This is a Statement of Work (SOW) for the B185 LL Demountable Walls project at Offutt Air Force Base, dated 28 July 2026, under NexGen IT Service Request #18987648. The project objective is to expand and reconfigure lower-level workspace in Building 185 (Rooms L421, L422, L423) using HAWORTH demountable wall systems to establish 557 CS Operational Unit infrastructure and support approximately 400 building personnel. The contractor must dismantle and relocate four existing west wall panels in Room L422 approximately 8 feet east, reclaim and integrate existing demountable panels to expand Room L423's designated work area by approximately 25 linear feet, and install double solid wood doors with HAWORTH-compatible hardware in the southeast corner. Room L421 requires installation of approximately 25 linear feet of new walls configured as two intersecting runs to close in collaboration and training space, utilizing existing material stock and relocating a legacy door from L423.
The contractor shall furnish all labor, tools, materials, and equipment necessary to complete installation in accordance with approved site design and the International Building Code, Uniform Plumbing Code, National Electrical Code, and applicable federal safety standards. All work must meet federal security and environmental requirements, with the contractor responsible for obtaining necessary clearances, certifications, permits, and approvals. The contractor must perform a mandatory site visit prior to bid, maintain a clean and safe work site, provide a one-year workmanship warranty and operations and maintenance manuals at closeout, complete site restoration within ten workdays, remove all debris daily, provide as-built documentation, and coordinate with the real property office regarding all required forms. The pre-solicitation notice FA460026Q0095 indicates a proposed 100% Total Small Business Set-Aside with sole-source award intent to Encompass Corporation; however, interested parties may submit capability statements for consideration.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| WOC 2WS STATEMENT OF WORK 20 July 2026.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work
Date of Request: 28 July 2026 NexGen IT Service Request #: 18987648 Project title: B185 LL Demountable Walls
Objectives:
Building 185 (B185) Workspace Expansion and Reconfiguration (Rooms L421, L422, L423) Project. The objective of this project is to expand and reconfigure the lower level (LL) workspace utilizing HAWORTH demountable wall systems. The project will optimize the layout of room L423, relocate and create a new footprint for room L422, and optionally add new wall configurations to Room L421. The vendor shall provide all necessary labor, project management, and new materials to complete this workspace expansion while maximizing the reuse of legacy HAWORTH panels and doors.
Justification:
Redesigning rooms L423, L422 and L421 in Building 185 is a critical mission requirement to establish 557 CS Operational Unit (UO) infrastructure, physical capacity, training capability and centralized supply chain necessary to facilitate client systems and system administration functions for approximately 400 building personnel.
General Requirements:
Project includes, but is not limited to, the following work elements. The Contractor shall furnish all required services, labor, tools, material, and equipment necessary to complete the installation and integration of the prime mission equipment in accordance with the approved site design and installation plan. No alterations, additions, or deletions shall be made unless by prior approval of the Contracting Officer (CO). All work will meet the International Building Code, Uniform Plumbing Code, National Electrical Code, AFI, UFC, UFGS, ASME, ASTM, ASHRAE, ETL, NFPA 72 and any other applicable code requirement. The contractor shall maintain the work site in a clean and orderly manner so that the safest possible site is provided for workers and AF members. Work shall be completed in a neat, substantial, and competent manner.
Scope:
The contractor shall perform the following teardown, relocation, and installation tasks:
1. Room L422 Relocation and Reconfiguration:
a. Dismantle and move the L423 four (4) West wall panels to the East by approximately 8ft.
b. Utilize the existing L422 door and glass panel to establish the new L422 door space.
2. Room L423 Expansion and Reconfiguration:
a. Reclaim and integrate existing L423 and legacy L422 demountable panels to expand the designated work area.
b. Use on hand demountable wall stock to fill in existing wall gaps to complete the room (~25ft).
c. Install double solid wood doors in the Southeast corner of the room, complete with appropriate framing and HAWORTH-compatible commercial hardware. Final door location determined at install (adjust as needed to accommodate install)
3. Room L421 Configuration
a. Use existing material stock to install new walls to close in Collaboration and training space. Approximately 25 linear feet of panels, configured as two intersecting runs of approximately 23 feet and 2 feet. Final adjustment allowed during install.
b. Extract the legacy L423 door and associate hardware and re-install door to serve as the new entrance for Room L421. TBD during install (Adjustments allowed as needed)
Additional General Requirements
1. Ensure all construction meets federal regulations for safety standards.
1. All security requirements must be met to include times of demolition and construction.
1. It is recommended that the contractor perform a site visit prior to bid. Contractor who are not present will not be in consideration.
1. At close out the contractor shall provide 1 year workmanship warranty and O&M manuals.
1. The Contractor shall furnish all required services, labor, tools, material, and equipment necessary to complete the installation and integration of the prime mission equipment in accordance with the approved site design and installation plan. In addition, the Contractor shall be responsible for the following actions:
1. Obtaining all necessary security and safety clearances for facilities and personnel. This includes obtaining escort badges necessary for unaccompanied work within the area.
1. Obtaining necessary certifications for installation equipment and technologies to be installed.
1. Obtaining environmental and life safety approvals.
1. Acquiring all necessary federal, state, local and base environmental and civil engineering permits and approvals.
1. Redlining installation drawings based upon actual installation results and accommodations due to real-time installation change requirements.
1. Cleaning-up and restoring the site to its original or better condition within 10 workdays after project completion. This includes removal of any portable offices that may have been used to support implementation of the site design at the base.
1. Repairing damage to Government property resulting from contractor activities, assuring the property is returned to its original or better condition.
1. Removing all debris at the end of each shift or more frequently if required to keep the work area safe and useable.
1. Disposing of excess equipment and materials in accordance with General Requirements.
1. Please provide all As-builts at the completion of the project
1. Contractor will work with the real property office in the formulation of all 1354s
Security Requirements The contractor or duly authorized representative shall comply with pertinent Air Force security regulations while working on the project(s). ALL POSSIBLE PRECAUTIONS AND EFFORTS SHALL BE MADE TO PREVENT THE DISCLOSURE OF ANY INFORMATION THAT MIGHT PROVIDE THE CONSTRUCTION CONTRACTORS, MANUFACTURERS, OR SUPPLIERS AN ADVANTAGE OVER OTHERS.