality Control
01 45 29 – Testing Laboratory Services
01 57 19 - Temporary Environmental Controls
01 74 19 – Construction Waste Management
01 81 13 – Sustainable Construction Requirements
01 91 00 - General Commissioning Requirements
File details come from the government source that posted it. Updated .