SOW Barrier PLC replacement.pdf

PDF 154 KB Posted

Attached to
Gate Barrier PLC Replacement
Solicitation number
FA485525BarrierMantinence
Issued by

About this file

This Statement of Work (SOW) details a contract for upgrading Programmable Logic Controllers (PLCs) at Cannon Air Force Base's main gate. The Department of the Air Force's Special Operations Center requires the procurement and installation of 5 Micrologix 1400 PLCs with 16 inputs and 16 outputs, compatible with existing Global Grab electrically actuated Delta TT205 barrier retrofit kits.

The specific work includes obtaining the PLCs, developing custom programming, removing existing Telemecanique PLCs, installing and testing the new Micrologix PLCs, providing updated schematic diagrams, and conducting troubleshooting training for the 27th Special Operations Civil Engineering Squadron (27 SOCES) personnel. The project involves ensuring backward and forward language compatibility and future system availability, with the goal of upgrading the logic controllers at both inbound and outbound lanes of the base's main gate.

View the file

Other files

File Type Posted
SOW Barrier PLC replacement Questions and Answers.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

SOW

Last updated 4 Mar 2025

UPGRADE LOGIC CONTROLLERS AT MAIN GATE FINAL DENIAL BARRIERS

STATEMENT OF WORK (SOW)

11 September 2025

Department of the Air Force Special Operations Center

Cannon Air Force Base, New Mexico

Last updated 4 Mar 2025

1. Description And Scope:

Cannon Air Force Base requires services for upgrading the Programmable Logic Controllers (PLC’s) at both the inbound and outbound lanes at Cannon AFB Main gate. The work shall include expected savings and the execution cost of the mitigation measures.

Provide labor to purchase and program 5 each PLC’s with 16 inputs and 16 outputs. PLC’s must be compatible with existing Global Grab (previously Smith and Wesson) electrically actuated Delta TT205 barrier retrofit kit. PLC’s must be backwards and forward language compatible system with foreseeable future availability.

2. Detailed Statement of Works:

2.1 The work will include:

A. Obtain 5 each Micrologix 1400 or equal PLCs with an AB 16 Point Input card and an AB 16 point output card.

B. Develop custom programming for new PLC’s

C. Program Micrologix PLC’s to operate the same as the existing obsolete Telemecanique PLC’s.

D. Remove 5 existing Telemecanique PLC’s.

E. Install programmed Micrologix PLC’s.

F. Test and verify system for full operation.

G. Provide updated one-lines and schematic diagrams.

H. Provide troubleshooting training on new system.

I. Review all attachments with 27 SOCES personnel to ensure all needed maintenance is captured.

3. APPENDICES: None

4. ABBREVIATIONS

27 SOCES 27th Special Operations Civil Engineering Squadron 27 SOCONS 27th Special Operations Contracting Squadron AF Air Force AFI Air Force Instruction BCE Base Civil Engineer

Last updated 4 Mar 2025

CADD Computer Automated Drafting & Design CD Compact Disk CM Construction Manager CO Contracting Officer COR Contracting Officer’s Representative FAR Federal Acquisitions Regulation GCS Ground Control Station IAW In Accordance With IWP Integrated Work Plan MSR Monthly Status Report

NTP Notice To Proceed O&M Operation and Maintenance OPSEC Operational Security POC(s) Point of Contact(s) POP Period of Performance PLC Programmable Logic Controller PM Project Manager SHPO State Historic Preservation Office SOW Statement of Work TSRT Tactical Shelter, Radome and Tower TO Technical Order UFC Unified Facilities Criteria USAF United States Air Force

END OF STATEMENT OF WORK

File details come from the government source that posted it. Updated .