SOW Attachment (11) Photographs.pdf
PDF 2 MB Posted
- Attached to
- Building 77H Tank Farm Drainage Repairs
- Solicitation number
- N6449825Q4020
About this file
This is a set of photographs (SOW Attachment 11) documenting existing conditions and planned work locations for Building 77H Tank Farm Drainage Repairs at the Philadelphia Navy Yard. The photos show the installation location and routing for a new sump pump system, including detailed views of the pump location, piping routes marked with blue lines, and an existing wastewater line that needs to be sealed with concrete. The document includes images of the truck-loading trough area, the existing Motor Control Center (MCC) with a spare Size 1 starter, the proposed location for a new disconnect and Hand-Off-Auto switch (marked with a red square), and the pipe/electrical rack that will route new electric lines from the MCC to power the new sump pump.
The photographs provide visual documentation across 5 pages showing key components of the drainage repair project, including both current infrastructure and planned modification points. Specific technical elements shown include a green-lined sump access point that requires plug/piping removal, concrete sealing locations for an oil-water separator valve connection, and the integration points between new and existing systems. The images serve as a visual guide for contractors to understand the scope and specific locations of required work in Building 77H.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOW ATTACHMENT 11
PHOTOGRAPHS
BUILDING 77H – TANK FARM DRAINAGE REPAIR
Sheet 1 of 5.
PHOTO 1 – BLDG 77H – New Sump Pump and Piping Location – Looking East PHOTO 2 – BLDG 77H – Looking Southeast
(Clear Circle) – New Sump Pump and Piping Location (Black Circle) – Existing wastewater line to be sealed with concrete (to oil-water separator valve)
Sheet 2 of 5.
PHOTO 3 – BLDG 77H – New Sump Pump Location – Remove Plug/piping as necessary to install new pump PHOTO 4 – BLDG 77H – Looking North – New Sump and Piping Location routing shown by blue line.
Not Used
PHOTO 5 – BLDG 77H – Looking North – New Sump and Piping Location routing shown by blue line.
Sheet 3 of 5.
PHOTO 6 – BLDG 77H – Looking West – Truck-Loading Trough Location PHOTO 7 – BLDG 77H – Looking West - Truck Loading Trough and Piping Location shown by blue line.
Sheet 4 of 5.
PHOTO 8 – BLDG 77H – Existing Motor Control Center (MCC) – Spare Size 1
Starter boxed PHOTO 9 – BLDG 77H – Looking West -- New Location for Disconnect and Hand-
Off-Auto Switch shown by red square.
Sheet 5 of 5.
Not Used
PHOTO 10 – BLDG 77H – Looking North – Utilize Pipe/Electrical Rack to route new electric lines from Motor Control Center (MCC) to new sump pump to power pump.
File details come from the government source that posted it. Updated .