SOW CGC Cimarron Tank and Pipe Cleaning.docx
DOCX document 114 KB Posted
- Attached to
- CGC CIMARRON DS FY26 TANK AND PIPE CLEANING
- Solicitation number
- 52065FQ260000148
About this file
This is a Statement of Work (SOW) for cleaning and flushing services on the USCGC Cimarron (WLR-65502) at the U.S. Coast Guard Industrial Production Detachment in St. Louis, Missouri. The work encompasses three primary tasks: cleaning and inspection of the sewage holding tank (Work Item 7, 750-gallon capacity), cleaning and flushing of grey water piping (Work Item 8), and cleaning and flushing of sewage piping (Work Item 9). The performance period runs from August 4, 2026, through September 22, 2026, with regular business hours Monday through Thursday from 6:00 AM to 4:30 PM Central Standard Time.
The contractor must furnish all labor, materials, equipment, and protective coverings necessary to complete the work. For the sewage holding tank, the contractor shall remove all contents, clean interior surfaces free of foreign materials and sludge, inspect all components including structural members and coating condition, clean the control panel assembly, replace gaskets and fasteners with new materials, and perform operational tests before and after work. For both piping systems, the contractor shall perform hydrojet cleaning at minimum 2500 psig pressure, use borescope inspection to verify removal of all visible deposits, and conduct leak tests post-completion. Chemical cleaning is permitted as an alternative or supplementary method if pre-approved by the Contracting Officer's Representative (COR) with Material Safety Data Sheets submitted in advance. The contractor bears full liability for any damage to government property. Coast Guard personnel will operate all shipboard machinery and equipment. All waste disposal must comply with applicable Federal, state, and local regulations, and the contractor must coordinate with the Point of Contact (Brian Glass, 225-405-3978) and submit Contractor Final Reports (CFR) documenting all inspection findings and test results.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FAR Clauses for Services.pdf | ||
| SF-18 BLANK.pdf | ||
| WageRates.txt | TXT text file | |
| 65-WD_4808_2_1_-_1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF HOMELAND SECURITY
UNITED STATES COAST GUARD
IPD ST. LOUIS
SOW SHIPBOARD SEWAGE TANK AND PIPING, CLEAN/FLUSH AND GREY WATER PIPING, CLEAN/FLUSH
CGC CIMARRON
Project location: IPD St. Louis POC: Brian Glass Alt POC: CW4 Ryan Dahl
CGC Cimarron IPD St. Louis
DESCRIPTION OF WORK. This work item describes the requirements for the Contractor to clean and Inspect Sewage Holding Tank (Work Item 7), Clean and Flush the vessel's grey water piping (Work Item 8), Clean and Flush vessel's sewage piping (Work Item 9).
Visits for possible estimates must be scheduled with the Industrial Detachment Supervisor.
Period of Performance:
Start Date: 04Aug2026 Completion Date: 22Sept2026
Vessel: USCGC Cimarron (WLR-65502)
Note: Coast Guard Personnel will operate all Shipboard Machinery and Components.
SERVICE LOCATION:
Industrial Production Detachment 100 Arsenal St.
St. Louis, MO 63118
POINT OF CONTACT
The Government Point of Contact for all (POC) Brian Glass brian.h.glass@uscg.mil 225-405-3978. Alternate POC CW4 Ryan Dahl ryan.dahl@uscg.mil 504-329-9245.
COORDINATION
The Contractor shall coordinate with the POC to minimize interference with Coast Guard personnel and/or operations. Regular business hours are 0600 – 1630 (6:00am – 4:30pm) central standard time Monday - Thursday. Adjustments to time will be considered but not guaranteed, on a case-by-case basis, at the request of the contractor.
LIABILITIES OF CONTRACTOR
Any damage to government property caused by the contractor shall be repaired or replaced by the contractor at no cost to the government.
86350_ESD_1021_FLT
REC_86350_FLT_65’ WLR ‘A’ Class (ALL) (0821)
WORK ITEM 7: Sewage Holding Tank(s), Clean and Inspect - Tender
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to clean and inspect the following tank(s):
table 1 – tanks
| TYPE OF TANK |
| LOCATION |
| CAPACITY - 95% |
(Gallons) LOW SUCTION (Gallons)
| Sewage Holding Tank |
| 2-07-0 |
| 750 |
| 50 |
1.2 Government-furnished property.
None.
2. REFERENCES
Coast Guard Drawings Coast Guard Drawing 65 WD 4808-2, Rev 1, Secondary Drainage Sys Coast Guard Publications Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements Other References ASTM International (ASTM) D1330, 2015, Standard Specification for Rubber Sheet Gaskets
3. REQUIREMENTS
3.1 General.
3.1.1 CIR.
None.
3.1.2 Tech Rep.
Not applicable.
3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.
3.1.3.1 Plug all inlet and outlet piping in the tank(s) to prevent contaminants from entering. Use plugs with an attached lanyard, ring or other system that will ensure plugs are not lost in the pipe openings.
3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the following:
Piping.
Pump(s).
3.1.5 Plug log. The Contractor shall keep a written record of all plugs put in any tank vents. A separate list shall be kept for each tank being entered.
3.1.5.1 Ensure that all plugs are removed from each tank upon completion of work in the tank.
3.1.5.2 The plug log shall be available to the Coast Guard Inspector when the inspector is performing his close-out inspection on each tank.
3.2 Operational test, initial. Prior to commencement of work, the Contractor shall witness Coast Guard personnel perform an operational pre-test to demonstrate all tank TLIs' existing operational condition. Submit a CFR.
3.3 Service disruption. When sewage collection service is disrupted due to contractor repairs, the Contractor shall refer to SFLC Standard Spec 0000 par 3.2.11 to provide required temporary facilities.
3.4 Cleaning and inspection requirements. The Contractor shall accomplish the following for the tank(s) listed in paragraph 1.1 (Intent), referring to Coast Guard Drawing 65 WD 4808-2, Rev 1, Secondary Drainage Sys for guidance:
3.4.1 Content removal. Remove and dispose of all contents, fluids, and/or residues in accordance with all applicable Federal, state, and local regulations
3.4.2 Cleaning requirements. Remove manhole cover(s). Clean all tank structure’s interior surfaces free of all foreign materials, sediment, and sludge. Remove all persistent residues, taking care not to damage the tank coating system. Remove cleaning media and residues continuously from the tank during the washing process. Remove any residual wash media and wipe up residual moisture with clean lint-free cloths. Collect, contain, and dispose of all wash media, residues, and cleaning materials in accordance with all Federal, state, and local regulations. Clean all tank vent lines. Remove and clean the eductors and level switches inside of the tank(s). Reinstall the eductors and level switches upon completion of tank cleaning. Use new gaskets and o-rings to install/reinstall all removed/disturbed components.
3.4.3 Inspection. Visually inspect all interior surfaces, including, but not limited to bulkheads, floor and overhead plating, structural members, manhole cover surfaces, fasteners and gasket seating surfaces. Submit a CFR including the following, as applicable:
Tank structural condition.
Inaccessible areas.
Condition of tank coating, including measurements, percentage, location, and type of coating failure (not applicable for stainless steel tanks).
Tank level indicator (TLI), vacuum and/or float switch condition.
Suction and discharge piping and vent line condition.
Fastener material (stainless steel) and condition.
3.4.4 Control panel assembly. Open and vacuum clean the control panel assembly. Inspect the control panel assembly for any indications of overheating or loose wiring or connections. Submit a CFR
3.5 Closing. The Contractor shall notify the COR at least 24 hours prior to closing the tank(s). After satisfactory inspection by the Coast Guard Inspector, and completion of all authorized repairs, close the manhole cover(s) with new gasket material conforming to ASTM D1330.
3.5.1 The Contractor shall renew 100% of nylon insert/nylock nuts and washers.
NOTE
Coast Guard personnel will operate all shipboard machinery and equipment.
3.6 Operational test, post repairs. After completion of work, the Contractor shall accomplish the following in the presence of the Coast Guard Inspector, and submit a CFR:
3.6.1 Adjust the set point on each of the vacuum pressure switches (as applicable) to the set points noted previously.
3.6.2 Verify operation of the low and high level switches/alarms and that the pumps cycle from lead to lag status during operation. Demonstrate proper operation of tank TLIs to prove satisfactory operating condition.
3.6.3 Upon completion of testing and, in the presence of the Coast Guard Inspector, pump tank(s) to the limit of the ship’s installed pumps.
4. NOTES
This section is not applicable to this work item.
59320_0520_FLT
REC_59320_FLT_65 WLR ‘A’ Class (ALL) (1113) WORK ITEM 8: Grey Water Piping, Clean And Flush
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to clean the grey water piping system.
1.2 Government-furnished property.
None.
2. REFERENCES
Coast Guard Drawings Coast Guard Drawing 65 WD 4808-2, Rev 1, Secondary Drainage Sys Coast Guard Publications Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements Other References
3. REQUIREMENTS
3.1 General.
3.1.1 CIR.
None.
3.1.2 Tech Rep.
Not applicable.
3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.
3.1.4 Interferences. The Contractor must handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the below-listed:
· Grey water pumps
3.2 Contamination prevention. The Contractor shall take all precautions to prevent contamination of personnel and spaces in accordance with all applicable Federal, state, and local regulations.
3.3 Personnel qualification. The Contractor shall ensure that personnel accomplishing this work are qualified and experienced in operating the pressurized water system and handling the chemicals. For each operator/cleaning technician, submit documentation of applicable experience and training obtained within the last twelve months along with the Cleaning Plan (see paragraph 3.5.2 (Plan Submittal)).
3.4 Operational test - initial. Prior to commencement of work, the Contractor shall witness Coast Guard personnel perform an initial operational test of all items or shipboard devices to be disturbed, used, repaired, or altered, to demonstrate existing operational condition. Submit a CFR.
3.5 Piping hydrojet cleaning. The Contractor shall perform the following work:
3.5.1 The Contractor shall clean and flush the entire grey water system piping, shown on Coast Guard Drawing 65 WD 4808-2, Rev 1, Secondary Drainage Sys.
3.5.2 Prior to commencing work, coordinate with the Coast Guard Inspector. Determine required down times for affected piping system. Determine the feasibility/need for the piping system to be split to minimize system down time.
3.5.3 With the aid of ship’s force, split the plumbing drain system fore and aft by closing isolation valves in the drainage system. Work on only one section of the plumbing drain system at a time to allow use of toilet and shower facilities in the other section of the system by the ship’s duty section.
3.5.4 Using the referenced Coast Guard drawings as guidance, hydro blast the internal surfaces of all of the plumbing drain piping. Hydro blast pressure shall be at least 2500 psig at the discharge nozzle in all piping to ensure removal of all salts and scale from piping internal surfaces.
3.5.4.1 Ship’s force will provide an assistant to the Contractor to show the Contractor the location of clean-out connections within the plumbing drain system.
3.5.4.2 Open each of the clean out connections as required to clean and hydro blast all of the internal piping within the system. Catch any fluid that drains from the clean out connections when it is opened and clean up any spills using bleach to disinfect the spill after cleaning.
3.5.4.3 It may be necessary for the Contractor to install additional clean-out connections to access all portions of the plumbing drain system. If additional clean-out connections are needed, a separate specification item in this specification package shall be authorized to install additional clean-out connections.
3.5.4.4 Hydro blast cleaning water may be collected in the ship’s sewage system and disposed of via the ship’s sewage shore tie connections.
3.5.5 Clean until all of the following conditions are met:
| All visible calcium carbonate deposits, solid deposits and build-up are removed from pipe walls. |
| Discharge water from the piping being cleaned is free of all visible scale and deposits. |
3.5.5.1 Inspect the piping interior using a borescope in the presence of the COR, to verify that all solid deposits visible to the unmagnified eye have been removed. Continue the cleaning process until all visible solid deposits are removed from the pipe walls.
3.5.6 In the event that hydroblasting alone does not clean piping to required conditions, Contractor shall use chemical cleaning methods.
3.5.6.1 Ensure that chemical cleaners do not damage the environment, heat exchanger or the vessel.
3.5.6.2 Submit the written plan for chemical cleaning to the COR for approval. The procedure shall include products to be used, safety precautions, disposal requirements, sequence of events, etc.
CAUTION
Submit a MSDS to the COR for all chemicals proposed for use.
3.5.6.3 Chemical cleaning waste water disposal. Dispose of all cleaning fluids and debris in accordance with all applicable Federal, state, and local regulations. Remove all unused chemicals from USCG property immediately upon completion of work item. Do not drain any fluids (including fresh water) into any space, bilge, or exterior location.
· Sequence of each location that ensures all piping sections will be cleaned and all foreign debris removed.
3.6 Pumps and valves. The Contractor shall replace system tank valve(s) with temporary spool piece(s). Visually inspect system pumps and valve(s); and submit a CFR. Upon completion of work, reinstall the removed tank valve(s) with new gaskets. Grey water pumps to remain in place and isolated during cleaning operations.
3.7 Gasket renewal. The Contractor shall reinstall all removed valves and fittings with new gasket material conforming to applicable referenced drawings.
NOTE
Coast Guard personnel will operate all shipboard machinery and equipment.
3.8 Operational test – post repairs. After completion of work, the Contractor shall thoroughly test, in the presence of the Coast Guard Inspector and demonstrate all items or shipboard devices that have been disturbed, used, repaired, altered, or installed to be in satisfactory operating condition. Submit a CFR.
3.8.1 Leak test. After all system components are reinstalled, the Contractor shall test all disturbed piping for leaks, as follows, and submit a CFR:
· Plug all system openings (except the highest) and fill system with water to the point of overflow. Ensure that the water level does not go down (without adding any water) for sufficient time to inspect the entire system (no less than 15 minutes).
· Closely monitor the system for leaks. Repair all leaks detected.
· Repeat test and inspection until no leaks are detected.
59321_0520_FLT
REC_59320_FLT_65 WLR ‘A’ Class (ALL) (1113) WORK ITEM 9: Sewage Piping, Clean And Flush
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to clean the sewage piping system.
1.2 Government-furnished property.
None.
2. REFERENCES
Coast Guard Drawings Coast Guard Drawing 65 WD 4808-2, Rev 1, Secondary Drainage Sys Coast Guard Publications Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2018, General Requirements Other References ASTM International (ASTM) D1330, 2015, Standard Specification for Rubber Sheet Gaskets
3. REQUIREMENTS
3.1 General.
3.1.1 CIR.
None.
3.1.2 Tech Rep.
Not applicable.
3.1.3 Protective measures. The and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.
3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the below-listed:
Sewage pumps Toilets
3.2 Contamination prevention. The Contractor shall take all precautions to prevent contamination of personnel and spaces in accordance with all applicable Federal, state, and local regulations.
3.3 Personnel qualification. The Contractor shall ensure that personnel accomplishing this work are qualified and experienced in operating the pressurized water system and handling the chemicals. For each operator/cleaning technician, submit documentation of applicable experience and training obtained within the last twelve months along with the Cleaning Plan.
3.4 Operational test - initial. Prior to commencement of work, the Contractor shall witness Coast Guard personnel perform an initial operational test of all items or shipboard devices to be disturbed, used, repaired, or altered, to demonstrate existing operational condition. Submit a CFR.
3.5 Cleaning plan. The Contractor shall establish a plan for cleaning the designated piping system, listing the step by step procedures necessary to ensure that all foreign debris is removed from the piping system.
CAUTION
Although the Coast Guard prefers pressurized water as the cleaning fluid, the Contractor may propose chemical cleaning as an alternative, providing that the proposed chemical cleaning agent is environmentally safe, suitable for use in marine sewage piping application, and pre-approved by the COR. The chemicals used in the cleaning (including cleaning chemicals, neutralizing compounds, and defoaming chemicals) shall not cause any significant detrimental effects to the sewage piping system or any other system components Due to the fact that system piping has historically been difficult to clean by pressure washing only, chemical cleaning is usually required to successfully complete the cleaning process.
Submit a MSDS to the COR for all chemicals proposed for use.
3.5.1 Procedure requirements. The Contractor shall ensure that the procedure includes the following:
Methods of cleaning.
All safety precautions required during cleaning operations.
List of qualified personnel who will operate machinery or handle chemicals (see paragraph 3.3 (Personnel qualification) herein).
Locations in the sewage piping where cleaning will take place, and any additional fittings necessary.
Sequence of each location that ensures all piping sections will be cleaned and all foreign debris removed.
3.5.2 Plan submittal. The Contractor shall submit the written plan to the COR for approval at least 48 hours prior to commencing cleaning operations.
3.6 Clean and flush. The Contractor shall clean and flush the entire sewage system piping, shown on Coast Guard Drawing 65 WD 4808-2, Rev 1, Secondary Drainage Sys.
3.6.1 Pumps and valves. Replace system tank valve(s) with temporary spool piece(s) before cleaning. Visually inspect system pumps and valve(s); and submit a CFR. Upon completion of work, reinstall the removed tank valve(s) with new gaskets. Sewage pumps to remain in place and isolated during cleaning operations.
3.6.2 Cleaning. Continue cleaning until all of the following conditions are met:
All visible calcium carbonate deposits, solid deposits and build-up are removed from pipe walls.
Discharge water from the piping being cleaned is free of all visible scale and deposits.
3.6.3 Inspect the piping interior using a borescope in the presence of the COR, to verify that all solid deposits visible to the unmagnified eye have been removed. Continue the cleaning process until all visible solid deposits are removed from the pipe walls.
3.7 Waste disposal. The Contractor shall dispose of all cleaning fluids and debris in accordance with all applicable Federal, state, and local regulations. Remove all unused chemicals from USCG property immediately upon completion of work item. Do not drain any fluids (including fresh water) into any space, bilge, or exterior location.
3.8 Gasket renewal. The Contractor shall reinstall all removed valves and fittings with new gasket material conforming to ASTM D1330.
NOTE
Coast Guard personnel will operate all shipboard machinery and equipment.
3.9 Operational test – post repairs. After completion of work, the Contractor shall thoroughly test, in the presence of the Coast Guard Inspector and demonstrate all items or shipboard devices that have been disturbed, used, repaired, altered, or installed to be in satisfactory operating condition. Submit a CFR.
3.9.1 Leak test. After all system components are reinstalled, the Contractor shall test all disturbed piping for leaks, as follows, and submit a CFR:
Plug all system openings (except the highest) and fill system with water to the point of overflow. Ensure that the water level does not go down (without adding any water) for sufficient time to inspect the entire system (no less than 15 minutes).
Closely monitor the system for leaks. Repair all leaks detected.
Repeat test and inspection until no leaks are detected.