This document contains a scope of work attachment for an electrical background and noise study related to a federal contract opportunity for constructing a new inpatient pharmacy. The scope of work attachment provides details on evaluating and designing the normal and emergency electrical power infrastructure for the new pharmacy building and surrounding campus. It also outlines requirements for conducting a baseline noise level study, including ambient sound level measurements over a minimum of 160 continuous hours at multiple locations using sound level meters meeting ANSI standards. The noise study will assess potential operational noise impacts and compare measured interior noise levels to applicable NC curves to identify desirable background noise limits for different room types. The construction documents must require the contractor to perform a post-construction noise measurement survey. The scope of work also specifies submittal dates for an initial noise study data summary and final noise study memorandum during the 10% and 35% design phases.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SOW Attachment 10 - Underground Utilities Map.pdf | ||
| SOW Attachment 08 - WR Campus Map.pdf | ||
| SOW Attachment 07 - Legionella Sensitive Infrastructure.pdf | ||
| SOW Attachment 05 - CPM Schedule.docx | DOCX document | |
| SOW Attachment 03 - General Design Comments.docx | DOCX document | |
| SOW Attachment 01 - Req Div 01 Specs Section.docx | DOCX document | |
| 36C77624R0004_1.docx | DOCX document | |
| SOW Attachment 02 - PG 18-12 Pharmacy Service.pdf | ||
| SOW Construct New Inpatient Pharmacy.docx | DOCX document | |
| SOW Attachment 09 - SHPO Notification Guide.pdf | ||
| SOW Attachment 06 - AE Submission Instructions.pdf | ||
| SOW Attachment 04 - Sensitive Infrastructure.pdf | ||
| PPQ - Minor Design IP Pharmacy Columbia.docx | DOCX document |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1.0 Electrical Power Evaluation and Design.
West Roxbury campus use 4.16 KV at the switch gear building #70 which were transformed from 23.9 KV from the utility. From switch gear building will then transform to 480V for each building. The switch gear building #70 is located near spring street entrance. Building #2 consists of 2 normal power with 2500A and 1200A on secondary bus; Building #1 consists of 2 normal power with 1200A each on secondary bus.
The existing emergency power system consists of two emergency generators for building #2 with each sized at 600KW and 750KW, two emergency generators for building #1 with each sized at 600KW.
Investigate and evaluate the normal and emergency power infrastructure and provide recommendations and design for a normal and emergency distribution system for new building. Design work shall include, but it not limited to, the following: new duct bank, manholes, structural pads, storage tanks, stack, foundations, stairs/platforms, fire alarm, lighting, site security with an upgrade to existing normal and emergency system.
2.0 Noise Emission Study.
Measure and review baseline noise levels. Provide base line ambient sound level measurements at the location for the new pharmacy building:
The intended objective is to assess the potential impact of operational noise from the new equipment on affected activities and interior building spaces (offices, in-patient rooms, clinics, etc.). Utilize the Noise Criterion (NC) curves, to identify desirable limits of background noise for different interior spaces. Sound measurements performed at interior locations shall be compared to the applicable NC Levels for the applicable type of room.
Ambient sound level measurements shall be performed using instruments that meet ANSI S1.4- 1983 standards for Type 1 sound level meters and that possess real-time frequency analysis capabilities (e.g., the Larson Davis Model 831 or 824 sound level meters, or equivalent). The sound level meters shall be programmed to sample and store A-weighted sound level data including equivalent sound levels (Leq) and percentile levels (Ll , LI O, L33, L50, L90, and L99). The frequency content (in octave bands) of the existing acoustic environment shall be sampled and stored to determine compliance.
A-E shall utilize up to five (5) monitors to collect simultaneous ambient sound level data for a minimum period of 160 continuous hours at each measurement location. Ambient sound levels shall be sampled and stored for time intervals of no more than I -hour in duration. Except during periods of deployment and retrieval, the intent is to leave the monitors unattended (that is, no observer will be present) at each measurement location.
To the extent possible, the compliance noise measurement program shall be scheduled for periods with forecast weather conditions suitable for sound level measurements (i.e., no precipitation, low wind speeds, etc.). Monitor the weather forecast for the area prior to deploying the equipment. Construction documents shall require the contractor to provide post-construction compliance noise measurement survey. Perform operational noise measurements at the same locations that will be utilized during the pre-construction measurements using instrumentation with the same technical specifications. Utilize data to develop noise abatement strategy for the new equipment to include operational restrictions. Submit a Noise Study Data Summary with the 10% Design Submittal. Submit the Final Noise Study Memorandum including recommendations with the Design Analysis Report submitted with the 35% Design Submittal.