SOW - B1030 Trimax EGW Controls System Integration Automation Upgrade_9 Jul 26.pdf
PDF 185 KB Posted
- Attached to
- Trimax Upgrade
- Solicitation number
- FA930226Q0110
About this file
This is a Statement of Work (SOW) for the B1030 Trimax EGW Controls System Integration & Automation Upgrade at Edwards Air Force Base, California, with a performance period from May 21, 2026 to July 9, 2026.
The contractor must provide system engineering, installation, programming, and commissioning of the EGW control system at Building 1030. Key deliverables include PLC logic development to control facility equipment (pumps, valves, generators) per approved sequence of operations; HMI/SCADA configuration with real-time equipment status, historical data trending, and visual/audible alarming; cybersecurity and compliance adherence to Risk Management Framework guidelines including password changes, port disabling, and role-based access controls; panel assembly with internal component wiring and labeling prior to site delivery; on-site installation of upgraded components and field wiring termination without disrupting facility operations; and comprehensive Site Acceptance Testing alongside government representatives, including point-to-point loop checks, automated sequence verification, and simulated fault testing. The contractor must manage system cut-over from legacy to new systems while maintaining continuous utility support.
The SOW includes extensive security requirements mandating criminal history background checks per DoDM 5200.08V3 and AFMAN 31-101V3, base access via AFMC Form 496 identification cards, compliance with force protection and health protection condition changes, Antiterrorism Awareness Level I training within 30 days, and Operations Security (OPSEC) training within 90 days. Additional requirements include environmental protection compliance, OSHA safety and health standards, submission of a Safety and Health Plan to the contracting office, mishap reporting protocols, and prohibition of weapons on Edwards AFB. All work must be performed by experienced, qualified personnel, and the contractor shall not perform inherently governmental functions.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK (SOW)
FOR
B1030 Trimax EGW Controls System Integration & Automation Upgrade
AT
Edwards AFB, California
21 May 2026
9 Jul 2026
1.0 DESCRIPTION OF SERVICES:
This is a non-personal service, unclassified, system integration and engineering contract for the installation, programming, and commissioning of the EGW control system at Building 1030, Edwards Air Force Base (EAFB), CA. The project requires a contractor to provide all necessary labor, equipment, and materials to complete the work as described herein.
System Engineering and Programming
• PLC Logic Development: The contractor shall engineer and program the Programmable
Logic Controllers (PLCs) to accurately control the designated facility equipment (e.g., pumps, valves, and generators) in accordance with the approved sequence of operations.
• HMI/SCADA Configuration: The contractor shall develop and deploy the Human- Machine Interface (HMI) screens. The graphical interface must provide operators with real-time equipment status, historical data trending, and immediate visual/audible alarming for critical system faults.
• Cybersecurity & Compliance: All software configurations and network integration shall adhere to current Risk Management Framework (RMF) guidelines. The contractor must ensure that default passwords are changed, unnecessary ports are disabled, and role-based access controls are implemented.
Installation and Hardware Integration
• Panel Assembly: The contractor shall assemble, wire, and label all internal components of the control panels prior to site delivery. All wiring must be clearly labeled and correspond directly to the provided schematic drawings.
• On-Site Implementation: The contractor shall physically install the upgraded components, terminate field wiring, and establish network connectivity without causing uncoordinated disruptions to ongoing facility operations.
Testing and Commissioning
• Site Acceptance Testing (SAT): Following installation, the contractor shall conduct a comprehensive SAT alongside government representatives. This includes point-to-point loop checks, verification of all automated sequences, and simulated fault testing to ensure alarms trigger correctly.
• System Cut-Over: The contractor shall manage the transition from the legacy system to the new system, ensuring continuous utility support during the cut-over phase
Misc
All work must be performed by experienced personnel who are qualified to perform the scope of work and meet the requirements in this SOW.
The contractor shall not perform inherently governmental functions as defined in FAR Subpart 7.5 in relationship to this SOW.
2.0 SECURITY REQUIREMENTS:
All Contractor employees will be subject to a criminal history background check IAW DoDM 5200.08V3_AFMAN 31-101V3, Installation Perimeter Access Control, and 412th Test Wing
Integrated Defense Plan (IDP) 31, Volume I (the AFMAN and IDP are both limited access documents but more details on the requirements/process in terms of background checks can be provided by the Contracting Office upon request). Vehicle registration, proof of insurance, and a valid driver's license must be presented for vehicles. Installation Commanders may deny access and credentials based on information obtained during identity vetting that indicates the individual may present a threat to the good order, discipline, and morale of the installation.
Base Access. For Contractor personnel requiring frequent base access to perform work at Edwards AFB will be granted access via an Air Force Materiel Command (AFMC) Form 496, Application for AFMC Identification Card. Air Force Federal Acquisition Regulation Supplement (AFFARS) Clause 5352.242-9000, Contractor Access to Air Force Installations, the Prime Contractor shall submit a written request on company letterhead to the CO with the following information (prior to submitting a request for Base access via an AFMC Form 496): 1) contract number, 2) location of work, 3) contract start and stop date (must be on or before contract’s expiration date), and 4) names of employees/ subcontractor employees needing access to the base, to include each employee’s company name.
It is recommended that the Prime Contractor provide a copy of the request letter to each employee for verification purposes when the employee comes to the Contracting Office at Building 2800 to get their AFMC Form 496 signed. Employees for which no request letter can be found or provided will result in the employee being asked to return on another date/time so verification can be made.
Base passes will be limited to the length of the contract not to exceed 3 years from the date the AFMC Form 496 is submitted to the Contracting Office for signature.
The AFMC Form 496 will be reviewed/approved by the CO, then taken by the Contractor employee to the Edwards AFB Pass & Registration Office in Building 3000, or the Visitor Control Center in Building 1004, for the security portion and issuance of the Base pass.
The contractor shall comply with all base security regulations. Additionally, the contractor shall comply with actions dictated by force protection condition (FPCON) changes/measures and/or health protection condition (HPCON) changes/measures. For real-world situations/exercises, changes to force/health protection conditions could impact contractor performance of work and can include denial of access to the installation to perform work
Only employees who will be working on the contract consistently/frequently should be submitted for a long term Base pass.
The Contractor shall comply with all security requirements imposed by the Installation. Specific security considerations will be handled on an individual Task Order/contract basis as required.
The contractor shall report suspicious activity (refer to Edwards AFB Contractor Antiterrorism Awareness pamphlet) to Security Forces at 661-277-3340 in a timely manner.
The Contractor and its employees shall comply with all base traffic regulations.
Real ID Act is enforced, the Contractor shall comply fully.
Contractor shall maintain and make available to the Contracting Officer Representative (COR/Government Project Manager (GPM), within 30 days after award, records of Antiterrorism Awareness Level I required training of contractor employees and subcontractor employees who require routine physical access to the installation via 30 day pass, DBIDS Access card or Common Access Card (CAC), both initially and annually thereafter. AT Level I training provides contractor employees with the requisite knowledge necessary to remain vigilant for possible terrorist threats.
Level I AT Awareness Training may be taken at https://jkodirect.jten.mil/Atlas2/page/login/Login.jsf for non-CAC holders. CAC holders may complete AT Level I training (Force Protection course ZZ133079) via myLearning at https://lms-jets.cce.af.mil/moodle/. Tracking for each contractor or subcontractor employee is the responsibility of the COR/GPM or unit Antiterrorism Representative.
The Contractor shall be responsible for safeguarding all government property, equipment and materials provided for Contractor use. At the end of each work period, all government facilities, equipment, and materials shall be secured.
During performance of the contract, the Contractor shall be responsible for obtaining required identification for newly assigned personnel.
The Contractor shall be responsible for prompt return of credentials and vehicle passes for: 1) any employee who no longer requires access to the work site; 2) upon request by a CO; and 3) upon completion or termination of the contract. The Prime Contractor shall ensure that all Base identification passes issued to employees and subcontractor employees are returned to the issuing office. Failure to comply with these requirements may result in withholding of payment.
Contractor employees are prohibited from possessing weapons, firearms or ammunition, on themselves or within Contractor-owned or privately owned vehicle while on Edwards AFB.
Due to 1030 being a controlled area a freezone will need to be put in place.
3.0 OPERATIONS SECURITY (OPSEC):
The Contractor shall comply with DOD, USAF, and locally established Operations Security (OPSEC) policies and procedures to protect sensitive and unclassified information and/or equipment, which is furnished to and operated by the Contractor, and prevent compromise of classified information and equipment.
Contractor shall maintain Operations Security (OPSEC) in accordance with DOD Directive & Manual 5205.02, DOD Operations Security (OPSEC) Program, AFI 10-701, Operations Security (OPSEC), and Edwards AFB OPSEC policies and procedures.
Completion of OPSEC Training of contractor employees offered by the Government IAW AFI 10- 701, para. 4.1 and 4.2.3 shall be required of all Contractor employees within 90 days of initiating work. Access to mission critical information will not be allowed until OPSEC education has been completed and documented. This training provides Contractor employees with the requisite knowledge necessary to remain vigilant for possible threats, understand basic security procedures, understand the obligation to report security violations and the continued obligation to safeguard information. The requiring unit Security Manager/OPSEC Coordinator will coordinate and track https://jkodirect.jten.mil/Atlas2/page/login/Login.jsf https://lms-jets.cce.af.mil/moodle/ https://lms-jets.cce.af.mil/moodle/ completed training with the Contractor.
Contact the unit Security Manager/OPSEC Coordinator or Wing OPSEC Signature Manager at (661) 277-2066 for questions or reporting.
4.0 ENVIRONMENTAL PROTECTION:
4.1 The Contractor shall comply with all applicable Federal, state and local laws, regulations and standards, including Air Force and installation policies, directives and instructions, that are or may become applicable to the Contractor’s activities in performance of this contract.
4.2 The Contractor shall comply with the most current Environmental Minimization Measures Checklist pertaining to this SOW (see attachment). During the course of work, the Contractor shall have a quality control and oversight procedure to ensure the requirements of the environmental checklist are met and documented.
5.0 SAFETY:
5.1 Safety and Health Requirements: It is the contractor's responsibility to ensure its employees and managers have a comprehensive understanding of OSHA requirements. Detailed information is available on the OSHA website at http://www.osha.gov. Contractors are responsible for complying with federal and state occupational safety and health standards for their employees, except where the Air Force contractually agreed to assume responsibility.
5.2 Safety and Health Plan. In accordance with AFI 91-202, The US Air Force Mishap Prevention Program, the contractor shall submit a Safety and Health Plan to the contracting office for review by the 412 TW/SEG. The plan will cover Fall Protection as one of the topics.
5.3 Mishap Reporting. The Contractor shall promptly report pertinent facts to the Government Program Office (GPO) regarding mishaps involving government personnel or property, on or off the Air Force Installation, incidental to work performed IAW DAFI 91-204, Safety Investigation and Hazard Reporting. Direct costs related to the mishap shall be separated from other cost and provided to the GPO and Safety Investigators. Direct costs related to the mishap shall be separated from other cost and provided to the GPO and Safety Investigators.
5.4 The Contractor is responsible for establishing requirements for all subcontractors who qualify as subcontractors under the resulting contract.
http://www.osha.gov/
| STATEMENT OF WORK (SOW) |
| AT |
| 1.0 DESCRIPTION OF SERVICES: |
| 2.0 SECURITY REQUIREMENTS: |
| Contractor employees are prohibited from possessing weapons, firearms or ammunition, on |
| themselves or within Contractor-owned or privately owned vehicle while on Edwards AFB. |
| Due to 1030 being a controlled area a freezone will need to be put in place. |
| 3.0 OPERATIONS SECURITY (OPSEC): |
| 4.0 ENVIRONMENTAL PROTECTION: |
| 5.0 SAFETY: |