This is a Determination & Findings (D&F) document for a sole source contract award issued by the Air Force Technical Center (AFTC/PZZG). The contracting activity seeks to award engineering and system integration services to Trimax Systems, LLC to modernize the 772nd Test Squadron's (772TS/EWOX) Electrical, Gas, and Water (EGW) control infrastructure at Building 1030, Edwards Air Force Base (EAFB).
The justification for the sole source award under RFO 13.101(b) (Noncommercial Products and Services) is that Trimax Systems, LLC is the only responsible source capable of performing the required work. The existing EGW control system was originally engineered and programmed by Trimax and relies entirely on their proprietary Programmable Logic Controller (PLC) and Human-Machine Interface (HMI) source code. Although the Government received interest from five vendors during the sources sought phase, all were deemed technically unacceptable as they lack access to Trimax's proprietary PLC/HMI source code necessary to perform upgrades without total system replacement. Using an alternate vendor would require complete reverse-engineering of the utility control network, resulting in estimated duplicate costs up to $500,000 that cannot be recovered through competition, and would cause unacceptable mission delays of 6-8 months for facility utility shutdowns. The determination notes that Trimax retains proprietary rights to customized software, programming, configurations, and intellectual property, and that modifications by other parties could compromise system functionality, operability, cybersecurity, safety, and reliability. The document was signed by Contracting Officer Karla Vazquez on August 13, 2026.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
intellectual property.
In addition, modifications to the existing PLC and HMI applications by parties other than Trimax may affect system functionality, operability, cybersecurity, safety, reliability, future support, and Trimax's ability to warrant or assume responsibility for the performance of the modified system.
Therefore, to preserve the system's technical integrity, avoid unnecessary and non-recoverable Government expenditures, and prevent critical mission downtime, Trimax Systems, LLC is the only source that can perform these integration services.
5. Determination: Based on the findings above, the proposed sole source or brand name action is justified under the applicable regulation.
6. Signatory Authority: (Contracting Officer Instruction: In accordance with DAF Approval Authorities Matrix PM 26-C-11 Matrix Item 51 for RFO 13.101(b) actions and GSAR 538.7104-3(a) for FSS orders, the Contracting Officer is the approval authority for these determinations).
Karla Vazquez Contracting Officer
Aug 13, 2026
VAZQUEZ MONTES.KARLA
LIZETTE.
Digitally signed by VAZQUEZ
MONTES.KARLA LIZETTE
Date: 2026.08.13 13:02:23 -07'00'
File details come from the government source that posted it. Updated .