SOW Attachment 05 - Fiber Optic Distribution Site Plan.pdf

PDF 9 MB Posted

Attached to
C1DA--AE-NRM-687-26-100 Modernize Physical/Electronic Security Systems
Solicitation number
36C26026Q0146
Issued by

About this file

This document is a comprehensive set of record drawings for a telecommunications infrastructure upgrade project at the VA Walla Walla medical campus. The project involves replacing existing fiber optic and copper backbone cabling across the entire campus, including new vaults, conduits, and pathways for primary and secondary fiber loop infrastructure. The scope includes routing new fiber optic cables between multiple buildings (Buildings 1, 63, 65, 68, 74, 75, 76, 77, 78, 80, 81, 82, 135, 143, 145, and others) using innerduct and supporting J-hooks, with factory-terminated MPO connectors for building-to-building and in-building connections. The drawings detail the telecommunication infrastructure plans, site plans, demolition plans, and technical details for conduit penetrations and equipment mounting, with specifications for both fiber and copper voice backbone systems.

The project documents include detailed technical requirements such as routing new 24-strand and 48-strand singlemode and multimode fiber optic cables, installing new communication cabinets, and removing existing infrastructure after new systems are operational. The design emphasizes careful coordination, with contractors required to verify cable lengths, provide service loops, and coordinate with VA Contracting Officer Representatives (COR). The project covers multiple buildings' telecommunications rooms, including Main Distribution Frames (MDF) and Intermediate Distribution Frames (IDF), with a focus on creating a robust, modern telecommunications infrastructure that supports the VA Walla Walla medical campus's communication needs.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

X

X

X X

X

X

X

X

XX

X X

X

X XXXXX X

X X

X

X

X

X

X

X

X

STATE NURSING HOME

STATE NURSING HOME

STATE NURSING HOME

STATE NURSING HOME

FU

TU

R E

S

TA

TE

N

U R

S

IN

G H

O M

E

FU

TU

R E

B

LD

G

7 49 48

66T-7

77T-1

T-2

756968

116119

121126125124

CM

147 146

WATER TOWER

141 X

X X

X X

X

X

X

X

XX

X X

X

X XXXXX X

X X

X

X

X

X

X

X

X

STATE NURSING HOME

STATE NURSING HOME

STATE NURSING HOME

STATE NURSING HOME

FU

TU

R E

S

TA

TE

N

U R

S

IN

G H

O M

E

FU

TU

R E

B

LD

G

7 49 48

66T-7

77T-1

T-2

756968

116119

121126125124

CM

147 146

WATER TOWER

GI001

U.S. Department of Veterans Affairs

VA WALLA WALLA - FIRE LIFE SAFETY - PHASE A

1 PROJECT LOCATION

SCALE: NTS

RECORDS DOCUMENT

77 WAINWRIGHT DRIVE

WALLA WALLA, WA 99362

SCALE: NTS

COVER SHEET

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

RECORDS DOCUMENTOffice of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Hood River Engineers 1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128 Dave Clem

VA WALLA WALLA FIRE LIFE

SAFETY REPLACEMENT - PHASE A

WALLA WALLA, WA

687-18-101

Project Director

Revisions: Date:

FLS

06/05/23 DJC ANH

DRAFT DESIGN DEVELOPMENT 08/03/20

RECORDS DOCUMENT

FINAL DESIGN DEVELOPMENT 09/10/20

65% SUBMITTAL 10/23/20

95% CONSTRUCTION DOCUMENTS 12/07/20

FINAL CONSTRUCTION DOCUMENTS 01/05/21

RECORDS DOCUMENT 06/05/23

PROJECT DESCRIPTION

THIS PROJECT SHALL REPLACE EXISTING FIBER OPTIC CABLING WITH NEW HIGHER PERFORMANCE FIBER OPTIC CABLING AND REPLACE EXISTING COPPER BACKBONE SYSTEM ACROSS THE ENTIRE CAMPUS AS WELL AS IN THE BUILDINGS FROM MDFS TO IDFS. PROJECT INCLUDES NEW VAULTS AND CONDUIT FOR SECONDARY FIBER LOOP INFRASTRUCTURE, NEW CONDUIT AS SHOWN UTILIZING EXISTING VAULTS AND NEW VAULTS FOR PRIMARY

PATHWAYS TO BUILDINGS AND NEW PATHWAYS FOR COPPER BACKBONE TO BUILDINGS.

C CENTERLINE

Δ DEFLECTION

° DEGREES

⌀ DIAMETER

" INCHES

' FEET

# NUMBER

x BY (i.e. 2x4)

ABS ACRYLONITRILE BUTADIENE STYRENE

A/C AIR CONDITIONING

ACT ACOUSTICAL CEILING TILE

AISC AMERICAN INSTITUTE OF STEEL CONSTRUCTION

AITC AMERICAN INSTITUTE OF TIMBER CONSTRUCTION

AFF ABOVE FINISH FLOOR

ALT ALTERNATE, ALTERNATIVE

ANSI AMERICAN NATIONAL STANDARD INSTITUTE

ASCE AMERICAN SOCIETY OF CIVIL ENGINEERS

ASTM AMERICAN SOCIETY OF TESTING AND MEASUREMENT

AWS AMERICAN WELDING SOCIETY

BATT BATT INSULATION

BLDG BUILDING

BLK BLOCK

BLKG BLOCKING

BO BOTTOM OF

BOC BACK OF CURB

BOCA BUILDING OFFICIALS CODE ADMINISTRATORS

BOT BOTTOM

CB CATCH BASIN

Ce SNOW EXPOSURE FACTOR

CFCI CONTRACTOR FURNISHED CONTRACTOR INSTALLED

CFOI CONTRACTOR FURNISHED OWNER INSTALLED

CG CORNER GUARD

CJ CONTROL JOINT

CL CENTER LINE

CLR CLEARANCE

CMU CONCRETE MASONRY UNIT

CO COMPANY

CO2 CARBON DIOXIDE

CPT CARPET

CS SEISMIC RESPONSE COEFFICIENT

CSC CONVENTION FOR SAFE CONTAINERS

CT SNOW THERMAL FACTOR

CTR CENTER

d PENNY

DEMO DEMOLITION

DF DOUGLAS FIR

DIA DIAMETER

DIM DIMENSION

DN DOWN

DW DISHWASHER

DOR DESIGNER OF RECORD

(E) EXISTING

EA EACH

EIT ENGINEER IN TRAINING

EJ EXPANSION JOINT

EL ELEVATION

EXT EXTENSION OR EXTERIOR

F&I FURNISH AND INSTALL

FA FIRE ALARM

Fa SEISMIC SITE COEFFICIENT Fb BENDING STRENGTH OF WOOD f'c COMPRESSIVE STRENGTH OF CONCRETE

FE FIRE EXTINGUISHER AND BRACKET

FEC FIRE EXTINGUISHER CABINET

FF FINISHED FLOOR

FND FOUNDATION

FO FACE OF

FOF FACE OF FINISH

FOM FACE OF MASONRY

FOS FACE OF STUD

FOW FACE OF WALL

FT FEET

FT3 CUBIC FEET

Fv BASE SHEAR Fy YIELD STRENGTH OF STEEL

G GRAVITY

GA GAUGE

GALV GALVANIZED

GCPI INTERNAL PRESSURE COEFFICIENT

GYP GYPSUM

GYPSH GYPSUM SHEATHING

HAC HOUSEKEEPING AID CLOSET

HP HELICAL PIER

HSK HOUSEKEEPING

HSS HOLLOW STEEL SECTION

HT HEIGHT

HVAC HEATING, VENTILATION, & AIR CONDITIONING

I INERTIA

IBC INTERNATIONAL BUILDING CODE

ICBO INTERNATIONAL COMMITTEE OF BUILDING OFFICIALS

ICRA INFECTION CONTROL RISK ASSESSMENT

IDF INTERMEDIATE DISTRIBUTION FRAME

ILSM INTERIM LIFE SAFETY MEASURE

IN INCHES

ISO INTERNATIONAL ORGANIZATION FOR

STANDARDIZATION

ƪW WELD LENGTH

JAN JANITOR

JC JANITOR'S CLOSET

k STIFFNESS

KG KILOGRAM

KGS KILOGRAMS

KIP 1000 POUNDS

KSI KIPS PER SQUARE INCH

LAV LAVATORY

LBS POUNDS

MAX MAXIMUM

MDF MAIN DISTRIBUTION FRAM

MI MIRROR

MIN MINIMUM, MINUTE

MINS MINUTES

MM MILLIMETER

MPH MILES PER HOUR

(N) NEW

NER NATIONAL EVALUATION REPORT

NES NATIONAL EXPORT SYSTEM

NIC NOT IN CONTRACT

NO. NUMBER

NSF NET SQUARE FEET

NTS NOT TO SCALE

OC ON CENTER

OCEW ON CENTER EACH WAY

OD OVERFLOW DRAIN

OFCI OWNER FURNISHED CONTRACTOR INSTALLED

OFOI OWNER FURNISHED OWNER INSTALLED

OH OVERHEAD

OR OREGON

OSB ORIENTED STRAND BOARD

OSSC OREGON STRUCTURAL SPECIALTY CODE

PCS PIECES

PE PROFESSIONAL ENGINEER

Pf SNOW LOAD FLAT ROOF Pg SNOW LOAD GROUND

PL PLATE OR PROPERTY LINE

PLS PROFESSIONAL LAND SURVEYOR

Ps SNOW LOAD SLOPED ROOF

PSF POUNDS PER SQUARE FOOT

PSI POUNDS PER SQUARE INCH

PT PRESSURE TREATED

PWD PLYWOOD

QTY QUANTITY

R RADIUS, RIGIDITY, RESISTANCE,

RD ROOF DRAIN

REF REFERENCE

REQD REQUIRED

RF RESILIENT FLOORING

RHO REDUNDANCY FACTOR

RM ROOM

RO ROUGH OPENING

SBCI SUSTAINABLE BUILDINGS AND CONSTRUCTION

INITIATIVE

SDS DESIGN SPECTRAL ACCELERATION, 0.2 SEC

SEC SECONDS

SPEC SPECIFICATION

SF SQUARE FEET

SQ MM SQUARE MILLIMETER

Ss MAPPED ACCELERATION PARAMETER

SS STAINLESS STEEL

SYM SYMBOL OR SYMETRICAL

T&G TONGUE AND GROOVE

TD TRENCH DRAIN

THK THICK(NESS)

TO TOP OF

TOD TOP OF DECK

TOP TOP OF PARAPET

TOS TOP OF SLAB

TOW TOP OF WALL

TYP TYPICAL

U ULTIMATE CAPACITY

UNO UNLESS NOTED OTHERWISE

VCT VINYL COMPOSITE TILE

VERT VERTICAL

VIF VERIFY IN FIELD

W/ WITH

WD WOOD

WH WATER HEATER

WPS WELDED PROCEDURE SPECIFICATION

WWF WELDED WIRE FABRIC

TYPICAL ABBREVIATIONS

GENERAL PROJECT NOTES

1. IT IS SUGGESTED THAT THE CONTRACTOR VISIT THE PROJECT SITE PRIOR TO BIDDING TO BECOME FAMILIAR WITH THE EXISTING SITE CONDITIONS, SECURITY PROVISIONS, LAYDOWN AREA AND OTHER

SITE SPECIFIC GENERAL CONDITIONS WHICH MAY AFFECT THE BID VALUE OF THIS PROJECT.

2. THE DRAWINGS SHALL BE WORKED IN CONJUNCTION WITH THE SPECS. THE SPECS FORMS A PART OF

THE CONTRACT DOCUMENTS AND CONTAINS ADDITIONAL INFORMATION REQUIRED TO CONSTRUCT

THE WORK OF THIS CONTRACT. IN THE EVENT OF A CONFLICT BETWEEN THE DRAWINGS AND THE

SPECS NOTIFY THE COR FOR CLARIFICATION SEVEN DAYS BEFORE BEGINNING WORK ON THE

AFFECTED ACTIVITIES.

3. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS PRIOR TO THE START

OF WORK. NOTIFY THE COR OF ANY SIGNIFICANT CHANGES IN DIMENSIONS OR CONDITIONS.

4. THE CONTRACTOR SHALL PROVIDE ALL MATERIALS, TOOLS, EQUIPMENT AND NECESSARY FACILITIES, AND PERFORM ALL LABOR AND SERVICES OF EVERY DESCRIPTION AS MAY BE NECESSARY TO

COMPLETE THE SCOPE OF WORK DEFINED ON THE DRAWINGS AND SPECS.

5. THE CONTRACTOR SHALL ARRANGE FOR AND OBTAIN ALL VA ISSUED PERMITS (HOTWORK, ICRA, SATURDAY, SHUTDOWN, ETC.), CERTIFICATES, INSPECTIONS, DEPARTMENT APPROVALS, ETC. FOR

WORK PERFORMED UNDER THIS CONTRACT. PROVIDE COPIES OF ALL REQUIRED PERMITS,

CERTIFICATES, INSPECTIONS AND AGENCY APPROVALS TO THE ENGINEER INCLUDING BUT NOT

LIMITED TO ICRA AND IFLS.

6. FABRICATE AND INSTALL ALL WORK IN STRICT ACCORDANCE WITH THE SPECS, ALL APPLICABLE STATE

AND LOCAL CODES, AND THE GENERAL AND SUPPLEMENTARY CONDITIONS OF THE CONTRACT.

7. ALL CONTRACTORS AND SUBCONTRACTORS SHALL BE RESPONSIBLE FOR THE PROPER

PERFORMANCE OF THEIR WORK, COORDINATING WITH OTHER TRADES, MEANS AND METHODS OF

CONSTRUCTION, SAFETY AND SECURITY ON SITE.

8. CUTTING AND PATCHING SHALL BE PERFORMED BY EACH TRADE AS NECESSARY FOR THE

PERFORMANCE AND INSTALLATION OF THEIR WORK. CUTTING AND PATCHING SHALL BE PERFORMED

IN A WORKMANLIKE MANNER CONSISTENT WITH INDUSTRY STANDARDS FOR FINISHES AND

SUBSTRATES AFFECTED.

9. THE CONTRACTOR SHALL PROTECT THE FACILITY FROM WEATHER AND MAINTAIN SECURITY DURING

ALL CONSTRUCTION WORK.

10. PROTECT EXISTING PROPERTY DURING CONSTRUCTION. REPAIR OR REPLACE, WITHOUT ADDITIONAL CHARGE TO THE OWNER, ANY EXISTING WORK DAMAGED DURING THE COURSE OF CONSTRUCTION.

11. THE WORK SHALL BE COORDINATED IN GOOD FAITH WITH THE A/E AND ALL GOVERNMENT EMPLOYEES

14 DAYS IN ADVANCE OF BEGINNING EACH CONSTRUCTION ACTIVITY.

12. UNLESS ITEMS OF MATERIAL, EQUIPMENT OR WORK ARE SPECIFICALLY NOTED TO BE PROVIDED OR

FURNISHED BY OTHERS, THEY SHALL BE PROVIDED UNDER THIS CONTRACT.

13. ALL WORK SHALL BE PERFORMED BY SKILLED WORKERS IN A WORKMANLIKE AND PROFESSIONAL

MANNER CONSISTENT WITH INDUSTRY STANDARDS.

14. MATERIALS AND COMPONENTS AS SPECIFIED CONSTITUTE A STANDARD OF QUALITY, UNLESS

OTHERWISE NOTED. EQUAL SUBSTITUTES WILL BE ACCEPTABLE ONLY WITH WRITTEN PRIOR

APPROVAL BY THE CONTRACTING OFFICER SEVEN DAYS BEFORE BIDS ARE DUE. DO NOT ASSUME

EQUALITY AND SUBMIT SHOP DRAWINGS FROM ALTERNATE VENDORS WHO HAVE NOT BEEN

APPROVED IN WRITING BY THE ENGINEER. IN THE EVENT THIS HAPPENS, THE CONTRACTOR SHALL PROVIDE THE SYSTEM USED IN THE BASIS OF DESIGN AT NO ADDITIONAL COST TO THE OWNER.

15. THE CONTRACTOR SHALL LEAVE THE SITE IN PROPER WORKING ORDER AND SHALL, WITHOUT ADDITIONAL CHARGE, REPLACE ANY WORK, MATERIALS, OR EQUIPMENT FURNISHED AND INSTALLED

UNDER THE CONTRACT WHICH DEVELOPS DEFECTS, EXCEPT FROM ORDINARY WEAR AND TEAR,

WITHIN ONE (1) YEAR FROM THE DATE OF FINAL ACCEPTANCE BY THE OWNER.

16. CONTRACTOR SHALL SCHEDULE, COORDINATE, AND FACILITATE ALL POWER OUTAGES AND

SHUTDOWNS. POWER OUTAGES AND SHUTDOWNS MUST BE SCHEDULED WITH THE VA COR, 1-WEEK

PRIOR TO OUTAGE.

BASIC DEFINITIONS

"OWNER": THE OWNER IS UNITED STATES GOVERNMENT - DEPT. OF VETERANS AFFAIRS; VA MEDICAL CENTER,9600 VETERANS DR SW TACOMA, WA 98493, AND IS REFEREED TO THROUGHOUT THE CONTRACT DOCUMENTS AS IF SINGULAR IN NUMBER. THE TERM "OWNER"

MEANS THE OWNER OR THE OWNER'S AUTHORIZED REPRESENTATIVE.

"CONTRACTING OFFICER" OR "C.O.": THE OWNER'S AUTHORIZED REPRESENTATIVE RESPONSIBLE FOR ADMINISTRATING THE CONTRACT BETWEEN HOOD RIVER ENGINEERS AND OWNER. THE TERM INCLUDES CERTAIN AUTHORIZED REPRESENTATIVES OF THE CONTRACTING OFFICER ACTING WITHIN THE LIMITS OF THEIR AUTHORITY AS DELEGATED BY THE CONTRACTING OFFICER.

"CONTRACTING OFFICER'S REPRESENTATIVE", "C.O.R.": MEANS THE CONTRACTING OFFICER'S AUTHORIZED REPRESENTATIVE, IN PART, RESPONSIBLE FOR MONITORING THE CONTRACTOR'S (PLURAL) PERFORMANCE.

"WORK": THE TERM "WORK" MEANS THE CONSTRUCTION AND SERVICES REQUIRED BY THE CONTRACT DOCUMENTS, WHETHER COMPLETED OR PARTIALLY COMPLETED, AND INCLUDES ALL OTHER LABOR, MATERIALS, EQUIPMENT AND SERVICES PROVIDED BY THE CONTRACTOR TO FULFILL THE CONTRACTOR'S OBLIGATIONS. THE WORK MAY CONSTITUTE THE WHOLE OR A PART OF THE PROJECT.

"PROJECT": THE TOTAL CONSTRUCTION OF WHICH THE WORK PERFORMED UNDER THE CONTRACT DOCUMENTS

"DRAWINGS", "SHOP DRAWINGS" OR "PLANS" THE GRAPHIC AND PICTORIAL PORTIONS OF CONTRACT DOCUMENTS, WHENEVER LOCATED AND WHENEVER ISSUED, SHOWING DESIGN, LOCATION AND DIMENSIONS OF THE WORK, GENERALLY INCLUDING PLANS, ELEVATIONS, SECTIONS, DETAILS, SCHEDULES AND DIAGRAMS.

"PROJECT SUPERVISOR" OR "SUPERVISOR": MEANS THE ON-SITE SUPERVISION REPRESENTATIVE OF THE PROJECT.

"ARCHITECT" OR "ENGINEER": MEANS THE VA'S ARCHITECTS, ENGINEERS AND OTHER DESIGN AND ENGINEERS PROFESSIONALS FOR

THIS PROJECT, AND REFERRED THROUGHOUT THE DRAWINGS AS IF SINGULAR IN NUMBER.

"TRADE CONTRACTOR" OR "CONTRACTORS": MEANS THE ENTITY UNDER CONTRACT AGREEMENT WITH THE GENERAL CONTRACTOR TO PROVIDE THE SPECIFIED GENERAL AND OR SPECIALTY WORK IN CONNECTION WITH THIS PROJECT.

"FURNISH" OR "FURNISHED": MEANS PROVIDING ALL MATERIALS, SHOP DRAWINGS, TRANSPORTATION, INSURANCE, FIELD MEASUREMENTS, EXPEDITING, SHIPPING, HANDLING, PACKAGING, STORAGE, TOUCH-UP MATERIALS, OWNER'S MANUALS, TRAINING AND

ANY OTHER ACCESSORIES REQUIRED FOR A COMPLETE INSTALLATION.

"INSTALL" OR "INSTALLED": MEANS COMPLETING ALL WORK AND COSTS ASSOCIATED WITH UNLOADING, UNPACKING, HOISTING, STORAGE, HANGERS, SUPPORTS,SLEEVES, SCAFFOLDING, COORDINATION, LAYOUT, SHOP DRAWINGS, EXCAVATION, BACKFILL, DEWATERING, INSTALLATION, CUTTING AND PATCHING, FIRESTOPPING, CLEAN-UP, INSPECTION, DOCUMENTATION, PROTECTION OF SCOPE OF WORK AND ALL ACCESSORIES, SERVICE AND FACILITIES REQUIRED FOR A COMPLETE INSTALLATION.

"PROVIDE" OR "PROVIDED": MEANS TO FURNISH AND INSTALL AND SHALL INCLUDE, WITHOUT LIMITATION, ALL LABOR, MATERIALS, EQUIPMENTS, TRANSPORTATION SERVICES, AND OTHER ITEMS REQUIRED TO COMPLETE THE REFERENCED TASK.

"BY OWNER"; "BY VAMC" OR "BY VA": MEANS ITEMS WILL BE ORDERED, PAID FOR, SHIPPED TO THE JOB SITE AND INSTALLED BY THE

OWNER.

"NOT IN CONTRACT" OR "N.I.C.": MEANS MATERIALS OR EQUIPMENT NOT IN THE CONTRACT, BUT MAY REQUIRE PROVISIONS IN THE

CONSTRUCTION FOR FUTURE INSTALLATION AS SPECIFIED OR SHOWN.

TYPICAL SYMBOLS

DETAIL INDICATOR

DETAIL INDICATOR

DETAIL INDICATOR FOR

SMALL CONDITIONS

DIMENSION LINE

KEYNOTE

DETAIL INDICATOR

PROJECT PHASING NOTES

PHASE 1: CONTRACTOR TO PERFORM ALL INTERIOR DATA, FIBER WORK AND NEW SITE CONDUITS TO

EXISTING VAULT AS SHOWN ON THE CONTRACT DOCUMENTS FOR BUILDING 74.

PHASE 2: CONTRACTOR TO PROVIDE ALL WORK FOR ROUTING OF PRIMARY FIBER OPTIC CABLING FROM

BUILDING 74 TO BUILDING 69 AND ALL INTERIOR DATA AND FIBER WORK AS SHOWN ON THE

CONTRACT DUCUMENTS FOR BUILDING 69. WHILE TRENCH IS OPEN FOR INSTALLATION OF FIBER

OPTIC CONDUIT, CONTRACTOR TO INCLUDE ALL CONDUITS WITHIN THE TRENCHING ZONE AS

SHOWN ON THE CONTRACT DOCUMENTS.

PHASE 3: CONTRACTOR TO PROVIDE ALL WORK FOR ROUTING OF PRIMARY FIBER OPTIC CABLING FROM

BUILDING 74 TO BUILDING 143 AND ALL INTERIOR FIBER WORK AS SHOWN ON THE CONTRACT

DUCUMENTS FOR BUILDING 143. WHILE TRENCH IS OPEN FOR INSTALLATION OF FIBER OPTIC

CONDUIT, CONTRACTOR TO INCLUDE ALL CONDUITS WITHIN THE TRENCHING ZONE AS SHOWN ON

THE CONTRACT DOCUMENTS.

PHASE 4: CONTRACTOR TO PROVIDE ALL WORK FOR ROUTING OF PRIMARY FIBER OPTIC CABLING FROM

BUILDING 74 TO BUILDING 145 AND ALL INTERIOR FIBER WORK AS SHOWN ON THE CONTRACT

DUCUMENTS FOR BUILDING 145. WHILE TRENCH IS OPEN FOR INSTALLATION OF FIBER OPTIC

CONDUIT, CONTRACTOR TO INCLUDE ALL CONDUITS WITHIN THE TRENCHING ZONE AS SHOWN ON

THE CONTRACT DOCUMENTS.

PHASE 5: CONTRACTOR TO PROVIDE ALL WORK FOR ROUTING OF PRIMARY FIBER OPTIC CABLING FROM

BUILDING 74 TO BUILDING 140 AND ALL INTERIOR FIBER WORK AS SHOWN ON THE CONTRACT

DUCUMENTS FOR BUILDING 140. WHILE TRENCH IS OPEN FOR INSTALLATION OF FIBER OPTIC

CONDUIT, CONTRACTOR TO INCLUDE ALL CONDUITS WITHIN THE TRENCHING ZONE AS SHOWN ON

THE CONTRACT DOCUMENTS.

PHASE 6: CONTRACTOR TO PROVIDE ALL WORK FOR ROUTING OF PRIMARY FIBER OPTIC CABLING FROM

BUILDING 74 TO BUILDING 68 AND ALL INTERIOR FIBER WORK AS SHOWN ON THE CONTRACT

DUCUMENTS FOR BUILDING 68. WHILE TRENCH IS OPEN FOR INSTALLATION OF FIBER OPTIC

CONDUIT, CONTRACTOR TO INCLUDE ALL CONDUITS WITHIN THE TRENCHING ZONE AS SHOWN ON

THE CONTRACT DOCUMENTS.

PHASE 7: ALL OTHER WORK NOT LISTED IN PHASE 1 THRU 6 ABOVE AS SHOWN IN CONTRACT DOCUMENTS.

NOTE: CONTRACTOR MAY WORK ON MULTIPLE PHASES OF PROJECT CONCURRENTLY. SITE WORK MAY BE PERFORMED CONCURRENTLY WITH ALL PHASES OF PROJECT. ALL WORK ASSOCIATED WITH PHASE 1

THRU 6 SHALL BE COMPLETED BY NO LATER THAN MARCH 15TH, 2021.

GI0001 COVER SHEET, VICINITY MAP, AND GENERAL REQUIREMENTS 01 OF 66

TG0001 TELECOMMUNICATION LEGEND AND SCHEDULES 02 OF 66

RC0001 EXISTING CONDITIONS PLAN 03 OF 66

CS0001 FIBER OPTICS SITE PLAN 04 OF 66

CU0101 PRIMARY FIBER OPTICS SITE PLAN 05 OF 66

CU0102 PRIMARY FIBER OPTICS PLAN AND PROFILE 06 OF 66

CU0103 PRIMARY FIBER OPTICS PLAN AND PROFILE 07 OF 66

CU0104 PRIMARY FIBER OPTICS PLAN AND PROFILE 08 OF 66

CU0201 PRIMARY FIBER OPTICS PLAN AND PROFILE 09 OF 66

CU0202 PRIMARY FIBER OPTICS PLAN AND PROFILE 10 OF 66

CU0203 PRIMARY FIBER OPTICS PLAN AND PROFILE 11 OF 66

CU0301 PRIMARY FIBER OPTICS PLAN AND PROFILE 12 OF 66

CU0302 PRIMARY FIBER OPTICS PLAN AND PROFILE 13 OF 66

CU0303 PRIMARY FIBER OPTICS PLAN AND PROFILE 14 OF 66

CU0401 PRIMARY FIBER OPTICS PLAN AND PROFILE 15 OF 66

CU0402 PRIMARY FIBER OPTICS PLAN AND PROFILE 16 OF 66

CU0403 PRIMARY FIBER OPTICS PLAN AND PROFILE 17 OF 66

CU0501 PRIMARY FIBER OPTICS PLAN AND PROFILE 18 OF 66

CU0502 PRIMARY FIBER OPTICS PLAN AND PROFILE 19 OF 66

CU0503 PRIMARY FIBER OPTICS PLAN AND PROFILE 20 OF 66

CU0600 SECONDARY FIBER OPTICS SITE PLAN 21 OF 66

CU0601 SECONDARY FIBER OPTICS PLAN & PROFILE 22 OF 66

CU0701 SECONDARY FIBER OPTICS PLAN & PROFILE 23 OF 66

CU0801 SECONDARY FIBER OPTICS PLAN & PROFILE 24 OF 66

CU0802 SECONDARY FIBER OPTICS PLAN & PROFILE 25 OF 66

CU0901 SECONDARY FIBER OPTICS PLAN & PROFILE 26 OF 66

CU0902 SECONDARY FIBER OPTICS PLAN & PROFILE 27 OF 66

CU0903 SECONDARY FIBER OPTICS PLAN & PROFILE 28 OF 66

CU0904 SECONDARY FIBER OPTICS PLAN & PROFILE 29 OF 66

CU01001 SECONDARY FIBER OPTICS PLAN & PROFILE 30 OF 66

CU01002 SECONDARY FIBER OPTICS PLAN & PROFILE 31 OF 66

CU01101 SECONDARY FIBER OPTICS PLAN & PROFILE 32 OF 66

CU01102 SECONDARY FIBER OPTICS PLAN & PROFILE 33 OF 66

CU01103 SECONDARY FIBER OPTICS PLAN & PROFILE 34 OF 66

CU01104 SECONDARY FIBER OPTICS PLAN & PROFILE 35 OF 66

CJ0001 PAVING AND LANDSCAPE REPAIR AND RESTORATION DETAILS 36 OF 66

CJ0002 STANDARD SITE DETAILS 37 OF 66

CJ0003 EROSION CONTROL DETAILS 38 OF 66

ED0001 TELECOMMUNICATION DEMOLITION SITE PLAN 39 OF 66

ED0002 TELECOMMUNICATION DEMOLITION SITE PLAN 40 OF 66

ED0003 TELECOMMUNICATION DEMOLITION SITE PLAN 41 OF 66

ES0000 TELECOMMUNICATION OVERALL SITE PLAN 42 OF 66

ES0001 TELECOMMUNICATION PARTIAL SITE PLAN 43 OF 66

ES0002 TELECOMMUNICATION PARTIAL SITE PLAN 44 OF 66

ES0003 TELECOMMUNICATION PARTIAL SITE PLAN 45 OF 66

TN0T11 TELECOMMUNICATIONS PLAN - BLDG T1, T2, 66 46 OF 66

TN0011 TELECOMMUNICATIONS PLAN - BLDG 1, T7, 135 47 OF 66

TN0481 TELECOMMUNICATIONS PLAN - BLDG 48 48 OF 66

TN0491 TELECOMMUNICATIONS PLAN - BLDG 49 49 OF 66

TN0631 TELECOMMUNICATIONS PLAN - BLDG 63, 65 50 OF 66

TN0681 TELECOMMUNICATIONS PLAN - BLDG 68 - BASEMENT & 2ND FLOOR 51 OF 66

TN0691 TELECOMMUNICATIONS PLAN - BLDG 69 - BASEMENT & 2ND FLOOR 52 OF 66

TN0741 TELECOMMUNICATIONS PLAN - BLDG 74 - FIRST FLOOR 53 OF 66

TN0742 TELECOMMUNICATIONS PLAN - BLDG 74 - SECOND FLOOR 54 OF 66

TN0743 TELECOMMUNICATIONS PLAN - BLDG 74 - ENLARGED PLANS 55 OF 66

TN0751 TELECOMMUNICATIONS PLAN - BLDG 75, 76, 77 56 OF 66

TN0781 TELECOMMUNICATIONS PLAN - BLDG 78 57 OF 66

TN0801 TELECOMMUNICATIONS PLAN - BLDG 80 58 OF 66

TN0811 TELECOMMUNICATIONS PLAN - BLDG 81, 82 59 OF 66

TN1401 TELECOMMUNICATIONS PLAN - BLDG 140 60 OF 66

TN1431 TELECOMMUNICATIONS PLAN - BLDG 143 - FIRST FLOOR 61 OF 66

TN1432 TELECOMMUNICATIONS PLAN - BLDG 143 - SECOND FLOOR 62 OF 66

TN1451 TELECOMMUNICATIONS PLAN - BLDG 145 63 OF 66

EJ0001 TELECOMMUNICATIONS DETAILS 64 OF 66

EJ0002 TELECOMMUNICATIONS DETAILS 65 OF 66

EJ0003 TELECOMMUNICATIONS DETAILS 66 OF 66

TG0001

TELECOMMUNICATION LEGEND AND

SCHEDULES

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

RECORDS DOCUMENTOffice of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Hood River Engineers 1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128 Dave Clem

VA WALLA WALLA FIRE LIFE

SAFETY REPLACEMENT - PHASE A

WALLA WALLA, WA

687-18-101

Project Director

Revisions: Date:

FLS

06/05/23 DJC ANH

DRAFT DESIGN DEVELOPMENT 08/03/20

RECORDS DOCUMENT

FINAL DESIGN DEVELOPMENT 09/10/20

65% SUBMITTAL 10/23/20

95% CONSTRUCTION DOCUMENTS 12/07/20

FINAL CONSTRUCTION DOCUMENTS 01/05/21

RECORDS DOCUMENT 06/05/23

SYMBOL

SYMBOL LEGEND - TELECOMM

DESCRIPTION

A, AMP AMPERE

ACP ACCESSIBLE CARD PATH

ADA AMERICAN DISABILITY ACT

AF AMP FRAME

AFC AVAILABLE FAULT CURRENT

AFCI ARC FAULT CIRCUIT INTERRUPTER

AFF ABOVE FINISHED FLOOR

AG ABOVE GROUND

AT AMP TRIP

ATS AUTOMATIC TRANSFER SWITCH

AL ALUMINUM

BKR BREAKER

C CONDUIT

CKT CIRCUIT

CO CONDUIT AND PULL-ROPE ONLY

COMM COMMUNICATION

CTRL CONTROL

CU COPPER

(E) EXISTING

EC, E.C. ELECTRICAL CONTRACTOR

ELEC ELECTRICAL

EM EMERGENCY

EQPT EQUIPMENT

(F) FUTURE

FA FIRE ALARM

FDR FEEDER

G, GND GROUND

GC, G.C. GENERAL CONTRACTOR

HH HANDHOLE

IDF INTERMEDIATE DISTRIBUTION FRAME

J-BOX JUNCTION BOX

LCP LIGHTING CONTROL PANEL

LTG LIGHTING

LTS LIGHTS

LV LOW-VOLTAGE

MH MANHOLE

N NEUTRAL

NEC NATIONAL ELECTRICAL CODE

OC ON-CENTER

OFCI OWNER-FURNISHED CONTRACTOR-INSTALLED

OFOI OWNER-FURNISHED OWNER-INSTALLED

OL OVERLOAD

P POLE

PB PULLBOX, PUSHBUTTON

PRI PRIMARY

(G) REVISED

REF REFERENCE, REFRIGERATOR

SEC SECONDARY

SOW SCOPE OF WORK

SPECS SPECIFICATIONS

SS STAINLESS STEEL

SW SWITCH

TEL TELEPHONE

TC TELECOMMUNICATION

THRU THROUGH

(TYP) TYPICAL

UG UNDERGROUND

UNO UNLESS NOTED OTHERWISE

VLT VAULT

W WIRE, WATT

WP WEATHERPROOF

ABBREVIATION LIST

1. PROVIDE COMPLETE WORK FOR REQUIREMENTS AS DESCRIBED ON

LEGEND. REFER TO OTHER DISCIPLINE DRAWINGS FOR LOCATIONS OF

EQUIPMENT AND DEVICES REQUIRED TO BE SUPPLIED WITH POWER.

2. INSTALLATION SHALL COMPLY WITH APPLICABLE CODES, INCLUDING,

BUT NOT LIMITED TO THE FOLLOWING: 2017 NATIONAL ELECTRICAL

CODE (NEC), VA STANDARDS AND REQUIREMENTS, LOCAL, STATE, AND

FEDERAL CODES AND ORDINANCES. AS WELL AS ALL BICSI

STANDARDS.

3. PRIOR TO PREPARATION OF BID, VISIT JOBSITE AND EXAMINE EXISTING

CONDITIONS. WORK SCOPE SHALL INCLUDE ALL COSTS FOR CUTTING,

PATCHING AND CORE DRILLING REQUIRED TO INSTALL CONDUIT AND

OTHER WIRING METHODS THROUGH EXISTING WALLS, FLOORS AND

OTHER BUILDING ELEMENTS (NOT SHOWN ON DRAWINGS).

4. PROVIDE SEPARATE AS BUILT SITE DRAWINGS, SHOWING ALL EXISTING

UNDERGROUND UTILITIES, AND ALL NEW UNDERGROUND UTILITIES.

5. PROVIDE TEMPORARY POWER FOR CONSTRUCTION. TEMPORARY

POWER MAY BE IN THE FORM OF PORTABLE GENERATOR SET;

CONNECTION TO UTILITIES COMPANY'S POWER SYSTEM OR EXISTING

FACILITY'S ELECTRICAL SYSTEM.

6. DO NOT TAKE MEASUREMENTS FROM PLANS FOR DEVICE LOCATIONS.

FIELD VERIFY EXACT DEVICE, EQUIPMENT LOCATIONS, AND MOUNTING

HEIGHTS WITH OWNER'S REPRESENTATIVE FOR PROPER

INSTALLATION.

7. SCHEMATIC DIAGRAMS AND RACEWAY ROUTING ARE SCHEMATIC AND

DO NOT SHOW EXACT PHYSICAL ARRANGEMENT OF EQUIPMENT.

WHERE INDICATED ON DRAWINGS, JUNCTION BOXES AND PULLBOXES

ARE MINIMUM REQUIREMENTS. PROVIDE FITTINGS AND PULLBOXES OF

ADEQUATE SIZE IN RACEWAY SYSTEMS WHEREVER NECESSARY OR

REQUIRED BY THE NEC OR LOCAL CODES. PROVIDE EXPANSION JOINT

FITTINGS FOR RACEWAY PASSING THROUGH NEW OR EXISTING

EXPANSION JOINTS INSTALLED BETWEEN BUILDINGS. VERIFY EXACT

LOCATIONS AND DETAILS OF EXPANSION JOINTS PRIOR TO WORK.

COORDINATE ALL RACEWAY ROUTING, PULLBOXES, AND EQUIPMENT

LOCATIONS WITH OTHER TRADES TO AVOID CONFLICTS OF EQUIPMENT

INSTALLATIONS.

8. RACEWAYS, CABLE SIZES AND ROUTES AS SHOWN REPRESENT INTENT

OF INSTALLATION, BUT MAY NOT NECESSARILY REPRESENT THE

COMPLETE WIRING COUNTS AND MINIMUM SIZES FOR CONNECTING

THE CIRCUITS SHOWN. CONTRACTOR SHALL INCLUDE IN THE BID, ALL

REQUIRED RACEWAY SIZES AND NUMBER OF CABLES IN ORDER TO

PROVIDE ALL CABLES AS SHOWN.

9. REFER TO SCHEDULES FOR CABLING REQUIREMENTS NOT INDICATED

ON PLANS.

10. INSTALLATION OF UNDERGROUND CABLING SYSTEMS SHALL INCLUDE

EXCAVATION, CUTTING, PATCHING, BACKFILL, AND COMPACTION. DO

NOT CUT OR DAMAGE ANY EXISTING UTILITIES, STRUCTURAL

MEMBERS, OR BUILDING FOUNDATIONS. VERIFY EXISTING CONDITIONS

PRIOR TO EXCAVATION WORK. INCLUDE COST FOR UNDERGROUND

LOCATOR SERVICE TO IDENTIFY LOCATIONS OF EXISTING

COMPONENTS. HAND EXCAVATE IN LOCATIONS WHERE EXISTING

UNDERGROUND COMPONENTS ARE SUBJECT TO DAMAGE. REPAIR

DAMAGE TO EXISTING UTILITIES OR BUILDING STRUCTURE TO

OWNER'S SATISFACTION AT THE CONTRACTORS EXPENSE.

11. PROVIDE PULL-ROPES IN ALL EMPTY CONDUITS.

12. CONDUIT OR OTHER ELECTRICAL COMPONENTS SHALL NOT BE

INSTALLED IN STRUCTURAL CONCRETE UNLESS SPECIFICALLY

INDICATED ON THE DRAWINGS OR APPROVED BY A STRUCTURAL

ENGINEER. ALL CORE DRILLING FOR RACEWAY INSTALLATION, SHALL

BE THE RESPONSIBILITY OF THE E.C.

13. COORDINATE PAINTING WORK OF ELECTRICAL ITEMS WITH GENERAL

CONTRACTOR. SEE PAINTING SPECIFICATIONS FOR REQUIREMENTS.

14. CONTRACTOR TO PROVIDE ADDITIONAL CABLE LENGTH, ADDED TO

FIELD MEASURED LENGTH, OF COPPER AND FIBER OPTIC CABLE FOR

ONE 10' SERVICE LOOP AT EACH END WITHIN EACH

TELECOMMUNICATIONS SPACE. IN ADDITION TO THE SERVICE LOOPS,

CONTRACTOR SHALL ALSO SUPPLY ADDITIONAL LENGTH FOR SITE

BACKBONE CABLING AS NOTED IN CABLING SCHEDULES SHOWN ON

THIS SHEET AND AS NOTED IN DRAWINGS SHEETS TNxxxx FOR FUTURE

RELOCATION OF CABLING TO NEW DATA CENTER LOCATION AND

SERVICE LOOP IN EACH VAULT OF AT LEAST 16'.

15. ALL NEW INTERIOR AND EXTERIOR EXPOSED CONDUIT, BOXES AND

SUPPORTS TO BE PAINTED TO MATCH EXISTING SURFACE.

GENERAL NOTES

P

S SECONDARY FIBER LOOP

PRIMARY FIBER LOOP

PRIMARY FIBER TAG. SEE NEW CAMPUS FIBER SCHEDULE

SECONDARY FIBER TAG. SEE NEW CAMPUS FIBER SCHEDULE

(N)MH-N#

FIBER ROUTING, SUPPORTED WITH J-HOOKS

FIBER ROUTING IN CONDUIT

J xxxP

NEW MANHOLE

xxxS

(E)MH-# EXISTING MANHOLE

FIBER BACKBONE SCHEDULES

COPPER VOICE BACKBONE SCHEDULES

E2

E2 E2

E2E2

E2

E2

E2

E2

E3 E3

E3

E3 E3

E3

E3

E3 E3 E3

E3

E3E3E3 E3

E3 E3

E3 E3 E3 E3

E3 E3

E4

E4 E4 E4 E4 E4 E4

E4

E4

E1 E1 E1 E1 E1 E1 E1 E1

E1 E1

E1 E1

E1

E1E1

E1 E1

E1

E1

E1

E1

E1

E1

E1

E1

E1 E1 E1 E1E1E1

E1 E1 E1

E1 E1

E1

E1

E1

E1 E1

EL

ELELELELELELELELELELELELELELEL

X X

X X

X X

X

X X

X X

X X

X

X

X

5kV 5kV 5kV 5kV 5kV 5kV 5kV 5kV

5kV

5kV

5kV

5kV

5kV

5kV

5kV

5kV

5kV

5kV

5kV

5kV

5kV

5kV 5kV 5kV

5kV 5kV

5kV 5kV

5kV 5kV 5kV 5kV 5kV 5kV

5kV 5kV 5kV 5kV 5kV

5kV

5kV 5kV

5kV 5kV

5kV 5kV

5kV

5kV 5kV

5kV

5kV

5kV

5kV

5kV

5kV

5kV

5kV 5kV

5kV 5kV

5kV 5kV

5kV 5kV

5kV

5kV

5kV

5kV

5kV

5kV

5kV

5kV

5kV

5kV

5kV

5kV

5kV

5kV 5kV

5kV 5kV

5kV 5kV 5kV 5kV 5kV 5kV 5kV 5kV 5kV 5kV

5kV 5kV

5kV 5kV

5kV

5kV

5kV

5kV

5kV

5kV 5kV 5kV 5kV 5kV

12kV 12kV

12kV 12kV

12kV 12kV

12kV

12kV 12kV kV kV kV

5kV 5kV

5kV

5kV

12kV

12kV

12kV

12kV12kV12kV12kV12kV12kV12kV12kV12kV12kV12kV12kV

12kV 12kV

12kV 12kV

12kV

12kV

12kV

12kV12kV12kV

12kV

12kV

12kV

5kV 5kV

5kV

5kV5kV

12kV 12kV

12kV 12kV

12kV

12kV

12kV 12kV

12kV 12kV

12kV 12kV

12kV

12kV 12kV

12kV 12kV

X X

XXXXXXXXXX

X X

X X

X X

X X

X X

X X

X X

X X

X X X X X

XX

X

X

X

EL EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

ELEL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL EL

EL

EL

ELELEL

EL

EL

EL

EL

ELEL

EL 12kV 12kV

12kV

12kV

XXXXXXXXXXXXXXXXXXX

X

X X

X

X X

X

X X

X

X

X

X X

X

X

X

X

X X

X

X

X X

X

X

X X

X

X

X X

X

X

X X

X

12kV

12kV

12kV

12kV

12kV

12kV

12kV

12kV

12kV

12kV

12kV 12kV

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL EL

EL

EL

EL

EL

EL

ELELELELELELELELELELELEL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

L

EL

ELEL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

ELEL

EL

EL

EL

EL 12kV

12kV

12kV

12kV

12kV

12kV12kV12kV12kV12kV12kV12kV12kV

5kV5kV

5kV 5kV

5kV 5kV

5kV 5kV

5kV 5kV

5kV 5kV 5kV 5kV 5kV

5kV 5kV

5kV

5kV 5kV

5kV

5kV

5kV

EL EL EL EL EL EL EL EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

12kV12kV kV

SS

12kV12kV

PPP

P

P

P

P P

P

P P P P

P P

P

P

P

P

P

P

P

P

P

PPP

P

P

P

PPP

P P P P

23+00 24+00

+0

+3

26+00 27+00 28+00 29+00 30+00

+0

+0

+7

+0

+0

+3

+0

33+65

34+00 34+67

36+00 37+00

38+00 39+00 39+62

11+70 11+00

0+00

1+00

2+00

3+

4+00 5+00

6+00 7+00 8+00 9+00 10+00

10+74

+0

+6

13+00

+5

+0

+0

+0

17+00

18+00

19+00

20+00

21+00

22+00 22+12

+0

+0

41+30

42+00 43+00

44+00

44+77 46+0046+33

45+00

45+30

CU0101

1"=80'-0"

40' 80' 160'

SCALE:

CIVIL - OVERALL A-CIRCUIT FIBER

OPTICS SITE PLAN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

RECORD DOCUMENTSOffice of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Hood River Engineers 1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128 Dave Clem

VA WALLA WALLA FIRE LIFE

SAFETY REPLACEMENT - PHASE A

WALLA WALLA, WA

687-18-101

Project Director

Revisions: Date:

FLS

06/05/23 DJC ANH

RECORD DOCUMENTS 05/01/23

RECORD DOCUMENTS

FINAL CONSTRUCTION DOCUMENTS 01/05/21

95% CONSTRUCTION DOCUMENTS 12/07/20

65% SUBMITTAL 10/23/20

FINAL DESIGN DEVELOPMENT 09/10/20

DRAFT DESIGN DEVELOPMENT 08/03/20

E2

E2

E2

E2

E2

E2

E2

E2

E2

E2 E2

E2

E2

E3 E3

E3 E3

E3 E3

E3 E3 E3

E3 E3

E3

E3

E3 E3

E3

E3

E3

E3

E3 E3

E3 E3

E3E3

E3 E3

E3E3E3E3E3 E3

E3

E3

E3

E3

E3

E3

E3 E3

E3 E3

E3 E3 E3 E3 E3 E3

E3 E3

E3 E3

E3 E3

E3

E3

E4

E4

E4

E4 E4 E4 E4 E4 E4 E4 E4 E4 E4 E4

E4 E4

E4 E4

E4

E4

E4

E4

E4

E1 E1

E1 E1

E1 E1

E1

E1

E1

E1

E1

E1

E1

E1

E1

E1

E1

E1

E1

E1

E1

E1

E1

E1 E1 E1 E1 E1 E1

E1E1E1E1E1E1

E1 E1 E1 E1 E1 E1 E1 E1

E1 E1

E1 E1

E1 E1

E1

E1

E1

E1

E1

E1

E1

E1

E1

E1

E1

E1

E1

E1

E1

E1

X

X X

X X

X

5kV 5kV

5kV

5kV

5kV

5kV

5kV

5kV

5kV

5kV

5kV

5kV

5kV

5kV

5kV

5kV

5kV

5kV

5kV

5kV

5kV

5kV

5kV

5kV

5kV

5kV

5kV 5kV 5kV 5kV 5kV 5kV 5kV

5kV 5kV

5kV 5kV

5kV 5kV

5kV 5kV

5kV

5kV 5kV 5kV 5kV 5kV 5kV 5kV 5kV 5kV 5kV 5kV 5kV

5kV 5kV

5kV

5kV 5kV

5kV 5kV

5kV 5kV

5kV 5kV

5kV 5kV

5kV

5kV

5kV

5kV

5kV

5kV

5kV

5kV

5kV

5kV

5kV

5kV

5kV

5kV

5kV 5kV

5kV 5kV

5kV

5kV

5kV

5kV

5kV

5kV

5kV

5kV

5kV

5kV

5kV

5kV

5kV

5kV 5kV

5kV 5kV

5kV 5kV

5kV 5kV

5k V

5kV 5kV

5kV

5kV

5kV

5kV

5kV

5kV

5kV

5kV 5kV 5kV 5kV

12kV 12kV

12kV

12kV

12kV

12kV

12kV 12kV12kV kV kV kV kV kV kV

5kV 5kV

5kV 5kV

5kV 5kV

5kV

5kV

5kV

12kV 12kV

12kV 12kV 12kV

12kV 12kV

12kV 12kV

12kV12kV12kV12kV12kV12kV12kV12kV12kV12kV12kV12kV12kV12kV12kV12kV12kV12kV12kV12kV

12kV 12kV kV

12kV

12kV

12kV12kV12kV12kV12kV 12kV

12kV

12kV

12kV 12kV

12kV

12kV

12kV

5kV 5kV

XXXXXXXXXXXXXXX

X

EL EL EL EL EL

EL

EL EL EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

ELELELELEL

ELEL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL EL EL EL

EL

EL

EL

EL

ELELELELELEL

X X X

X

X

X

X

XX

X X

X X

X

X

X

X

X

X

X

X

X

X

12kV

12kV

12kV

12kV

12kV 12kV

12kV

12kV

12kV

12kV

12kV

12kV

12kV

12kV

12kV

12kV 12kV12kV12kV

EL EL EL EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

L

ELELELEL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

L

EL

EL

EL

EL

EL

EL

EL

EL

ELELEL

EL

EL

EL

ELEL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

5kV5kV

EL EL EL EL EL EL EL EL EL EL EL EL EL EL EL EL

EL

EL

EL

EL EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

EL

SS

PPPPPPP

P

P

P

P

P

P

P

P

P P

P P

P P

P

P

P P P P P P P P P

P P

P P

P P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

PPPPPP

P

P

P

P

P

P

P

P

P

P

P

P P

P

PPPPPPP

P P

P P

P P P P P P

P

23+00

24+00

+0

+3

26+00 27+00

28+00 29+00 30+00

+0

+0

+7

+0

+0

+3

+0

33+65

34+00

34+67

36+00

37+00

38+00 39+00

39+62

11+70

11+00

0+00

1+00

2+00

3+

4+00

5+00

6+00 7+00

8+00 9+00 10+00

10+74

+0

+6

13+00

+5

+0

+0

+0

17+00

18+00

19+00

20+00

21+00

22+0022+12

+0

+0

41+30

42+00

43+00

44+00

44+77

46+00 46+33

45+00

45+30

CU0102

1"=40'-0"

20 40 80

SCALE:

CIVIL - A-CIRCUIT FIBER OPTICS SITE

PLAN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

RECORD DOCUMENTSOffice of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Hood River Engineers 1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128 Dave Clem

VA WALLA WALLA FIRE LIFE

SAFETY REPLACEMENT - PHASE A

WALLA WALLA, WA

687-18-101

Project Director

Revisions: Date:

FLS

06/05/23 DJC ANH

RECORD DOCUMENTS 05/01/23

RECORD DOCUMENTS

FINAL CONSTRUCTION DOCUMENTS 01/05/21

95% CONSTRUCTION DOCUMENTS 12/07/20

65% SUBMITTAL 10/23/20

CU0103

CIVIL - A-CIRCUIT FIBER OPTICS

PROFILES

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

RECORD DOCUMENTSOffice of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Hood River Engineers 1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128 Dave Clem

VA WALLA WALLA FIRE LIFE

SAFETY REPLACEMENT - PHASE A

WALLA WALLA, WA

687-18-101

Project Director

Revisions: Date:

FLS

06/05/23 DJC ANH

RECORD DOCUMENTS 05/01/23

RECORD DOCUMENTS

FINAL CONSTRUCTION DOCUMENTS 01/05/21

95% CONSTRUCTION DOCUMENTS 12/07/20

65% SUBMITTAL 10/23/20

CU0104

CIVIL - PRIMARY FIBER OPTICS

PROFILES

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

RECORD DOCUMENTSOffice of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Hood River Engineers 1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128 Dave Clem

VA WALLA WALLA FIRE LIFE

SAFETY REPLACEMENT - PHASE A

WALLA WALLA, WA

687-18-101

Project Director

Revisions: Date:

FLS

06/05/23 DJC ANH

RECORD DOCUMENTS 05/01/23

RECORD DOCUMENTS

FINAL CONSTRUCTION DOCUMENTS 01/05/21

95% CONSTRUCTION DOCUMENTS 12/07/20

65% SUBMITTAL 10/23/20

CU0105

PROFILES

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

RECORD DOCUMENTSOffice of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Hood River Engineers 1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128 Dave Clem

VA WALLA WALLA FIRE LIFE

SAFETY REPLACEMENT - PHASE A

WALLA WALLA, WA

687-18-101

Project Director

Revisions: Date:

FLS

06/05/23 DJC ANH

RECORD DOCUMENTS 05/01/23

RECORD DOCUMENTS

FINAL CONSTRUCTION DOCUMENTS 01/05/21

95% CONSTRUCTION DOCUMENTS 12/07/20

65% SUBMITTAL 10/23/20

CU0106

PROFILES

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

RECORD DOCUMENTSOffice of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Hood River Engineers 1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128 Dave Clem

VA WALLA WALLA FIRE LIFE

SAFETY REPLACEMENT - PHASE A

WALLA WALLA, WA

687-18-101

Project Director

Revisions: Date:

FLS

06/05/23 DJC ANH

RECORD DOCUMENTS 05/01/23

RECORD DOCUMENTS

FINAL CONSTRUCTION DOCUMENTS 01/05/21

95% CONSTRUCTION DOCUMENTS 12/07/20

65% SUBMITTAL 10/23/20

T1

T1

T1

T1 T1

X X

X X

X X

X

X X

X X

X X

X

X

X X

X

XXXXXXXXXX

X X

X X

X X

X X

X X

X X

X X

X X

XX

X

X

X

X

X X

X

X

X

X X

X

X

X X

X

X X

X X

X

X X

X

X

X

X

X X

X

X

X X

X

X

X X

X

X

X X

X

X

X X

X

SS

S

S

S

S

S S S

S

S

S S

S

S S

S S

S

S

SSSSS

S

SSSS

S

S

S

S

S

S

S

S S

S S

S

S

S

S S

S

SS

SSS

S

S

SS

SSSSS

S

SSSS

0+00 1+00

2+

3+00 4+00

5+00

6+

7+007+59

8+00 9+0010+0010

+4

10+00

11+00 12+ 0012+

14+00

+0

16+00 17+00

18+00 19+00

+0

+4

+0

+1

22+00 23+00 24+00

+0

+0

+0

+0

29+00

+0

+7

31+00 32+00 33+00 33+

+0

+0

36+00

37+00

38+00

39+00

+0 0 41+0041+21

+0

+5

43+00

43+54

+0

44+99

45+00

+0

+0

48+0049+0050+0051+00

+0

+0

+0

55+0056+0057+0058+00

59+0059+08

60+

60+86

+0

+3

+0

63+00

64+0065+0066+0067+00

+0

+4

+0

+7

+0

70+88

+0

+7

72+

72+94

+0

+7

0+00 0+25

CU0600

CIVIL - OVERALL B-CIRCUIT FIBER

OPTICS SITE PLAN

1"=80'-0"

40' 80' 160'

SCALE:

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

RECORD DOCUMENTSOffice of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Hood River Engineers 1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128 Dave Clem

VA WALLA WALLA FIRE LIFE

SAFETY REPLACEMENT - PHASE A

WALLA WALLA, WA

687-18-101

Project Director

Revisions: Date:

FLS

06/05/23 DJC ANH

RECORD DOCUMENTS 05/01/23

RECORD DOCUMENTS

FINAL CONSTRUCTION DOCUMENTS 01/05/21

95% CONSTRUCTION DOCUMENTS 12/07/20

65% SUBMITTAL 10/23/20

X

X X

X X

X

X

X X

X X

X

XXXXXXXXXXXXXXXXXX

X X

X

X

X X

X

X

X X X

X X

X

X

X

X

X X

X X

X

X

XXX

X X

X

X

X

X X

X X

X

X

X

X

XX

X X

X X

X

X X

X X

X X

X

X

X

X

X

SS SS SS

S S

S S

S

S S

SSS

S

S

S S S

S S

S S

S S

S S

S

S S S

S

SSSSSSSSSS

S S

S

S

S

S

S

S

S S S

S S

S S

S S

S

S

SSSSSSSS

0+00 1+00

2+

3+00

4+00

5+00

6+

7+007+59

8+00

9+00 10+00

+4

10+00

11+00

12+

+14

14+00

+0

16+00

17+00

18+00 19+00

+0

+4

+0 1+

22+00

23+00

24+00

+0

+0

45+00

0+00 0+25

CU0601

CIVIL - B-CIRCUIT FIBER OPTICS SITE

PLAN

1"=40'-0"

20 40 80

SCALE:

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

RECORD DOCUMENTSOffice of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Hood River Engineers 1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128 Dave Clem

VA WALLA WALLA FIRE LIFE

SAFETY REPLACEMENT - PHASE A

WALLA WALLA, WA

687-18-101

Project Director

Revisions: Date:

FLS

06/05/23 DJC ANH

RECORD DOCUMENTS 05/01/23

RECORD DOCUMENTS

FINAL CONSTRUCTION DOCUMENTS 01/05/21

95% CONSTRUCTION DOCUMENTS 12/07/20

65% SUBMITTAL 10/23/20

X

WM

S S

S

S

S

S

S

S

S S

S

S S S S S S

S

SSSSSSSSSS

S

S

S

S

S

S

S

S

S

S S

S S S

S

S

S

S

S S

S S

S S

S S

S

S S

S S

S

S

S

S

S

S

S S

SSSSSS S S

S

S

S S

S

S S

S S

S

S S

S

SSSSSSSSSSS

S S

S

+ 2

+0

+0

29+00

+0

+7

31+00 32+00 33+00 33+

+0

+0

36+00

37+00

38+00

39+00

+0

41+00 41+21

+0

+5

43+00

43+54

+0

44+99

45+00

+0

+0

48+0049+0050+0051+00

+0

+0

+0

55+0056+0057+0058+00

59+0059+08

60+

60+86

+0

+3

+0

63+00

64+0065+0066+0067+00

+0

+4

+0

+7

+0

70+88

+0

+7

72+

72+94

+0

+7

CU0602

CIVIL - B-CIRCUIT FIBER OPTICS SITE

PLAN

1"=40'-0"

20 40 80

SCALE:

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

RECORD DOCUMENTSOffice of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Hood River Engineers 1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128 Dave Clem

VA WALLA WALLA FIRE LIFE

SAFETY REPLACEMENT - PHASE A

WALLA WALLA, WA

687-18-101

Project Director

Revisions: Date:

FLS

06/05/23 DJC ANH

RECORD DOCUMENTS 05/01/23

RECORD DOCUMENTS

FINAL CONSTRUCTION DOCUMENTS 01/05/21

95% CONSTRUCTION DOCUMENTS 12/07/20

65% SUBMITTAL 10/23/20

CU0605

CIVIL - B-CIRCUIT FIBER OPTICS PLAN

AND PROFILE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

RECORD DOCUMENTSOffice of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Hood River Engineers 1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128 Dave Clem

VA WALLA WALLA FIRE LIFE

SAFETY REPLACEMENT - PHASE A

WALLA WALLA, WA

687-18-101

Project Director

Revisions: Date:

FLS

06/05/23 DJC ANH

RECORD DOCUMENTS 05/01/23

RECORD DOCUMENTS

FINAL CONSTRUCTION DOCUMENTS 01/05/21

95% CONSTRUCTION DOCUMENTS 12/07/20

65% SUBMITTAL 10/23/20

T1

T1

T1

T1

T1

T1

T1

T1

T1

T1

T1

T1 T1

T1 T1

T1

X

X

X X X

X X X

X X X

X X X

X X

X X

X X

X X

X X

X X

X X

X X

X X X

X X

X X

X X

X X

X X

X X X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

XX

X

X X

X

X X

X X

X X

X X

X X

X X

XXXXXXXXXXXXXXXXXXXX

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X X X X X X X X X

X X

X

X

X X

X

X

X

X

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX X X X X X X X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X

X

X X

X

X X X

X X

X

X

X

X

X

X X

X X

X X

X

X

X

XXX

X X

X

X

X

X

X

X X

X X

X X

X

X

X

X X X X

X X

X

X

X

X

X

XX

X X

X X

X

X

X

X X

X X

X

X

X

X

X

X

X

X X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X X

X

X

X

X

X

STATE NURSING HOME

STATE NURSING HOME

STATE NURSING HOME

STATE NURSING HOME

N U

R S

IN

G

H O

M E

FU

TU

R E

B

LD

G

SS SS SS

WM

7 49 48

66T-7

77T-1

T-2

756968

116119

121126125124

109CM

147 146

WATER TOWER

P P

P P

PPPP

P

P

P

P

P

P

P P

P P

P P

P

P

P

PPP

P P P P P

P P P P P P P

P P P P P P P P P

P P

P P

P P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

PPPPPP

P

P

P

P

P

P

SS

S

S

S

S

S S

S S S S S

P P P

P

S

S

S S

S

S

S

SS

P

S S

S S

S

S S

S S

S

S

S

SSSSSSSSSS

S S

S S

S S

S

SS

S S

P P

S

S

S

S

S

S S

S S S

S

S S

P P P P P P P P P P P P P P P P P P P P P P P P

P

P P

P P

S S S

P

S S

S S S

S S

P

P P

P P

P P

P P

P

P P

P

P P

P

P P P P P P

P

P

P P

P P

P P

P P

P P

S S

S S

S

P

PP

P

P

P

P

P

P P

S

S

P P P P P P

P P

S S

S

S S

S S

S S

S S

S S

S S S S S S S S S S

S S

S S

S S

S S

S S

S

S

S S S S S S S S S

SS

SS

S

S

S

S S S S

S S

S

S

S

S S

S

S

P P P P P

P

P

P

P

P

P

PPPPPPP

P P

SS

S S

S

ES0000

TELECOMMUNICATION OVERALL

SITE PLAN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

RECORDS DOCUMENTOffice of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Hood River Engineers 1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128 Dave Clem

VA WALLA WALLA FIRE LIFE

SAFETY REPLACEMENT - PHASE A

WALLA WALLA, WA

687-18-101

Project Director

Revisions: Date:

FLS

06/05/23 DJC ANH

DRAFT DESIGN DEVELOPMENT 08/03/20

RECORDS DOCUMENT

FINAL DESIGN DEVELOPMENT 09/10/20

65% SUBMITTAL 10/23/20

95% CONSTRUCTION DOCUMENTS 12/07/20

FINAL CONSTRUCTION DOCUMENTS 01/05/21

RECORDS DOCUMENT 06/05/23

1"=80'-0"

40' 80' 160'

SCALE:

TELECOMMUNICATION OVERALL SITE PLAN

X X

X X

X X

X

X

XX

X X

X X

X X

X X

X X

X X

XXXXXXXXXXXXXXXXXX

X X

X

X

X X

X

X

X

X X

X X

X

X

X

XXX

X X

X

X

X

X

X

X X X

X X

X X

X

X

X

X X

X X

X

X

SS SS SS 66T-7

109CM

P P

P

P(E)TMH

(E)TMH

(E)TMH

(E)TMH

(E)TMH

(E)TMH

(E)TMH

PPPPPP

P

P

P

P

P

P

P P P P P P

P P

P P

P

P P P P P P P P P

P P

P P

P P

P

P

P

P

P

P

P

P

P

(N)TMH

PPPPPP

P

P

P

(N)TMH

(N)TMH

P P P

P

S

S

S S

S

S S

S S

(N)TMH

P

S S

S S

S

(N)TMH

S S

S S

S S

S

(N)TMH

(N)TMH

S

SSSSSSSSSS

S S

(1) 4"C

(2) 4"C.O. - SPARE

69P

(1) 4"C 80P

(1) 4"C 81P

68P 69P 80P

81P

(1) 4"C 66P

68P 69P 80P 81P 66P(1) 4"C

T7P

(1) 4"C

(1) 4" C.O. - SPARE

78P T1P T2P 77P

(1) 4"C 75P

75P

(1) 4"C

(1) 4" C.O. - SPARE

78P T1P T2P 77P

75P

(1) 4"C

(1) 4" C.O. - SPARE

78P

T1P T2P 77P75P

(1) 4"C 65P

(1) 4"C 63P

63P 65P

(1) 4"C 76P

(1) 4"C 135P

(1) 4"C 82P

76P 82P 135P

(2) 4"C

78P T1P T2P

77P75P 63P65P

76P 82P 135P

(2) 4"C

78P T1P T2P

77P75P 63P 65P

76P 82P 135P

(2) 4"C

(1) 4" C.O. - SPARE

78P

T1P T2P

77P75P

63P 65P 68P 69P

80P 81P

66P T7P

(1)4"C - FIBER

(1)2"C - COPPER

135S

(1)4"C - FIBER

(1)2"C - COPPER

82S 82S

(1)4"C - FIBER

(1)4"C - COPPER

135S 82S

65S

63S

(1)4"C - FIBER

(1)4"C - COPPER

65S 63S

(1)4"C - FIBER

(1)2"C - COPPER

80S

(1)4"C - FIBER

(1)2"C - COPPER

81S

76S

T7S

145S

145S T7S SS

P P

76S135S 82S

(1) 4"C T1P T2P

145ST7S 66S

(1) 4"C

68P

P P

(N)TMH

145TT7T 66T

(1) 4"C - FIBER

(1)2" C - COPPER

(1) 4"C - FIBER

(1)2" C - COPPER

66S 66T

145T T7T

(1) 4"C - FIBER

(1) 4" C - COPPER

145T

(1) 4"C - FIBER

(1)2" C - COPPER

(1) 4"C - FIBER

(1)2" C - COPPER

T7T

80T

81T

135T

(1)4"C - FIBER

(1)4"C - COPPER

135S 135T

(1)4"C - FIBER

(1)4"C - COPPER

82T82T

135T 82T

(1)4"C - FIBER

(1)2"C - COPPER

76T

(1)4"C - FIBER

(1)2"C - COPPER

63T

(1)4"C - FIBER

(1)2"C - COPPER

65T

65T 63T76T135T 82T

S S S

(N)TMH

P

(1) 4"C 69P

(2) 4"C.0 - SPARE

(1) 4"C

(1) 4" C.O. - SPARE

(1) 4"C

(1) 4" C.O. - SPARE

CRNP

CRNP

CRNP

CRNP

CRNP

CRNP

PPPPPPP

P P

(N)TMH

P P

P P

P P P P P P

P

P

P

S S

S S

135S82S 65S63S 80S

81S 76S

135T82T 65T63T 80T

81T 76T

(1)4"C - FIBER

(1)4" C - COPPER

(2) 4"C.0 - SPARE

P

PP

P

P

P

P

P

P P

S S

S

S

P P P P P P

P P

S

S

S S S S

S

S

T1 T1

T1

T1

T1

T1

T1

T1

T1

T1

T1

T1

T1

T1 T1

T1 T1

T1

X

X

X X

X X X X X

X X X X X

X X

X X

X X

X X

X X

X X

X X

X X

X X X

X X

X X

X X

X X

X X

X X X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

XXX

X

XX

X X

X X

X X

X X

X X

X X

XXXXXXXXXXXXXXXXXXXX

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X X X X X X X X X

X X

X

X

X X

X

X

X

X

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

X X X

X X

X

X

X

X

X

X X

X X

X X

X

X

X

XXX

X X

X

X

X

X

X

X X

X X

X X

X

X

X

X X X X

X X

X

X

X

X

X

XX

X X

X X

X

X

X

X X

X X

X X

X

X

X

X

X

X X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X X

X

X

X

X

X

STATE NURSING HOME

STATE NURSING HOME

STATE NURSING HOME

STATE NURSING HOME

N U

R S

IN

G

H O

M E

FU

TU

R E

B

LD

G

SS SS SS

WM

7 49 48

66T-7

77T-1

T-2

756968

116119

121126125124

109CM

147 146

ES0001

ES0002 ES0003

ES0001

TELECOMMUNICATION PARTIAL SITE

PLAN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

RECORDS DOCUMENTOffice of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Hood River Engineers 1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128 Dave Clem

VA WALLA WALLA FIRE LIFE

SAFETY REPLACEMENT - PHASE A

WALLA WALLA, WA

687-18-101

Project Director

Revisions: Date:

FLS

06/05/23 DJC ANH

DRAFT DESIGN DEVELOPMENT 08/03/20

RECORDS DOCUMENT

FINAL DESIGN DEVELOPMENT 09/10/20

65% SUBMITTAL 10/23/20

95% CONSTRUCTION DOCUMENTS 12/07/20

FINAL CONSTRUCTION DOCUMENTS 01/05/21

RECORDS DOCUMENT 06/05/23

KEY PLAN

SCALE:

TELECOMMUNICATION PARTIAL SITE PLAN

1"=40'-0"

40' 80'

GENERAL NOTES

1. REFER TO NEW CAMPUS FIBER LOOP SCHEDULES FOR MORE

INFORMATION.

2. ALL FIBER CABLING ROUTED IN 3-CELL MAXCELL INNERDUCT.

3. THERE SHALL BE (3)3 INCH 3-CELL MAXCELL INNERDUCT PER

4" CONDUIT (TOTAL OF 9 PATHWAYS PER 4" CONDUIT).

4. ALL FIBER OPTIC CABLES RAN IN BUILDING FROM MDF TO IDF

TO BE FACTORY TERMINATED WITH MPO CONNECTORS. ALL

BUILDING TO BUILDING FIBER OPTIC CABLES ARE TO BE FIELD

TERMINATED WITH MPO CONNECTORS. ALL LENGTHS LISTED

IN MATRIX, SHOWN ON TG0001, ARE APPROXIMATE. IT IS THE

CONTRACTORS SOLE RESPONSIBILITY TO VERIFY REQUIRED

LENGTHS PRIOR TO PURCHASE OF FACTORY TERMINATED

CABLES. CONTRACTOR SHALL PROVIDE 10' OF ADDITIONAL

LENGTH AT EACH END AND 16' WITHIN EACH VAULT FOR

SERVICE LOOPS AS WELL AS ANY ADDITIONAL LENGTH AS

NOTED IN TNxxxx DRAWINGS.

5. DEMOLITION OF ALL EXISTING CABLES TO BE PERFORMED

ONLY AFTER NEW CABLING IS INSTALLED, TERMINATED AND

VA HAS CUT SYSTEMS OVER TO NEW INFRASTRUCTURE.

COORDINATE WITH VA COR AND A/E TEAM.

6. CONTRACTOR TO CONSISTENTLY CHECK SPOILS OF

EXCAVATION FOR CULTURAL ARTIFACTS. IN THE CASE OF

FINDING CULTURAL ARTIFACTS CONTRACTOR TO CEASE

EXCAVATION AT THE LOCATION AND IMMEDIATELY ALERT COR.

7. CONTRACTOR SHALL MAKE ALL NEW CONDUITS AND

MANHOLES WATER TIGHT.

8. CONTRACTOR SHALL MAKE ALL PENETRATIONS INTO EXISTING

MANHOLES WATER TIGHT. THIS IS TO INCLUDE EXISTING

CONDUIT PENETRATIONS.

9. NEW CONDUIT PATHWAYS AS DEPICTED ARE INTENDED TO BE

DIAGRAMMATIC. THE PATHWAYS AS SHOWN INDICATE

CONNECTIONS BETWEEN BUILDINGS AND/OR STRUCTURES.

ACTUAL FIELD INSTALLATION SHALL AVOID ALL AREAS WITHIN

TREE DRIP LINES AND ANY DEVIATION FROM STRAIGHT

CONDUIT RUNS MUST UTILIZE ELBOWS WITH RADIUS AS

ALLOWED BY SPECIFICATIONS.

10. ALL NEW CONDUIT SHALL BE LABELED AT BOTH ENDS.

11. PROVIDE TYPE 504-LA, WITH DRIVE OVER COVER, FOR ALL

NEW MAN HOLES.

12. SEE FIBER AND COPPER SCHEDULES AND GENERAL NOTES

ON SHEET TG0001.

13. ALL NEW CONDUIT DUCT BANK TO BE ENCASED IN 3000 PSI

CONCRETE DYED ORANGE.

PLAN NOTES

1 PROVIDE NEW MANHOLE, TYPE 504-LA, WITH DRIVE OVER COVER.

PROVIDE NEW CONDUIT(S) ON TOP OF OR ADJACENT TO EXISTING

DUCTBANK. PROVIDE NEW CONDUIT SPACERS AND NEW CONDUIT,

CONCRETE ENCASE, BACKFILL, COMPACT, AND RESTORE EXISTING

SURFACE OF NEW TRENCH AS REQUIRED.

EXISTING MANHOLE TO REMAIN. PROVIDE CORE-DRILLING TO

CONNECT NEW CONDUITS TO EXISTING MANHOLE.

PROVIDE NEW CONDUIT DUCTBANK.

3 3

X X X X X X X X X X XXXXXXXXXXXXXXXXXXXXXX

SS SS SS

WM

7 49 48

66T-7

756968

35 4

121126125124

147 146

49P

(E)TMH

(E)TMH

(E)TMH (E)TMH

(E)TMH (E)TMH

(E)TMH

(E)TMH (E)TMH

(E)TMH

P P

P P

P P

P

P

PPP

P P P P P

P P P P P P P

P

P

P

S S

S

S S S S S

P

P

P

(N)TMH

(N)TMH

(N)TMH

SS

S

S

S

S

S S

S S S S

S S S

(N)TMH

(N)TMH

S

SSSSSSSSSS

S S

S S

S S

S

SS

S S

(N)TMH

(N)TMH

(N)TMH

(1) 4"C 49P

(1) 4"C

48P

(1) 4"C 49P48P

86P

(1) 4"C 49P48P 86P

(1) 4"C 140P

(1) 4"C 49P48P

86P 140P

(1) 4"C 145P

145P

143S

(1) 4"C

(2) 4"C.O. - SPARE

69P

(1) 4"C

(1) 4" C.O. - SPARE

78P T1P T2P 77P

75P

76P 82P 135P

(2) 4"C

(1) 4" C.O. - SPARE

78P

T1P T2P

77P75P

63P 65P 68P 69P

80P 81P

66P T7P

76P 82P 135P

(3) 4"C

78P

T1P T2P

77P 75P63P 65P 68P 69P

80P 81P 66P

T7P 49P48P

86P 140P 145P143P

140S

(1)4"C - FIBER

(1)2" C - COPPER

49S

(1) 4"C - FIBER

(1)2" C - COPPER

48S

143P

(1)4"C - FIBER

(1)2" C - COPPER

140S

49S

(N)TMH

140S48S

68S

T2ST1S 77S

T2ST1S77S

75S

78S

78S75S

69S

(1)4"C - FIBER

(1)2"C - COPPER

80S

135S82S 65S63S

80S 81S76S

69ST2ST1S

77S 78S 75S

T7S

145S

145S T7S

145ST7S

SS

66S

SS

P P P P P P P P P P P P P P P P P P P

1S

1S

1S

(1) 4"C 1P

(1) 4"C 1P

(1) 4"C 1P1P

1P

1P

1P

1P

(3)4"C - COPPER

T2S

77S

(1)4"C - FIBER

(1)2"C - COPPER

1S

(1) 4"C 1P

(1) 4"C 75P

P P

(1) 4"C 48P

(1) 4"C 68P

P P

48T

49T

49T 140T48T

(1) 4"C - FIBER

(1)2" C - COPPER

140T

(1) 4"C - FIBER

(1)2" C - COPPER

140T

49S 140S48S

49T 140T48T

86S86T

(1)4"C - FIBER

(1)2" C - COPPER

76T 82T 135T

78T

T1T T2T

77T75T 63T 65T 68T

69T 80T 81T

66T T7T

49T 48T

86T 140T 145T143T

1T

68T

(1)4"C - FIBER

(1)2" C - COPPER

145TT7T 66T

(1) 4"C - FIBER

(1) 4" C - COPPER

(1) 4"C - FIBER

(1)2" C - COPPER

66S 66T

145T T7T

(1) 4"C - FIBER

(1) 4" C - COPPER

145T

(1) 4"C - FIBER

(1)2" C - COPPER

(1) 4"C - FIBER

(1)2" C - COPPER

T7T

135T82T 65T63T

80T 81T76T

69TT2TT1T

77T 78T 75T1T

(2)4"C - FIBER

(2)4" C - COPPER

(2)4" C.O. - SPARE

69T

(1)4"C - FIBER

(1)2" C - COPPER

T2TT1T77T 78T75T 1T

(1)4"C - FIBER

(1)4" C - COPPER

(2)4" C.O. - SPARE

75T

(1)4"C - FIBER

(1)2" C - COPPER

78T

(1)4"C - FIBER

(1)2" C - COPPER

T2TT1T 77T1T

(1)4"C - FIBER

(1)4" C - COPPER

80T

1T

77T

(1)4"C - FIBER

(1)2"C - COPPER

T2T

(1)4"C - FIBER

(1)2"C - COPPER

S S S

P

76S 82S 135S

78S

T1S T2S

77S 75S63S 65S 68S 69S

80S 81S 66S

T7S 49S48S

86S 140S 145S143S

1S

S

S S S

(2)4"C - COPPER

2 2 2 2

(E)TMH

3 3

2 (N)TMH

(N)TMH

(1) 4"C 69P

(2) 4"C.0 - SPARE

(3) 4"C.0. - SPARE

(3)4" C.O. - SPARE(3)4" C.O. - SPARE

(3)4" C.O.

- SPARE

S S

143T

(1) 4"C - FIBER

(1)2" C - COPPER

76T 82T 135T

78T

T1T T2T

77T75T 63T 65T 68T

69T 80T 81T

66T T7T

49T 48T

140T 145T

1T

(1)4"C - FIBER

(2)4"C - COPPER

86S 143S

143P

143P

CRNP

CRNP

P P

P

P P

P P

P P

P

P P

PPPPPPP

P P

(N)TMH

P P

P P

P P P P P P

P

P

P P

P P

P P

P P

P P

(1) 4"C 49P 48P

86P140P 1P

143P

S S

S S

135S82S 65S63S 80S

81S 76S

S

(1)4"C - FIBER

(1)2" C - COPPER

135T82T 65T63T 80T

81T 76T

(1)4"C - FIBER

(1)4" C - COPPER

(2) 4"C.0 - SPARE

S S

S

S

P P

S S

S

S S

S S

S S

S S

S S

S S S S S S S S S S

S S

S S

S S

S S

S S

S

S

S S S S S S S S S

SS

SS

S

(N)TMH

S S

S

T1 T1

T1

T1

T1

T1

T1

T1

T1 T1

T1

T1

T1

T1 T1

T1 T1

T1

X

X

X X X

X X X X

X X X X X

X X

X X

X X

X X

X X

X X

X X

X X X

X X

X X

X X

X X

X X

X X

X X X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

XX

XX

XX

X X

X X

X X

X X

X X

X X

XXXXXXXXXXXXXXXXXXXX

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X X X X X X X X X

X X

X

X

X X

X

X

X

X

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX X X X X X X

X X X

X X

X

X

X

X

X

X X

X X

X X

X

X

X

XXX

X X

X

X

X

X

X

X X

X X

X X

X

X

X

X X X X

X X

X

X

X

X

X

XX

X X

X X

X

X

X

X X

X X

X X

X

X

X

X

X

X X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X X

X

X

X

X

X

STATE NURSING HOME

STATE NURSING HOME

STATE NURSING HOME

STATE NURSING HOME

N U

R S

IN

G

H O

M E

FU

TU

R E

B

LD

G

SS SS SS

WM

7 49 48

66T-7

77T-1

T-2

756968

116119

121126125124

109CM

147 146

WATER TOWER

ES0001

ES0002 ES0003

ES0002

TELECOMMUNICATION PARTIAL SITE

PLAN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

RECORDS DOCUMENTOffice of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Hood River Engineers 1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128 Dave Clem

VA WALLA WALLA FIRE LIFE

SAFETY REPLACEMENT - PHASE A

WALLA WALLA, WA

687-18-101

Project Director

Revisions: Date:

FLS

06/05/23 DJC ANH

DRAFT DESIGN DEVELOPMENT 08/03/20

RECORDS DOCUMENT

FINAL DESIGN DEVELOPMENT 09/10/20

65% SUBMITTAL 10/23/20

95% CONSTRUCTION DOCUMENTS 12/07/20

FINAL CONSTRUCTION DOCUMENTS 01/05/21

RECORDS DOCUMENT 06/05/23

KEY PLAN

GENERAL NOTES

1. REFER TO NEW CAMPUS FIBER LOOP SCHEDULES FOR MORE

INFORMATION.

2. ALL FIBER CABLING ROUTED IN 3-CELL MAXCELL INNERDUCT.

3. THERE SHALL BE (3)3 INCH 3-CELL MAXCELL INNERDUCT PER

4" CONDUIT (TOTAL OF 9 PATHWAYS PER 4" CONDUIT).

4. ALL FIBER OPTIC CABLES RAN IN BUILDING FROM MDF TO IDF

TO BE FACTORY TERMINATED WITH MPO CONNECTORS. ALL

BUILDING TO BUILDING FIBER OPTIC CABLES ARE TO BE FIELD

TERMINATED WITH MPO CONNECTORS. ALL LENGTHS LISTED

IN MATRIX, SHOWN ON TG0001, ARE APPROXIMATE. IT IS THE

CONTRACTORS SOLE RESPONSIBILITY TO VERIFY REQUIRED

LENGTHS PRIOR TO PURCHASE OF FACTORY TERMINATED

CABLES. CONTRACTOR SHALL PROVIDE 10' OF ADDITIONAL

LENGTH AT EACH END AND 16' WITHIN EACH VAULT FOR

SERVICE LOOPS AS WELL AS ANY ADDITIONAL LENGTH AS

NOTED IN TNxxxx DRAWINGS.

5. DEMOLITION OF ALL EXISTING CABLES TO BE PERFORMED

ONLY AFTER NEW CABLING IS INSTALLED, TERMINATED AND

VA HAS CUT SYSTEMS OVER TO NEW INFRASTRUCTURE.

COORDINATE WITH VA COR AND A/E TEAM.

6. CONTRACTOR TO CONSISTENTLY CHECK SPOILS OF

EXCAVATION FOR CULTURAL ARTIFACTS. IN THE CASE OF

FINDING CULTURAL ARTIFACTS CONTRACTOR TO CEASE

EXCAVATION AT THE LOCATION AND IMMEDIATELY ALERT COR.

7. CONTRACTOR SHALL MAKE ALL NEW CONDUITS AND

MANHOLES WATER TIGHT.

8. CONTRACTOR SHALL MAKE ALL PENETRATIONS INTO EXISTING

MANHOLES WATER TIGHT. THIS IS TO INCLUDE EXISTING

CONDUIT PENETRATIONS.

9. NEW CONDUIT PATHWAYS AS DEPICTED ARE INTENDED TO BE

DIAGRAMMATIC. THE PATHWAYS AS SHOWN INDICATE

CONNECTIONS BETWEEN BUILDINGS AND/OR STRUCTURES.

ACTUAL FIELD INSTALLATION SHALL AVOID ALL AREAS WITHIN

TREE DRIP LINES AND ANY DEVIATION FROM STRAIGHT

CONDUIT RUNS MUST UTILIZE ELBOWS WITH RADIUS AS

ALLOWED BY SPECIFICATIONS.

10. ALL NEW CONDUIT SHALL BE LABELED AT BOTH ENDS.

11. PROVIDE TYPE 504-LA, WITH DRIVE OVER COVER, FOR ALL

NEW MAN HOLES.

12. SEE FIBER AND COPPER SCHEDULES AND GENERAL NOTES

ON SHEET TG0001.

13. ALL NEW CONDUIT DUCT BANK TO BE ENCASED IN 3000 PSI

CONCRETE DYED ORANGE.

SCALE:

TELECOMMUNICATION PARTIAL SITE PLAN

1"=40'-0"

40' 80'

PLAN NOTES

1 PROVIDE NEW MANHOLE, TYPE 504-LA, WITH DRIVE OVER COVER.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .