This notice solicits proposals for duct cleaning and sealing services at Building 1000 at the Naval Surface Warfare Center in Philadelphia. Offerors must have active certifications from the National Air Duct Cleaning Association and Air Systems Cleaning Specialist and must be able to work on weekdays between 6 PM and 3:30 AM or weekends between 7 AM and 5:30 PM to minimize disruption. The performance period is 120 days for base work on units 7 through 10 with an optional 60 days for units 5 and 6. Bonding and liquidated damages apply, and the source selection will evaluate past performance, certifications, and price using a lowest-price technically acceptable process. Proposals are due by November 23, 2021 and the Department of the Navy Naval Sea Systems Command will award a contract without discussions based on initial offers.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACTOR PRODUCTION REPORT
(ATTACH ADDITIONAL SHEETS IF NECESSARY)
DATE
| CONTRACT NO |
| TITLE AND LOCATION |
REPORT NO
Building 1000 – Air Handlers AS-5 and 6 Repairs
CONTRACTOR
SUPERINTENDENT
AM WEATHER
PM WEATHER
| MAX TEMP (F) |
| MIN TEMP (F) |
WORK PERFORMED TODAY
Schedule
Activity No.
| WORK LOCATION AND DESCRIPTION |
| EMPLOYER |
| NUMBER |
| TRADE |
| HRS |
JOB
SAFETY
WAS A JOB SAFETY MEETING HELD THIS DATE?
FORMCHECKBOX
YES
FORMCHECKBOX
NO
TOTAL WORK HOURS ON JOB SITE,
THIS DATE, INCL CON'T SHEETS
WERE THERE ANY LOST TIME ACCIDENTS THIS DATE?
(If YES attach copy of completed OSHA report)
FORMCHECKBOX
YES
FORMCHECKBOX
NO
CUMULATIVE TOTAL OF WORK
HOURS FROM PREVIOUS REPORT
WAS CRANE/MANLIFT/TRENCHING/SCAFFOLD/HV ELEC/HIGH WORK/ HAZMAT WORK DONE?
(If YES attach statement or checklist showing inspection performed.)
FORMCHECKBOX
YES
FORMCHECKBOX
NO
TOTAL WORK HOURS FROM
START OF CONSTRUCTION
WAS HAZARDOUS MATERIAL/WASTE RELEASED INTO THE ENVIRONMENT?
(If YES attach description of incident and proposed action.)
FORMCHECKBOX
YES
FORMCHECKBOX
NO
Schedule
Activity No.
| LIST SAFETY ACTIONS TAKEN TODAY/SAFETY INSPECTIONS CONDUCTED |
| FORMCHECKBOX |
SAFETY REQUIREMENTS HAVE BEEN MET.
EQUIPMENT/MATERIAL RECEIVED TODAY TO BE INCORPORATED IN JOB (INDICATE SCHEDULE ACTIVITY NUMBER)
Schedule
Activity No.
| Submittal # |
| Description of Equipment/Material Received |
CONSTRUCTION AND PLANT EQUIPMENT ON JOB SITE TODAY. INDICATE HOURS USED AND SCHEDULE ACTIVITY NUMBER.
Schedule
Activity No.
| Owner |
| Description of Construction Equipment Used Today (incl Make and Model) |
| Hours Used |
Schedule
Activity No.
REMARKS
| CONTRACTOR/SUPERINTENDENT |
| DATE |
SOW Attachment (8) Sheet 1 of 1