This document outlines the scope of work for a federal contract to replace security gates and fences at the Nashville Air Traffic Control Tower facility. Key details include replacing two driveway ingress/egress gates, installing over 300 feet of new fencing from the front to rear of the property, and adding one pedestrian gate. Additional requirements involve removing and replacing gate operators and controllers, installing loop detectors, providing submittals and warranties, adhering to safety standards, and coordinating work to avoid impacts to tower operations. The Federal Aviation Administration will oversee the project located at 515 Olen Taylor Drive in Nashville, Tennessee.

View the file

Other files

File Type Posted
6973GH-23-R-00211.pdf PDF
Organizational Experience Form.pdf PDF
32 31 13 Chain Link Fences and Gates.pdf PDF
faa-std-019f.pdf PDF
Uniform Bipartisan Infrastructure Law Report.xlsx XLSX spreadsheet
Wage_Determination_Davidson_County.pdf PDF
SF24 Bid Bond Form.pdf PDF
SF25 Performance Bond Form.pdf PDF
Contractors Release Form DOT F 4220.4.doc DOC document
SF25A Payment Bond Form.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FEDERAL AVIATION ADMINISTRATION SCOPE OF WORK

NASHVILLE AIR TRAFFIC CONTROL TOWER

SECURITY GATE/FENCE

REPLACEMENT/UPGRADES

BNA ATCT

Project Location: 515 Olen Taylor DR Nashville, TN 37217

1. STATEMENT OF WORK

The FAA Nashville Air Traffic Control Tower (BNA ATCT) has two (2) driveway ingress/egress gates into the facility. Both the entry and exit sliding gates require replacement. In addition, due to property changes, a new run of fencing will be installed from the exiting fence from the front to the back of the property. One pedestrian gate will be installed. The contractor will furnish necessary equipment, materials, labor and supervision to perform the following work at the BNA ATCT, a Federal Aviation Administration (FAA) navigational control facility located at 515 Olen Taylor DR, Nashville, TN 37217. Work within this area may require escort, and possibly badging requirements, which might include background checks for all onsite personnel, and must be coordinated with the FAA Contracting Officer’s Representative (COR) in advance.

1. Provide and install heavy duty galvanized fence with barbed wire and associated posts from front to rear of property (Approx. 309 Feet) See Figure 4. Provide additional fencing as shown in figure 10 and Pic. 1 (Approx. 222 feet). Install in accordance with Section 2 of this Statement of Work. (Height to match existing)

(a) Provide and Install all grounding in compliance with FAA STD 19 (excerpted below)

2. Only one vehicle gate will be worked on at a time.

3. Provide and install one pedestrian gate where shown with heavy-duty magnetic locking latch. (See Fig 6) (Submittal Required)

(a) Push-button magnetic release must be installed on a minimum 2”x2” metal post/pedestal, 42” above grade, on the secure side of the property a minimum of 15 feet from the public (exterior) side of the property. (Egress only) (Submittal Required) (Similar to Figure 9)

(b) Power may be fed from Panel ECPA within facility. (See Figures 4, 5)

1. Power Fed in ¾” PVC Coated Rigid Galvanized Steel Conduit (Min 24” Below

Grade

4. Remove each existing heavy-duty cantilever slide entry/exit gates including associated components that assist in the operation of the gate.

5. Remove the electric chain operator associated with each gate.

6. Provide and install heavy-duty cantilever slide entry gates and associated components, similar to existing. (Ty-metal Heavy-Duty Cantilever or Equal) (Submittal Required)

7. Provide and install new guide-rail driven gate operators. Chain driven gates must not be acceptable. Sized to operate the gates submitted. (Hy-Security Slide Drive 50VF2/3 or Equal) (Submittal Required)

(a) Hydraulic Drive

(b) Min 2 HP

(c) 2 Drive Wheels

(d) Adjustable speed (no less than 1.8 ft/sec)

(e) 3 Phase (208V)

(f) Vehicle Detector

(g) Loop Circuits for entry and exit (include exit loop and two reverse loops for each sliding gate)

8. The main structural/support material for the new gate must be manufactured and installed to ensure structural stability in the resting positions. Contractor will be responsible to field verify all measurements. (Dimensions: 20’ Clear Opening Each Gate, 7’ tall)

(a) If new posts are to be installed, Contractor must coordinate in advance with the Contracting Officer’s Representative 24 hrs prior to digging to install any new posts.

1. Provide a submittal sketch of proposed hole locations.

(b) Install (2) new Heavy-Duty Cantilever sliding gates with new carrier posts.

(Submittal Required) (Ty-Metal or Equal)

(c) Three strands of barbed wire to match existing must be installed over entire length at top of each gate, and tensioned in accordance with industry standards.

(d) The maximum acceptable gap under a gate from firm ground must be no more than 4 inches.

(e) Vehicle gate electronic controls must include a manual disconnect of automatic gate drives in case power is lost for an extended period. Automatic exit devices should be adjusted to be only as sensitive as needed for dependable operation. Manual exiting devices (i.e. push button) may be used for pedestrian gates only, however they may not be located closer than 15 feet from the perimeter fencing/gate.

(f) Both gate systems must be tested at the completion of the work activity.

(g) All gates must operate and stop smoothly at both open or closed position, and in closed position, must be set to have minimal space for a pedestrian to ‘squeeze’ between the gate and the stop to gain access to the facility.

9. The contractor must do all necessary gate adjustments to ensure that the gate operates without defect prior to the FAA accepting the work.

10. At the completion of the work, contractor must provide the FAA with procedures for maintaining the gates to enhance the longevity of the gate systems.

The General Contractor (GC) will be expected to work Monday through Friday during the day time hours of 7:00 AM to 5:30 PM unless alternatively coordinated in advance with the Contracting Officer’s Representative (COR). Coordination between the GC and FAA personnel will be required at all times in order to maintain an operational facility.

Any discrepancies between the contract provisions and the actual site conditions will be referred to the Contracting Officer (CO) for a written determination.

2. FENCE CONSTRUCTION DETAILS

1. Fence Construction will be in accordance with the attached Specification: 32 31 13 –

CHAIN LINK FENCES AND GATES

2. Lightning Protection and Grounding for Fences:

5.3.8.1 Fence Grounding (Submittal Required) No Below grade connections will be covered prior to inspection of the COR.

Provide fence grounding in accordance with the following:

a. Fence Post Grounding. Provide a ground rod adjacent to the fence post.

Locate ground rods at horizontal linear spacing intervals not greater than 100 ft along the perimeter fence line. Provide a 4/0 AWG bare stranded copper conductor, exothermically welded to each ground rod and fence post.

b. Ground Rod Installation. Ground rod material and installation parameters will be in accordance with paragraph 4.4.4.1. If soil conditions will not permit installation of ground rods, provide ground dissipation plate(s) in accordance with paragraph 4.4.4.3.

c. Fence Gate. Provide a 1-in. by 1/8-in. flexible tinned copper bond strap or an insulated 4/0 AWG flexible welding type copper conductor connected between the gate and adjacent fence post. Exothermic welding is recommended for these connections.

Install the bonding strap between the gate and post so it will not limit full motion of a swing or slide gate.

d. Fence Gate Post. Provide a ground rod adjacent to each gate post. Install a 4/0 AWG bare stranded copper conductor, exothermically welded to the ground rod and gate post.

Locate the post connection at not greater than 1-ft above grade. Interconnect ground rods located between the gate opening with an exothermically welded 4/0 AWG bare copper conductor buried below frost depth, but not less than 18-in. below ground.

e. Fence Gate Fabric. Provide a horizontal 6 AWG bare stranded tinned copper conductor threaded continuously through the gate fabric and mechanically bonded to the gate vertical support rails.

f. Fence Security - Barbed Razor Wire. Bond security wires to the fence post using 6 AWG bare stranded tinned copper conductor and UL listed bonding connectors. Bond across terminations in the security wire using a short piece of the security wire material and UL listed bonding connectors at the same locations in 5.3.8.1 (a), (c), and (d).

g. Fence Wire Fabric - Chain Link. Attach metallic fence fabric to fence posts with wire ties of the same material.

h. Proximity to a Facility EES. Portions of a fence that are located within 22 ft of a facility EES will be bonded to that EES with a 4/0 AWG bare copper conductor exothermically welded to a fence post ground rod. Connections must be made at a maximum spacing of 100 ft, with a minimum of two connections.

See Figure 18 for illustration of fence grounding installation methods.

3. SLIDING GATE CONSTRUCTION DETAILS:

3. Gate Frame:

(a) The gate frame must be fabricated from 6063-T6 aluminum alloy extrusions.

The top member must be a 3" x 5" aluminum structural channel/tube extrusion weighing not less than 3.0 lb/lf (4.4kg/m). To maintain structural integrity this frame member must be "keyed" to interlock with the "keyed" track member. If fabricated as a single horizontal piece, the bottom member must be a 2" x 5" aluminum structural tube weighing not less than 2.0 lb/lf. If fabricated in two horizontal pieces, the bottom member must be a 5" aluminum structural channel weighing not less than 2.65 lb/lf, and the two horizontal pieces or sections must be spliced in the field (the gate frame must be fabricated in one or multiple sections depending on size requirements or project constraints).

4. Vertical Members (Chain Link):

(a) The vertical members at the ends of the opening portion of the frame must be "P" shaped in cross section with a nominal base dimension of no less than 2” x 2” (51mm x 51mm) and weighing not less than 1.6 lb/lf (2.3kg/m). Major 2” x 2”

(51mm x 51mm) vertical members weighing not less than 1.1lb/lf must separate each bay and must be spaced at less than gate height intervals.

(b) Intermediate 1” x 2” (25mm x 51mm) vertical members weighing not less than .82 lb/lf (1.2kg/m) must alternate between the 2” x 2” major members..

5. Gate Track:

(a) The gate frame must have separate semi-enclosed “keyed” tracks, extruded from 6005A-T61 or 6105 T5 aluminum alloy, weighing not less than 2.9 lb/lf. Track members are to be located on each side of the top member. When interlocked and welded to the “keyed” top member, it forms a composite structure with the top of the gate frame. Welds are to be placed alternately along the top and side of the track at 9" (229mm) centers with welds being a minimum of 2"(51mm) long.

(b) All welds on the gate frame must conform to Welding Procedure Specification and Procedure Qualification Record to insure conformance to the AWS D1.2 Structural Welding Code. All individual welders must be certified to AWS D1.2 welding code. See 1.02 D.

6. Gate Mounting:

(a) The gate frame is to be supported from the track by four (4) swivel type, self-aligning, 4 wheeled, sealed lubricant, ball-bearing truck assemblies.

(b) The bottom of each support post must have a bracket equipped with a pair of 3” (76mm) UHMW guide wheels Wheel cover protectors must be included with bottom guides to comply with UL325.

(c) Gap protectors must be provided and installed, compliant with ASTM F 2200.

(d) Diagonal "X" bracing of 3/16" or 1/4” diameter stainless or galvanized steel cable must be installed throughout the entire gate frame.

(e) The gate must be completed by installation of approved filler as specified.

(f) Chain Link: 2” x 2” x 9 gauge aluminized steel chain link fabric must extend the entire length of the gate (if operated gate, counterbalance must also have fabric to prevent reach through and comply with ASTM F 2200, see 1.03 C.1) Fabric must be attached at each end of the gate frame by standard fence industry tension bars and tied at each 2” x 2” (51mm x 51mm) vertical member with standard fence industry ties. ASTM F 2200 requires attachment method that leaves no leading or bottom edge protrusions (cannot exceed 0.5 inch).

7. Posts:

(a) Double sets of support posts must be minimum 4" O.D. (102mm) round SS40 or 4” x 4” x 3/16” wall square steel tubing, grade 500. Gate posts must be galvanized or coated and supported in concrete footings as specified by the design team.

8. Finish:

(a) Gate to be mill finish aluminum or color coated with polyester powder as specified. If powder coated, the gate (including track member) and all accessories must be pretreated chemically by sand blasting or other acceptable method to ensure proper coating adherence.

9. Warranty:

(a) The truck assembly must be warranted against manufacturing defects by the manufacturer for a period of (5) five years from date of sale.

4. SUBMITTALS:

1. Product Data:

A. Provide manufacturer’s catalog cuts with printed specifications and installation instructions.

B. If operated gate system, furnish (2) copies of operation and maintenance data covering installed products.

2. Shop Drawings:

A. Supply shop drawings showing the gate system, including details of all major components.

B. Include complete details of gate construction, gate height and post spacing dimensions.

3. Certification of Performance Criteria:

A. Manufacturer of gate system must provide certification stating the gate system includes the following material components that provide superior performance and longevity. Alternate designs built to minimum standards that do not include these additional structural features will not be accepted.

a Gate track system must be keyed to interlock into gate frame member (providing 200% additional strength when compared to weld only keyless systems). When interlocked with and welded to the "keyed" frame top member, gate track forms a composite structure.

b Gate must have a minimum counterbalance length of 50% opening width which provides a 36% increase in lateral resistance (when compared to ASTM minimum of 40% counterbalance). If gate is ever to be automated, counterbalance section must be filled with fabric or other specified material.

c To provide superior structural integrity, intermediate vertical members must be used - with spacing between verticals to be less than 50% of the gate frame height.

d Entire gate frame (including counterbalance section) must include 2 adjustable stainless or galvanized steel cables (minimum 3/16”) per bay to allow complete gate frame adjustment (maintaining strongest structural square and level orientation).

e Gate truck assemblies must be tested for continuous duty and must have precision ground and hardened components. Bearings must be pre-lubricated and contain shock resistant outer races and captured seals.

f Gate truck assemblies must be supported by a minimum 5/8” plated steel bolt with self aligning capability, rated to support a 2,000 # reaction load.

g Hanger brackets must be hot dipped galvanized steel with a minimum 3/8” thickness that is also gusseted for additional strength.

h Gate top track and supporting hangar bracket assemblies must be certified by a licensed professional engineer to withstand a 2,000 lb.

vertical reaction load without exceeding allowable stresses.

4. Certifications:

A. Gate in compliance with ASTM F 2200, Standard Specification for Automated Vehicular Gate Construction per section 2.01 C.

B. If operated gate system, gate operator must be in compliance with UL 325 as evidenced by UL listing label attached to gate operator.

C. The aluminum welders and welding process must be certified per section 2.03 D.

D. Manufacturer will supply gate design performance certification as per section

1.03 C.

E. Gate manufacturer will certify gate is manufactured in compliance with ASTM F 2200, Standard Specification for Automated Vehicular Gate Construction.

See 1.03 D.1.

F. Gate manufacturer will provide independent certification as to the use of a documented Welding Procedure Specification and Procedure Qualification Record to insure conformance to the AWS D1.2 welding code. Upon request, Individual Certificates of Welder Qualification documenting successful completion of the requirements of the AWS D1.2 code must also be provided. See 1.03 D.3.

3. REFERENCES

1. Underwriters Laboratory Gate Operator Requirements (UL 325). See 3.02 C.

D. Automated / operated vehicular gates are not to be used for pedestrian traffic.

Separate pedestrian gates must always be provided if pedestrian traffic is expected.

2. ASTM F 2200 – Standard Specification for Automated Vehicular Gate Construction. See 2.01 C.

3. ASTM F 1184 – Standard Specification for Industrial and Commercial Horizontal Slide Gates, Type II, Class 2. See 3.02 B.

4. American Welding Society AWS D1.2 Structural Welding Code. See 2.01 D and 2.03 D.

4. SITE ACCESS/CONSTRUCTION LIMITS

a. Contractor must maintain access to the site at all times.

b. Construction/demolition will in no way interfere with FAA Operations. Extreme care will be exercised so as not to cause any interference or interruption of service provided of this facility. It is mandatory that the contractor protect FAA personnel and existing communications equipment. Any damages incurred, as a result of construction activity during the performance of this contract will be repaired/replaced immediately by the contractor at no cost to the FAA.

c. Any work or activity that may impact the FAA, such as work on critical equipment or circuits, will require coordination with the COR. The COR will coordinate with the local facility personnel to address develop an activity specific “Risk Assessment” for the facility’s final approval. This process may take a full day to complete.

d. No contractor personnel may terminate or remove any connections to existing power panels. Only FAA personnel may enter FAA panel boards unless they have been de-energized and coordination has been done in advance with the COR. Contractor will advise the COR at least one day in advance when it is expected that access to power panels or the security system will be necessary to allow for coordination with local FAA specialists to be on site to make the terminations. The contractor personnel may not operate any breakers in any existing FAA panel boards. NO ELECTRICAL

TERMINATIONS MAY BE MADE ON AN ENERGIZED CIRCUIT.

e. The contractor will confine operations, activities, storage of materials and employee parking within the designated areas, as identified by the COR. If required, additional space the contractor deems necessary will be obtained off site, at no additional cost to the

Government.

f. Vehicles transporting materials must not be loaded beyond the capacity prescribed by federal, state, or local laws. Obstruction of existing roadways, driveways, to the facility is strictly prohibited.

g. Damage to existing paving, lawns, and utilities caused by the contractor's activities must be repaired immediately. Any damages that are a result of the contractor’s activities must be repaired. All costs of repairs will be paid by the contractor. After notice to proceed and prior to the commencement of construction, the contractor and COR will conduct joint inspections of the existing areas affected by the construction. Existing damage or defects will be noted and will be used as the basis for determination of damages caused by the contractor's operations.

h. It is strongly urged that the contractor carefully examine the premises to determine the extent of work and the conditions under which it must be done.

i. The Government reserves the right to enter the construction area at any time for work inspection and for the operation of the facility.

j. All work hours, shifts, and overtime work will be coordinated with the COR. Before commencing construction, furnish to the COR a statement of hours per day and days per week to normally be worked and approximate number of persons on the job for a normal work shift.

k. At the end of each work day, the contractor will secure all construction areas.

The contractor is responsible for the security of the staging area, and will provide the required measures at no additional expense to the government.

5. PERSONNEL

Contracting Officer -The term "Contracting Officer" (CO) as used herein denotes the person designated to act on behalf of the Government in the performance of this contract. Where reference is made to "Federal Aviation Administration" (FAA), "Contracting Officer's Representative" (COR), or the like, this will mean the Contracting Officer or his/her authorized representative.

Contractor Superintendence - In accordance with Contract Clause entitled SUPERINTENDENCE BY THE CONTRACTOR, the Contractor will at all times during performance of this contract and until the work is completed and accepted, directly superintend the work or assign and have on site a competent superintendent with the authority to act for the Contractor.

The Contractor will submit a Project Organizational Chart with the key personnel identified and their qualifications for the Government’s review and approval.

The contractor and his employees will be subject to all rules and regulations relative to entering and leaving the FAA facility.

Employees - The government reserves the right to restrict the employment of any contractor employee, or prospective contractor employee, who is identified as a potential threat to the health, safety, security, general well-being, or operational mission of the installation and its population.

The contractor must not employ any person who is in employment of the United States Government if the employment of that person would create a conflict of interest.

6. COORDINATION

The contractor will coordinate all work, which has any or may have any impact on any operational system through the COR. The contractor will immediately cease any work, which is adversely impacting the operation of the FAA facility and will be responsible for the immediate repair or restoration of any portion of the operational system that has been damaged or suffered diminished performance as a result of the contractor's activities. No repairs may be completed without notification of the COR. In some cases, the repairs may be performed by FAA personnel at the contractor’s expense, due to the criticality of the repair.

The Contractor will be responsible for obtaining and payment of all building fees, inspection fees, utility connection charges and any other fees or charges which may be incurred in the performance of this contract. The contractor must comply with all local city, county, and state construction codes.

All materials or workmanship or both which have been rejected by the COR by reasons of failure to conform with the requirements of the Contract Documents must be removed and replaced with new, acceptable materials by the contractor at the contractor's own expense.

Contractor must also pay for testing of new materials which have been installed in place of rejected materials.

7. CONSTRUCTION SCHEDULE

The work plan and schedule prepared by the contractor will consist of a plan designating areas to be closed to allow for construction activities. Include a plan showing construction activities, submittal and approval of materials, samples and shop drawings (if applicable), the procurement of critical materials and equipment, fabrication of special materials and equipment along with their installation and testing.

The Contractor will warranty material, workmanship, and equipment furnished by the various manufacturers in writing for a period of two (2) years (or not less than the industry standard for the material specified, nor the manufacturer’s standard warranty period, whichever is greater) from the date of final project acceptance by the FAA.

8. SAFETY REQUIREMENTS

Contractor Responsibility

a. General Safety Provisions - The Contractor must bear full responsibility to provide safe working conditions for its employees and Contractors. The Contractor must not permit any employee or Subcontractor to work in surroundings or under working conditions that are unsanitary, hazardous, or dangerous to the health and safety of the employee.

b. Accident Prevention - The Contractor will bear the responsibility of maintaining an accident prevention program such that frequent and regular inspections of the job site, materials and equipment are made by a competent person designated by the employer.

c. Use of Equipment - The Contractor will not permit the use of any machinery, tool, material, or equipment that is not in compliance with OSHA regulations. The employer will permit only those employees qualified by training and/or experience to operate equipment and machinery.

i. Submittals required include, but are not necessarily limited to, the following:

Contractor Safety Plan

4. The FAA will not be held responsible for safety inspections to ensure Contractor conformance with the OSHA safety regulations. The FAA, however, reserves the right to notify the Contractor of any deficiencies regarding worker safety.

5. The FAA will evaluate the Contractor on its safety performance, including that of its Subcontractors. The number and severity of safety and security violations will be considered in this evaluation. Contractor safety violations are cause for termination for default, may result in notification of the Contractor’s bonding company, and will affect the Contractor’s opportunity to propose on future work. Failure to correct such deficiencies may impact the Contractor’s ability to work on future FAA contracts.

OSHA Regulations

The Contractor must comply with the latest Occupational Safety and Health Administration regulations (CFR 29 Part 1926) regarding safety in the work area.

The Contractor will be responsible for obtaining copies of non-FAA referenced documents without additional cost to the FAA. If Contractor requests a copy of FAA directives, they may be obtained by contacting the Contracting Officer.

The Contractor is not relieved from adhering to other OSHA requirements not listed herein.

The Contractor will consult the latest referenced OSHA documents for safety regulations.

Documents:

OSHA Documents:

CFR 29 Part 1926Safety and Health Regulations for Construction

CFR 29 Part 1910 General Industry Standards Applicable to Construction Industry

9. CLEAN-UP

The contractor will correct or repair any damage done during any part of this contract. Scrap and debris resulting from the project must be removed from the site after each day’s work on site.

All debris and generated waste will require disposal in a manner that is not in conflict with local sanitary regulations.

10. SUPPLIES AND EQUIPMENT

The Contractor must furnish all supplies and equipment as specified to accomplish the contract specifications.

SHIPPING AND RECEIVING MATERIAL. FAA will not be responsible for shipping or receiving any material relating to this contract nor will the contractor ship or otherwise receive any materials at the expense of the FAA.

PROTECTION OF MATERIAL. Contractor must protect and maintain in like new condition all materials and supplies to be incorporated into this project and will be responsible for their safe storage.

STORAGE OF MATERIALS. No storage area/space will be provided for contractor furnished equipment or supplies. Onsite storage must be coordinated with the COR so that the roadway is not blocked.

11. CONTACT/LOCATION INFORMATION

A. Location of Work:

BNA ATCT

515 Olen Taylor DR Nashville, TN 37217

B. FAA Point of Contact:

Ron Nelson 901-482-7667

12. ACCEPTANCE OF WORK

The FAA COR will conduct a Construction Acceptance Inspection at the completion of the project to ensure that all items of the contract have been fulfilled and that the site has been cleaned of debris.

1. SYSTEM VALIDATION:

A. The complete system will be adjusted to assure it is performing properly.

B. The system must be operated for a sufficient period of time to determine that the system is in proper working order.

C. For operated gate systems - test and explain safety features:

1. Each system feature and device is a separate component of the gate system.

2. Read and follow all instructions for each component.

3. Ensure that all instructions for mechanical components, safety devices and the gate operator are available for everyone who will be using the gate system.

4. The warning signs shipped with the gate operator must be installed in prominent position on both sides of the gate.

5. Ensure the owner is clear with regard to the safety points concerning the basic operational guidelines of the safety features of the gate operator system. These safety points are listed in the gate operator manual and must be read prior to system use.

PHOTOS

Figure 1: Satellite view of BNA ATCT Facility

Figure 2: Southernmost gate - Main Access

Figure 3: Northwest Gate - Employee Access

Figure 4: Line represents approximate location/length of new fence line.

Install Pedestrian Gate

Install U/G Power to Mag Lock/Release.

Fed from ECPA.

Figure 5: Panel to feed Pedestrian Gate Mag Lock Power

Figure 6: Location of New Pedestrian Gate (pic on right shows sim. gate)

Locate New Pedestrian Gate in this area.

Figure 7: View of Gate Controller

Figure 8: Gate Controller (typical)

Figure 9: Card Reader/Camera/Intercom Entry Pedestal (To be Reused) - Remove Temporary Flex Conduit and Bury New Conduit

Figure 10: Sat View showing relocation/new fence location.

Remove section of fence after new fence has been installed to maintain facility security.

Pic 1: View of Existing Main Lot (Looking W)

Pic 2: View of Existing Main Lot (Looking SE)

Remove section of fence after new fence has been installed to maintain facility security.

New Fence (dashed lines)

1. STATEMENT OF WORK
2. ASTM F 2200 – Standard Specification for Automated Vehicular Gate Construction. See 2.01 C.
3. ASTM F 1184 – Standard Specification for Industrial and Commercial Horizontal Slide Gates, Type II, Class 2. See 3.02 B.
4. American Welding Society AWS D1.2 Structural Welding Code. See 2.01 D and 2.03 D.
4. SITE ACCESS/CONSTRUCTION LIMITS
5. PERSONNEL
6. COORDINATION
7. CONSTRUCTION SCHEDULE
8. SAFETY REQUIREMENTS
OSHA Regulations
OSHA Documents:
9. CLEAN-UP
10. SUPPLIES AND EQUIPMENT
11. CONTACT/LOCATION INFORMATION
12. ACCEPTANCE OF WORK