SOW Attachment (8) Contractor Production Report Form.docx

DOCX document 23 KB Posted

Attached to
Building 77H Tank Farm Drainage Repairs
Solicitation number
N6449825Q4020
Issued by

About this file

This is a Contractor Production Report form template that serves as an attachment to the Statement of Work for the Building 77H Tank Farm Drainage Repairs project at the Philadelphia Navy Yard. The form is designed to capture daily construction activities and includes sections for weather conditions, work performed, safety meetings, work hours tracking, equipment and materials received, and construction equipment usage. The template requires contractors to document any safety incidents, hazardous material releases, or specialized work activities requiring additional safety measures (crane, manlift, trenching, scaffold, high voltage electrical, or hazardous materials work).

The form relates to a Naval Surface Warfare Center Philadelphia Division (NSWCPD) competitive construction contract being solicited as a 100% Small Business Set-aside under solicitation N6449825Q4020. The contract will be awarded as a Firm Fixed Price (FFP) agreement. A site visit is scheduled for March 12, 2025, with registration required by March 10, 2025 at 3 PM EST.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACTOR PRODUCTION REPORT

(ATTACH ADDITIONAL SHEETS IF NECESSARY)

DATE

CONTRACT NO
TITLE AND LOCATION

REPORT NO

Building 77H – Tank Farm Drainage Repairs

CONTRACTOR

SUPERINTENDENT

AM WEATHER

PM WEATHER

MAX TEMP (F)
MIN TEMP (F)

WORK PERFORMED TODAY

Schedule Activity No.

WORK LOCATION AND DESCRIPTION
EMPLOYER
NUMBER
TRADE
HRS

JOB

SAFETY

WAS A JOB SAFETY MEETING HELD THIS DATE?

|_| YES
|_| NO
TOTAL WORK HOURS ON JOB SITE,

THIS DATE, INCL CON'T SHEETS

WERE THERE ANY LOST TIME ACCIDENTS THIS DATE?

(If YES attach copy of completed OSHA report)

|_| YES
|_| NO
CUMULATIVE TOTAL OF WORK

HOURS FROM PREVIOUS REPORT

WAS CRANE/MANLIFT/TRENCHING/SCAFFOLD/HV ELEC/HIGH WORK/ HAZMAT WORK DONE?

(If YES attach statement or checklist showing inspection performed.)

|_| YES
|_| NO

TOTAL WORK HOURS FROM

START OF CONSTRUCTION

WAS HAZARDOUS MATERIAL/WASTE RELEASED INTO THE ENVIRONMENT?

(If YES attach description of incident and proposed action.)

|_| YES
|_| NO

Schedule Activity No.

LIST SAFETY ACTIONS TAKEN TODAY/SAFETY INSPECTIONS CONDUCTED
|_|
SAFETY REQUIREMENTS HAVE BEEN MET.

EQUIPMENT/MATERIAL RECEIVED TODAY TO BE INCORPORATED IN JOB (INDICATE SCHEDULE ACTIVITY NUMBER)

Schedule Activity No.

Submittal #
Description of Equipment/Material Received

CONSTRUCTION AND PLANT EQUIPMENT ON JOB SITE TODAY. INDICATE HOURS USED AND SCHEDULE ACTIVITY NUMBER.

Schedule Activity No.

Owner
Description of Construction Equipment Used Today (incl Make and Model)
Hours Used

Schedule Activity No.

REMARKS

CONTRACTOR/SUPERINTENDENT
DATE

Standard SOW Attachment (8) Contractor Production Report Form Sheet 1 of 1