This Statement of Work (SOW) details a bowling alley equipment replacement/upgrade project for the VA New Jersey Healthcare System Lyons Campus. The project involves removing and replacing three bowling lane mechanical operating systems in Building 57, with a comprehensive upgrade including management systems (Conqueror X Re-Entry), pinspotters (EDGE String), scoring systems (BES X), bumper and gutter systems, and lighting upgrades from brands like CenterPunch and Durabowl.
The project is currently in a Sources Sought pre-solicitation phase, classified under NAICS code 238290 with a $22M size standard. The performance timeline is estimated at 45 calendar days from notice to proceed, with the work to be conducted at 151 Knollcroft Road, Lyons, NJ. Potential vendors are invited to submit capability statements including their socio-economic status, with inquiries to be sent to Daniel.Barone@va.gov by noon EST on November 6, 2025. The solicitation will be posted on SAM.gov if sufficient interest is demonstrated.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24226Q0086.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK (SOW)
Bldg. 57 Bowling Alley Equipment Replacement/Upgrade
1. Contract description.
Removal and replacement of 3 bowling alley lanes mechanical operating equipment and components in Bldg. 57 Bowling Alley at the Lyons Campus.
2. Background.
This procurement is needed for a vendor to remove and replace the existing outdated, out of service bowling operating system and mechanical equipment and all components for a new more modernized system at the Lyons VA Medical Center.
3. Scope.
*Contractor will remove 3 lanes, remove and dispose of existing equipment and reinstall lanes upon completion of installation of new equipment and components. *
The Contractor will remove existing equipment and components, and replace with a new, modernized upgrade system as follows:
Management Systems:
Conqueror X Re-Entry - Basics and Arcade Durabowl Bumper & Gutter System:
Durabowl Auto Opener Upgrade
Pinspotters – String:
EDGE String Pinspotter, Pair
EDGE String Pinspotter, Single, Even
EDGE String Kickbacks (per lane)
Pinspotter Spare Parts Kit:
EDGE String Spare Parts Kit
Lane Accessories:
Flat Gutters
Intelligent Lighting - All Formats:
CenterPunch Lighting Conqueror X Control Interface
Pins:
EDGE String AMFlite Glow Pins
BES X Scoring:
Upgrade to BES X
Trade-in of existing QScore
Trade-in existing QScore, BES Fly, Micros I and II console
BES X and SuperTouch Spare Parts Kit
BES NV Scoring:
SuperTouch Lane Bowler Console w/out table
Console Floor Wiring Kit
Infrared Monitor Control Kit
Training:
EDGE String PSP Training, 1 day (8 hours), for new installations Virtual Training: One-to-One BASIC
4. Performance Monitoring (if applicable).
Work shall be coordinated with facility thru the Contracting Office Representative (COR). The COR will monitor the contractor’s work performance, and the contractor is required to submit a progress report to the COR.
5. Security Requirements.
General Contractor’s employees shall not enter the project site without appropriate security badge. They may also be subject to inspection of their personal effects when entering or leaving the project site. No photography of VA premises is allowed without written permission of the Contracting Officer except as specifically required by the scope of the work. VA reserves the right to close or shut down the project site and order General Contractor’s employees off the premises in the event of a national emergency. The General Contractor may return to the site only with the written approval of the Contracting Officer.
6. Government-Furnished Equipment (GFE)/Government-Furnished Information (GFI).
N/A
7. Other Pertinent Information or Special Considerations.
a. Identification of Possible Follow-on Work.
Not Used
b. Identification of Potential Conflicts of Interest (COI).
Not Used
e. Inspection and Acceptance Criteria.
The COR is responsible for certifying that the work done under the contract is performed to time and standard. They are also responsible to assure the inspection and acceptance of products provided incidental to services.
8. Risk Control Contractors shall take all measures for safety and infection control and provide all material necessary for protecting existing equipment and property in affected areas of construction against dust and debris, so that equipment and affected areas to be used in the Medical Centers operations will not be hindered.
Contractors shall permit access to Department of Veterans Affairs personnel and patients through other construction areas which serve as routes of access to such affected areas and equipment. Coordinate alteration work in areas occupied by Department of Veterans Affairs so that Medical Center operations will continue during the construction period.
9. Place of Performance.
VA New Jersey Healthcare System Lyons Campus
151 Knollcroft Road Lyons, NJ 07939
Bldg. 57 Bowling Alley
Minimize interference of construction activities with flow of Medical Center traffic, keep roads, walks and entrances to grounds, to parking and to occupied areas of buildings clear of construction materials, debris and standing construction equipment and vehicles.
10. Period of Performance.
Contractor to start immediately after receiving the NTP, estimate completion time is 45 calendar days.