SOW Attachment (2) Conceptual Design Room Finishes and Pictures.pdf
PDF 7 MB Posted
- Attached to
- Bldg 4- 3rd Floor HVAC Repair (Phase 1)
- Solicitation number
- N6449824Q5048
About this file
This document package includes a Statement of Work attachment and related federal contract opportunity solicitation. The Statement of Work attachment provides conceptual design drawings and pictures for repair of the HVAC system on the third floor pavilion area of Building 4 at the Philadelphia Navy Business Center. The repair work includes installing a new return duct system, return grilles, exhaust dampers, and patching and painting existing grilles.
The related federal contract opportunity solicitation is seeking proposals for the Bldg 4- 3rd Floor HVAC Repair (Phase 1) project. The Naval Surface Warfare Center Philadelphia Division will award a firm-fixed-price construction contract to repair the HVAC system. This is a 100% small business set-aside requirement, with a site visit scheduled for March 19, 2024. Proposals are due by the closing date of April 4, 2024. The soliciting agency is the Department of the Navy Naval Sea Systems Command.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
robert.nazian Polygonal Line robert.nazian Polygonal Line robert.nazian Polygonal Line robert.nazian Polygonal Line robert.nazian Line robert.nazian Line robert.nazian Line robert.nazian Text Box robert.nazian Text Box robert.nazian Text Box robert.nazian Line robert.nazian Line robert.nazian Line robert.nazian Line robert.nazian Line robert.nazian Line robert.nazian Polygonal Line robert.nazian Polygonal Line robert.nazian Polygonal Line robert.nazian Text Box Return Grill (RG)-
1,000 CFM
robert.nazian Line robert.nazian Text Box New Return Damper and actuator.
robert.nazian Text Box Balancing Damper robert.nazian Text Box Turning Vanes robert.nazian Text Box robert.nazian Text Box
NEW WORK IN RED
robert.nazian Text Box Conceptual Return Duct - View 1 neal.j.moran Rectangle neal.j.moran Text Box SOW Attachment 2 Bldg 4 3rd Floor Pavilion Repair Project -- Phase 1 Conceptual Design, Room Finishes, and Pictures robert.nazian Text Box Return Grill (RG)-
700 CFM
robert.nazian Text Box
RG- 1,000 CFM
robert.nazian Text Box
RG- 1,000 CFM
neal.j.moran Text Box Install New Exhaust Damper neal.j.moran Line neal.j.moran Text Box Existing Outside Air Exhaust Damper neal.j.moran Line neal.j.moran Line neal.j.moran Line neal.j.moran Line neal.j.moran Text Box Demolish, Patch, and Paint Grille neal.j.moran Line robert.nazian Polygonal Line robert.nazian Line robert.nazian Polygonal Line robert.nazian Text Box Conceptual Return Duct - View 2 robert.nazian Line neal.j.moran Rectangle neal.j.moran Text Box SOW Attachment 2 Bldg 4 3rd Floor Pavilion Repair Project -- Phase 1 Conceptual Design, Room Finishes, and Pictures robert.nazian Text Box
NEW WORK IN RED
neal.j.moran Text Box Install New Exhaust Damper neal.j.moran Text Box Demolish, Patch, and Paint Grille neal.j.moran Line
Line
Stamp neal.j.moran Text Box SOW Attachment 2 Bldg 4 3rd Floor Pavilion Repair Project -- Phase 1 Conceptual Design, Room Finishes, and Pictures
Bldg 4 – 3rd Floor Pavilion Area
PHOTO 1 – Looking South– 3rd Floor Pavilion Area – New Return Duct system to be installed.
Text Box SOW Attachment 2 Bldg 4 3rd Floor Pavilion Repair Project -- Phase 1
PHOTO 2 – Southeastern Grilles -- Left to be replaced with new Exhaust Damper.
Right Grille to be removed and wall Patched/Painted
PHOTO 3 – Southwest Grille – Existing Return Air to AHU-8.
neal.j.moran Callout Existing Return to AHU-8 neal.j.moran Callout Demolish grill, Patch and paint hole to match existing neal.j.moran Callout Install new Exhaust damper within Plenum area of wall.
neal.j.moran Text Box SOW Attachment 2 Bldg 4 3rd Floor Pavilion Repair Project -- Phase 1
| SOW Attachment (2) Conceptual Design, Room Finishes, and Pictures |
| BLDG4-81394_Conceptual Return Duct - View 1 |
| BLDG4-81394_Conceptual Return Duct - View 2 |
| Blank Page |
Photographs -- 3rd Floor Pavilion
File details come from the government source that posted it. Updated .