SOW_-Canyon_Ferry_Temporary_Traffic_Control_1.pdf

PDF 305 KB Posted

Attached to
Canyon Ferry Traffic Control Federal contract opportunity
Solicitation number
140R6024Q0076
Issued by
Department of the Interior Bureau of Reclamation

About this file

This document is a Statement of Work (SOW) for providing traffic control services at Canyon Ferry Dam in Montana. The primary objective is to procure services to place necessary signage and automated traffic control devices to safely allow a single lane closure across the dam while the Bureau of Reclamation conducts drain cleaning work, which is anticipated to last up to 17 weeks.

The SOW outlines the required services, including mobilization, initial system setup, training of on-site personnel, and provision of traffic control signals and signage for 17 weeks. The work is expected to take place between April 29, 2024, and April 28, 2025, with 28 days' notice provided to the contractor. The traffic control system must meet the requirements of the Manual on Uniform Traffic Control Devices (MUTCD), Part 6. The related pre-solicitation notice indicates this is a sources sought for a Firm Fixed Price contract, with a set-aside for small businesses in various categories, using NAICS code 561990 with a $16.5M size standard.

View the file

Other files for this federal contract opportunity

Other files attached to Canyon Ferry Traffic Control, newest first.
File Type Posted
SOW_-Canyon_Ferry_Temporary_Traffic_Control_2.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Canyon Ferry Dam Temporary Traffic Control

Traffic Control

CANYON FERRY DAM

TEMPORARY TRAFFIC CONTROL STATEMENT OF WORK

PART 1 GENERAL

1.01 INTRODUCTION

The Canyon Ferry Dam was constructed from 1949-1954. The Bureau of Reclamation constructed and continues to operate and maintain Canyon Ferry Dam.

The Bureau of Reclamation plans to clean the drains located within the dam. To accomplish this work, specialty equipment must be staged along the dam crest during working hours. Montana Highway 284 crossed the crest of Canyon Ferry Dam. The staging of this equipment will require one lane of that highway to be closed while work is occurring.

The proposed project consists of performing all necessary work to efficiently provide an automated traffic control system that automatically controls traffic through an open single lane. It also requires that the system be set up and Bureau of Reclamation employees be trained in how to control the system.

1.02 QUANTITIES

CLIN Bid Item Quantity Unit

1 Mobilization 1 LS

2 Initial System Setup and Training of On-Site Personnel 3 Day

3 Traffic Control Signals and Signage 17 Week

1.03 OBJECTIVE

The Bureau of Reclamation intends to procure services to provide traffic control. This work includes placing all necessary signage and automated traffic control devices to safely allow a single lane to be closed across Canyon Ferry Dam. The work on the dam is anticipated to last up to 17 weeks.

1.04 SCHEDULE

The Canyon Ferry drain cleaning work is anticipated will take place between April 29, 2024, and April 28, 2025. It is anticipated that the contractor will be given 28 days of notice for the need for the traffic control devices. Once mobilization for the work occurs, it is anticipated to take 17 weeks or less for the work to be complete at the dam.

1.05 LOCATION

Canyon Ferry Dam is located on Canyon Ferry Road (State Route 284) approximately 20 miles northeast of Helena, Lewis and Clark County, Montana. The dam is located at latitude 46.6483130 and longitude -111.7281880.

The USBR Canyon Ferry Field office is located at: 7700 Canyon Ferry Road, Helena, MT 59602

1.06 REFERENCE STANDARDS

A. Federal Highway Administration, Department of Transportation

1. MUTCD, Part 6 Part 6, Temporary Traffic Control, Manual on Uniform Traffic Control Devices, 2009 Edition with Revisions 1 and 2, (http://mutcd.fhwa.dot.gov/kno_2009r1r2.ht m)

1.07 SUBMITTALS

A. Required Submittal, Traffic control plan.

The traffic control plan shall show the location of all necessary traffic control devices as required by the MUTCD, Part 6.

PART 2 EXECUTION

2.01 TRAFFIC CONTROL

A. Meet requirements of MUTCD, Part 6.

B. Provide cones, delineators, signs, and other temporary traffic control devices as required to protect work and public safety. The traffic control system shall include a set of

Minimum Beginning Location Of Lane Closure

Minimum End Location Of Lane Closure automated traffic control lights or automated flaggers that have the capability to be changed from single lane traffic to an amber flashing light during off work hours when a lane closure is not required. The automatic traffic control system shall be able to be changed from the single lane traffic control to the amber flashing light by Reclamation personnel. It is expected that the contractor train on site personnel in using this system so the change can be made without the contractor each day.

C. Remove traffic control devices when no longer needed.