Roofs

SOW Attachment 3 of Roofing Mainteance ContractRev 10 Jul 2020
Table 3.1, Quarterly Roof / Gutter / Drain cleaning -- Cleaning to be conducted at the following intervals: 15 to 31 March; 01 to 15 June; 15 to 30 September; and, 15 and 30 November with an annual inspection conducted during the March cleaning.
Building or Area DesignationRoof TypeApprox. SFPitchParapetDate of Roof ConstructionWarranty - ManufacturerRoof Access (See Note 2)Notes
29 (Roof A)Corrugated Alum.18,6027/12Approx. 1980Coating - MuleHide (Karnak 2018)High reach / ladder
29 (Roofs B-E)Asphalt Built-up8,686FlatYes2006 - MidAtlanticExt. stairway
29 (Roofs F-H)Asphalt Built-up1,726FlatYes2006 - MidAtlanticExt. stairway
4 (Roofs A-I, K)Standing seam painted alum.33,8162/12 - 5/12Approx. 1985High reach / ladder
4 (Roofs J & L)Standing seam painted alum.14,5625/122009American Alliance/Merchant & EvansHigh reach / ladder
4 (Roofs M,O,Q)Mod. bit., 3-ply Built-up, w/ cap1,600FlatNo2004 - Eagle RoofingTremco 20-year warranty (2004)Int. Stairs / elevator
4 (Roofs N,R,P)4 ply modified with cap14,000FlatNo2007 - R.L. CampbellTremco 5-year TPW (2004)Int. Stairs / elevator
633 (Roofs A & B)Modified Bitumen12,900FlatYes2011 Brown and GuarinoGAF 20 Year (2031)Penthouse/Ext Ladder
633 (Roof C)Asphalt Built-up w/insul.35,784FlatYes1997Tremco 5-year warranty (2001)Int. Stairs / Ladder
633 (Roofs D1 & D2)Smooth-surface Asphalt Built-up13,040FlatPartial1997Tremco 5-year warranty (2001)Int. Stairs / Ladder
633 (Roof E)Smooth-surface Asphalt Built-up17,990FlatYesApprox. 1985Int. Stairs / Ladder
633 (Roof F)4-ply Asphalt BUR w/ syn cap sheet34,536FlatYes2007KalimexInt. Stairs / Ladder
Areas 519/520 (Roofs A) of Bldg 6330.060 EPDM17,635FlatNoApprox. 2002Ext. ladder
Areas 519/520( B-H; L-O) of Bldg 633Asphalt Built-up w/insul.UNKFlatNoApprox. 2002Ext. ladder
Area 824 of Bldg 633
531
745 (Roofs A-C)4-ply Asphalt Built-up - smooth4,177Approx. 2000Ext. ladder
756 (Roofs A-C)4-ply Asphalt BUR & corrugated11,2312007 - BenakaExt. Ladder
77H (Roofs A&E)Mod. bit., 3-ply Built-up, w/ cap70,000FlatPartial2004 - Eagle RoofingTremco 20-year warranty (2004)Int. / Ext. Ladders
77H (Roofs B,C,D)Standing seam painted alum.72,9307/12No2009Kalimex/Merchant & EvansInt. / Ext. Ladders
77H (Roof F)0.060 EPDM - fully adhered2,880FlatNo1987Int. / Ext. Ladders
77H East Locker RoomTPO 60 mil2,000FlatPartial2011 Johnson/Pro ComJohnson RoofingLadder/High Reach
77L (High roofs)EPDM - 0.090 mil (over SPUF)94,000FlatYes2005 MidAtlantic2001 Company Inc. 20-yearExt. Ladder
77L (Low roofs)Mod. bit., 3-ply Built-up, w/ cap48,000FlatNo2003 Boro Const.Johns Manville 20-yearExt. LadderInterior Roofs are bounded by walls
87 (Roofs A-I)Standing seam painted alum. Mod Bit Valleys106,150Yes2007 BenakaExt. Ladder
87 (Roof J)0.060 EDPM - fully adhered6,900FlatApprox. 2001Ext. Ladder
10323,750FlatExt. Ladder

Table 3.2, Semi-annual Roof / Gutter / Drain cleaning -- Cleaning to be conducted at the following intervals: 15 to 30 April and 01 to 15 December with an annual inspection conducted during the April cleaning.

Building or Area DesignationRoof-typeApprox. SFPitchParapetDate of Roof ConstructionWarranty - ManufacturerRoof Access (See Note 2)Notes
666Asphalt Built-up w/insul.2,000FlatYes
771TPO 60 mil3,400FlatNo2011 Johnson/Pro ComJohnson RoofingExt. ladder
7760.060 EPDM2,268FlatApprox. 1998Ext. ladder
1000 (Roofs H&J)Smooth-surface Asphalt Built-up484FlatNo2012 Persaud/BelcherJohns-ManvilleInt. Stairs / elevator
1000 (Roof I)4-ply Asphalt Built-up w/insul.3,800FlatNo2012 Persaud/BelcherJohns-ManvilleInt. Stairs / elevator
1000 (Roofs A-G)4-ply Asphalt Built-up w/insul.100,126FlatNo2012 Persaud/BelcherJohns-ManvilleInt. Stairs / elevator
542 (Roofs A-C)4-ply Asphalt Built-up w/insul.107,730FlatNoApprox. 2000Tremco 20-year warranty (2004)Ext. ladder
Notes:
1. Deleted.
2. If "Ladder" or "High reach / ladder" is noted, then contractor must provide a means of access during cleaning and inspection.
3. Inspection shall consist of visual examination of roof and drainage system for damage or excessive wear. Inspection report shall be submitted to
the Government within 7 calendar days of completion of each inspection. Contractor shall submit a written estimate for any repairs needed.
4. Cleaning shall include removal of all debris (leaves, silt, litter and other foreign matter) from roof drains, roof surface, gutters and downspouts.