SOW CIP-A60JEX Explosion Proof Boom Lifts - 8-12-22.pdf

PDF 139 KB Posted

Attached to
H3WA15 60' Explosion Proof Boom Lifts. Federal contract opportunity
Solicitation number
FA813223Q0002
Issued by
Department of the Air Force Materiel Command Air Force Sustainment Center

About this file

This statement of work outlines requirements for the procurement of two explosion proof boom lifts to support corrosion control operations at Tinker Air Force Base. The lifts must be battery powered, reach a minimum of 60 feet vertically and articulate to access all aircraft areas. They require Class 1 Division 1 hazardous location certification and customized fall protection systems. Additional needs include a minimum 8 hour battery life, compressed airlines, wet location enclosures, and safety equipment. Delivery is to Building 2280 at Tinker AFB. The contractor must provide operation, maintenance, inspection, and training manuals along with a recommended spare parts list. On-site training across three shifts is also required.

The related federal contract opportunity is a solicitation from the Air Force seeking two 60-foot explosion proof boom lifts to be delivered in Fiscal Year 2023 for corrosion control operations at Tinker Air Force Base.

View the file

Other files for this federal contract opportunity

Other files attached to H3WA15 60' Explosion Proof Boom Lifts., newest first.
File Type Posted
JLG-Fall Arrest Platforms.pdf PDF
Q and A Fall-Arrest System.pdf PDF
H3WA15- 60EX Explosion Proff Boom Lifts -Item Description.pdf PDF
CSS CIP-H3WA15 60ft Exp Proof Boom Lifts.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

(SOW)

For A60JEX Explosion Proof Boom Lifts

PREPARATION DATE: 12 Aug 2022

PREPARING ORGANIZATION: 76 AMXG/MXDEC TINKER AFB, OK 73145

1.0 SCOPE

The purpose of this Statement of Work (SOW) is to define the requirements for procurement of two (2) Explosion Proof Boom Lifts which shall be used to perform corrosion control operations on all weapon systems (E-3, KC-135, B-52, B-1B, Navy E- 6, Navy C-130, AF C-130) in the 76 Aircraft Maintenance Group (76 AMXG). Two (2) explosion proof boom lifts which are certified for use in a Class I, Division I hazardous location are required to support painting of Program Depot Maintenance (PDM) and contracted workloads in Building 2122, Building 2280, and Building 3225.

The explosion proof boom lifts provide the flexibility to perform tasks on various weapon systems and safer access to reach all areas of any aircraft. The boom lifts will help resolve facility support equipment, capacity, and capability limitations that currently exist throughout the Corrosion Control facilities.

The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision and other items (e.g. Personal Protective Equipment (PPE)) necessary to perform the requirements of this SOW and contract as defined in this Statement of Work (SOW). The Contractor shall provide and use only new parts and material unless authorized by the Contracting Officer (CO).

1.1 BACKGROUND

The 76 AMXG paint facilities support corrosion control operations (painting and chemically depainting) on all PDM and contracted weapon systems. There are currently six (6) explosion proof boom lifts being shared in four (4) aircraft paint docks. The limited quantity to support multiple aircraft, frequent usage of the boom lifts, and traveling between four (4) different paint docks has caused immense wear and tear on existing equipment. The six (6) existing explosion proof boom lifts are an average of 4.5 years old and need to be replaced after 7-10 years due to increasing maintenance cost, age of the equipment, and downtime to repair which has led to additional process flowtime on aircraft. Over the past year, at least two out of the six existing boom lifts were inoperable due to on-going repairs. Two (2) new explosion proof boom lifts are required to accomplish the mission.

The explosion proof boom lifts are equipped with OSHA certified fall arrest systems which allow the employees to work outside the basket, making it safer to access difficult to reach areas. The boom lifts are also designed to allow personnel to safely access all areas of an aircraft, which would otherwise require the use of expensive maintenance stands specially designed for each weapon system. These explosion proof boom lifts are Class I, Division I safety rated for painting operations. The explosion proof boom lifts shall be exposed to large quantities of water during washing, rinsing, and chemical depainting of aircraft. The explosion proof boom lifts shall enable personnel to safely access all areas of any weapon system, regardless of the facility and available support equipment.

2.0 APPLICABLE DOCUMENTS

2.1 NON-GOVERNMENT STANDARDS AND OTHER PUBLICATIONS

2.1.1 OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION

REGULATIONS TO INCLUDE, but not limited to:

a. OSHA 29 CFR 1910

b. OSHA 29 CFR 1926

c. ANSI Z359, Fall Protection Code

2.1.2 NATIONAL FIRE PROTECTION AGENCY (NFPA) Codes and Standards to include but not limited to:

a. NFPA 70, National Electric Code (NEC)

b. NFPA70E, National Electric Safety Code

c. NFPA 101, Life Safety Code

d. NFPA 241, Standard for Safeguarding Construction, Alterations, and Demolition

Operations

e. NFPA 30, Flammable and Combustible Liquids Code

NFPA publications may be found at the following web site: http://www.nfpa.org

2.1.3 UNIFIED FACILITY CRITERIA (UFCS) TO INCLUDE, but not limited to:

a. UFC 1-200-01, General Building Requirements

b. UFC 4-211-02NF, Corrosion Control and Paint Finishing Hangars

c. UFC3-420-01, Plumbing Systems

d. UFC 3-520-01, Interior Electrical Systems

e. UFC 3-600-01, Design: Fire Protection Engineering for Facilities

UFCs may be found at the following web site: http://www.wbdg.org.

2.1.4 INTERNATIONAL CODE COUNCIL (ICC) CODE PUBLICATIONS TO

INCLUDE

a. International Building Code

b. International Fire Code

ICC publications may be found at the following web site: http://www.iccsafe.org

2.1.5 Air Force Engineering Technical Letters (ETLs) as listed at the following web site:

http://www.afcesa.af.mil/library/etl

2.1.6 National Electrical Manufacturers Association

a. NEMA 250-2014 (Enclosures for Hazardous Wet locations) http://www.nfpa.org/

3.1 SPECIFICATIONS

a. The contractor shall provide two (2) battery-powered Explosion Proof Articulating Boom Lifts that shall be used for painting of aircraft.

b. The Explosion Proof Articulating Boom Lifts shall be 3rd party certified by a globally recognized certification organization (such as…Underwriters Laboratories (UL), Factory Mutual (FM), etc…) for use in a Class I, Division I hazardous location.

c. The explosion proof boom lifts shall be equipped with customized lift fall protection systems for exiting the platform and performing tasks up to six feet from the platform. The fall protection system shall be certified by a Qualified Fall Protection Engineer documenting the designed system meets OSHA/ANSI Z359 requirements.

d. The explosion proof boom lifts shall be equipped with batteries that are capable of continuous operation for a minimum of 8 hours. A spare battery shall be provided for each boom lift to allow continuous operational use of the boom lifts between shifts.

e. The contractor shall provide a battery charger for each of the explosion proof boom lifts. The existing power sources provide 480V, 3-Phase.

f. The explosion proof boom lifts shall have a weight capacity to support a minimum two (2) persons with tools, a minimum platform weight capacity of 500lbs.

g. The explosion proof boom lifts shall be equipped with compressed airlines to support the operation of pneumatic powered tools (paint guns, sanders, HEPA vacuum equipment, etc.). The facility provides supplies compressed air at 100

PSI.

h. The boom lifts shall be used in a wet environment (chemical de-painting and washing of aircraft) and shall be designed with NEMA enclosures for wet hazardous locations.

i. The boom lifts shall be equipped with all minimum standard safety system equipment (i.e. movement alarms, emergency stops, tilt alarms, and battery charge indicators, etc...).

j. The boom lifts shall have a bump protection system designed to stop movement of the platform if the bucket were to come in contact with an object.

3.1.1 DIMENSIONS

The contractor shall provide boom lifts that are capable of reaching a minimum of 60 feet vertically and articulate to allow access to difficult to reach areas of any aircraft (tail section – verticals and horizontals). The boom lift shall also be equipped with an articulating jib that will provide access and maneuverability to all areas of the aircraft.

The jib shall have a minimum range of articulation of 120 degrees.

3.1.2 ELECTRICAL CHARACTERISTICS

The explosion proof boom lifts shall be independently certified by an industry recognized laboratory for use in a NFPA 70 (National Electric Code) Class I, Division I hazardous location in which aerospace spray painting/depainting operations shall occur.

The NFPA 70 requirements include:

Class I, Division 1

A Class I, Division 1 hazardous location is a location where ignitable concentrations of flammable gases, vapors or liquids:

• can exist under normal operating conditions;

• may exist frequently because of repair or maintenance operations or because of leakage; or

• may exist because of equipment breakdown that simultaneously causes the equipment to become a source of ignition

Equipment intended for use in a Class 1, Division 1 area must be of the explosion proof, intrinsically safe or purged/pressurized type.

Explosion proof apparatus: "Apparatus enclosed in a case that is capable of withstanding an explosion of a specified gas or vapor that may occur within it and of preventing the ignition of a specified gas or vapor surrounding the enclosure by sparks, flashes, or explosion of the gas or vapor within and that operates at such an external temperature that a surrounding flammable atmosphere will not be ignited thereby."

3.1.5 DELIVERY

The boom lifts shall be delivered to Building 2280, Tinker AFB, OK 73145.

3.1.6 MANUALS

The contractor shall furnish a minimum of four (4) hardcopies of the Operation and Maintenance manuals at delivery of each explosion proof boom lift. Electronic versions of the Operational and Maintenance manuals shall be provided in addition to the minimum four (4) hardcopies. The manuals shall provide recommended guidance and instructions on operation of the equipment and preventative and remedial maintenance.

a. Maintenance Manuals. The contractor shall supply his recommendations for an on-going maintenance program. Program recommendations shall include recommended inspection criteria, intervals and periodic and long-term maintenance operations. As built drawings shall include illustrated parts breakdown showing part numbers for replacement parts. Recommendations shall also include quantities and frequency of repair parts to be kept on hand for frequent repairs.

b. Inspection Manuals

c. Training Manuals

d. Spare Parts List – The contractor shall provide a recommended spare parts list and information on cost and sources of supply.

3.1.7 TRAINING

The contractor shall support Government personnel by providing on-site training/demonstration of operation and maintenance of the equipment. The training may involve up to 200 personnel over three (3) shifts. Day Shift (7:00-3:00PM), Swing Shift (3:00PM – 11:00PM), and Grave Yard Shift (11:00PM – 7:00AM). Training shall be provided for each of the three (3) shifts.

3.2 MANAGEMENT REQUIREMENTS

The contractor shall ensure the following requirements are accomplished:

3.2.1 CONTRACTOR PERSONNEL

Contractor employees who are required to communicate with Government personnel shall have the ability to clearly read, write, and speak English.

1.0 SCOPE
1.1 BACKGROUND
2.0 APPLICABLE DOCUMENTS
2.1 NON-GOVERNMENT STANDARDS AND OTHER PUBLICATIONS
2.1.1 Occupational Safety and Health Administration REgulations TO INCLUDE, but not limited to:
2.1.2 NATIONAL FIRE PROTECTION AGENCY (NFPA) Codes and Standards to include but not limited to:
2.1.3 UNIFIED FACILITY CRITERIA (UFCS) TO INCLUDE, but not limited to:
2.1.4 INTERNATIONAL CODE COUNCIL (ICC) CODE PUBLICATIONS TO INCLUDE
2.1.5 Air Force Engineering Technical Letters (ETLs) as listed at the following web site: http://www.afcesa.af.mil/library/etl
3.1 SPECIFICATIONS
3.1.1 DIMENSIONS
3.1.2 ELECTRICAL CHARACTERISTICS
3.1.5 DELIVERY
3.1.6 MANUALS
3.1.7 TRAINING
3.2 MANAGEMENT REQUIREMENTS

File details come from the government source that posted it. Updated .