About this file
The document provided is the Statement of Work (SOW) Attachment 06 - VHA Required Division 01 Specification Section List. It outlines the required Division 01 - General Requirement specification sections for this project, which include general requirements, scheduling, submittals, safety, quality control, and commissioning.
The related federal contract opportunity is a Request for Qualifications (SF 330) for Architect/Engineering (A/E) services to design security upgrades at the Bangor and Lewiston Community Based Outpatient Clinic (CBOC) locations. The project involves alterations and modifications to the existing spaces to resolve security deficiencies. The Period of Performance is 83 calendar days, and the SF 330 package is due on June 28, 2024 by 4:30 PM EST. This procurement is a total set-aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB).
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SOW Attachment 05 - PIV Request Form.docx | DOCX document | |
| SOW Final.docx | DOCX document | |
| Special Notice Request For Qualifications SF330.docx | DOCX document | |
| SOW Attachment 04 - Seasonal Influenza with Vaccines.pdf | ||
| 36C24124R0077.docx | DOCX document | |
| SOW Attachment 03 - Portland Reception Desk.pdf | ||
| SOW Attachment 01 - Bangor Floorplan.pdf | ||
| SOW Attachment 08 - VHA Directive 1061 Prevention of Healthcare Associated Legionella Disease.pdf | ||
| SOW Attachment 07 - Sensitive Infrastructure Data Classification FOUO.pdf | ||
| SOW Attachment 02 - Lewiston Floorplan.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VHA Required Division 01 – General Requirement Specification Sections
* Note that these have been identified as required Division 01 specifications for this project. It is the responsibility of the contractor to determine if there are other specifications to include.
01 00 00 – General Requirements 01 32 16.01 - Architectural and Engineering CPM Schedules 01 32 16.15 – Project Schedules (Small Projects – Design/Bid/Build) 01 33 23 - Shop Drawings, Product Data, and Samples 01 35 26 – Safety Requirements 01 42 19 – Reference Standards 01 45 00 - Quality Control 01 45 29 – Testing Laboratory Services 01 57 19 - Temporary Environmental Controls 01 74 19 – Construction Waste Management 01 81 13 – Sustainable Construction Requirements 01 91 00 - General Commissioning Requirements