SOW - B747-400 SIM TRAINING_Redacted.pdf
PDF 192 KB Posted
- Attached to
- B747-400 Simulator Training
- Solicitation number
- CTFVC-25B
About this file
This Statement of Work (SOW) details simulator training requirements for the USAF 418th Flight Test Squadron's VC-25B test pilots. The objective is to provide semi-annual, full-motion B747-400 flight simulator sessions for 4 hours each, allowing test pilots to maintain proficiency in flight test planning and Safety Review Boards. The training will be conducted semiannually through FY26-FY28, with the contractor responsible for configuring the simulator as a standard B747-400 with various instrument approach types. Specific milestones include training sessions in June and December of 2025 and 2026, targeting Test Pilots and Flight Test Engineers. The associated federal contract opportunity is a 100% Small Business Set-Aside with NAICS code 611512 "Flight Training", with quotes due by 10 June 2025 at 12:00 PM PDT and is being issued by the Department of the Air Force Materiel Command Test Center.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work – SOW
USAF 418th Flight Test Squadron (418 FLTS) / Global Reach Combined Test Force (GR CTF) B747-400 Flight Simulator
May 7, 2025
1. Background
The Purpose of this Statement of Work (SOW) is to outline requirement to support the USAF 418th Flight Test Squadron (418 FLTS)/ Global Reach Combined Test Force (GR CTF). The government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the contractor who, in turn is responsible to the government. The contractor shall not perform inherently governmental functions as defined in FAR Subpart 7.5 in relationship to this SOW.
2. Objective
The goal of this effort is to allow 418th VC-25B test pilots to maintain proficient in the B747-
400. Test Pilots assigned to VC-25B program will require training to execute Flight Test planning, and Safety Review Boards (SRBs).
3. Scope
The objective is to conduct full-motion B747-400 simulations to accomplish USAF 418th FLTS The SIM training conducted semi-annually for 2 four-hour sessions to allow for proficiency and familiarization on Flight Test Plans.
4. Task Description
Individual simulator sessions will be scheduled semiannually through FY26-FY28. The contractor shall configure the simulator as a standard B747-400 and an airfield with various instrument approach types.
5. Responsibilities
A. The contractor shall provide:
1. All management, personnel, equipment, facilities, tools, materials, supervision, and other items and engineering support services to configure and make available the B747-400 simulator as described in the task description at section 4.
2. 4-hours per session of simulator time for USAF test pilot training semi-annually.
B. The government will provide:
1. Any changes to scheduled milestones with 2 weeks’ notice.
File details come from the government source that posted it. Updated .