SOW_-Canyon_Ferry_Temporary_Traffic_Control_2.pdf
PDF 305 KB Posted
- Attached to
- Canyon Ferry Traffic Control Federal contract opportunity
- Solicitation number
- 140R6024Q0076
About this file
This document is a Statement of Work (SOW) for a federal contract opportunity to provide temporary traffic control services at the Canyon Ferry Dam in Montana. The SOW outlines the objective to procure services for placing signage and automated traffic control devices to safely allow a single lane closure across the dam during drain cleaning work, which is anticipated to last up to 17 weeks between April 29, 2024, and April 28, 2025.
The key requirements include mobilization, initial system setup and training of on-site personnel, and providing traffic control signals and signage for 17 weeks. The work must comply with the Manual on Uniform Traffic Control Devices (MUTCD) Part 6 requirements. The contractor is expected to provide an automated traffic control system that can be operated by Bureau of Reclamation personnel to transition between single lane traffic control and an amber flashing light during non-working hours.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SOW_-Canyon_Ferry_Temporary_Traffic_Control_1.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Canyon Ferry Dam Temporary Traffic Control
Traffic Control
CANYON FERRY DAM
TEMPORARY TRAFFIC CONTROL STATEMENT OF WORK
PART 1 GENERAL
1.01 INTRODUCTION
The Canyon Ferry Dam was constructed from 1949-1954. The Bureau of Reclamation constructed and continues to operate and maintain Canyon Ferry Dam.
The Bureau of Reclamation plans to clean the drains located within the dam. To accomplish this work, specialty equipment must be staged along the dam crest during working hours. Montana Highway 284 crossed the crest of Canyon Ferry Dam. The staging of this equipment will require one lane of that highway to be closed while work is occurring.
The proposed project consists of performing all necessary work to efficiently provide an automated traffic control system that automatically controls traffic through an open single lane. It also requires that the system be set up and Bureau of Reclamation employees be trained in how to control the system.
1.02 QUANTITIES
CLIN Bid Item Quantity Unit
1 Mobilization 1 LS
2 Initial System Setup and Training of On-Site Personnel 3 Day
3 Traffic Control Signals and Signage 17 Week
1.03 OBJECTIVE
The Bureau of Reclamation intends to procure services to provide traffic control. This work includes placing all necessary signage and automated traffic control devices to safely allow a single lane to be closed across Canyon Ferry Dam. The work on the dam is anticipated to last up to 17 weeks.
1.04 SCHEDULE
The Canyon Ferry drain cleaning work is anticipated will take place between April 29, 2024, and April 28, 2025. It is anticipated that the contractor will be given 28 days of notice for the need for the traffic control devices. Once mobilization for the work occurs, it is anticipated to take 17 weeks or less for the work to be complete at the dam.
1.05 LOCATION
Canyon Ferry Dam is located on Canyon Ferry Road (State Route 284) approximately 20 miles northeast of Helena, Lewis and Clark County, Montana. The dam is located at latitude 46.6483130 and longitude -111.7281880.
The USBR Canyon Ferry Field office is located at: 7700 Canyon Ferry Road, Helena, MT 59602
1.06 REFERENCE STANDARDS
A. Federal Highway Administration, Department of Transportation
1. MUTCD, Part 6 Part 6, Temporary Traffic Control, Manual on Uniform Traffic Control Devices, 2009 Edition with Revisions 1 and 2, (http://mutcd.fhwa.dot.gov/kno_2009r1r2.ht m)
1.07 SUBMITTALS
A. Required Submittal, Traffic control plan.
The traffic control plan shall show the location of all necessary traffic control devices as required by the MUTCD, Part 6.
PART 2 EXECUTION
2.01 TRAFFIC CONTROL
A. Meet requirements of MUTCD, Part 6.
B. Provide cones, delineators, signs, and other temporary traffic control devices as required to protect work and public safety. The traffic control system shall include a set of
Minimum Beginning Location Of Lane Closure
Minimum End Location Of Lane Closure automated traffic control lights or automated flaggers that have the capability to be changed from single lane traffic to an amber flashing light during off work hours when a lane closure is not required. The automatic traffic control system shall be able to be changed from the single lane traffic control to the amber flashing light by Reclamation personnel. It is expected that the contractor train on site personnel in using this system so the change can be made without the contractor each day.
C. Remove traffic control devices when no longer needed.