This document is a comprehensive set of record drawings for a telecommunications infrastructure upgrade project at the VA Walla Walla medical campus. The project involves replacing existing fiber optic and copper backbone cabling across the entire campus, including new vaults, conduits, and pathways for primary and secondary fiber loop infrastructure. The scope includes routing new fiber optic cables between multiple buildings (Buildings 1, 63, 65, 68, 74, 75, 76, 77, 78, 80, 81, 82, 135, 143, 145, and others) using innerduct and supporting J-hooks, with factory-terminated MPO connectors for building-to-building and in-building connections. The drawings detail the telecommunication infrastructure plans, site plans, demolition plans, and technical details for conduit penetrations and equipment mounting, with specifications for both fiber and copper voice backbone systems.
The project documents include detailed technical requirements such as routing new 24-strand and 48-strand singlemode and multimode fiber optic cables, installing new communication cabinets, and removing existing infrastructure after new systems are operational. The design emphasizes careful coordination, with contractors required to verify cable lengths, provide service loops, and coordinate with VA Contracting Officer Representatives (COR). The project covers multiple buildings' telecommunications rooms, including Main Distribution Frames (MDF) and Intermediate Distribution Frames (IDF), with a focus on creating a robust, modern telecommunications infrastructure that supports the VA Walla Walla medical campus's communication needs.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
X
X
X X
X
X
X
X
XX
X X
X
X XXXXX X
X X
X
X
X
X
X
X
X
STATE NURSING HOME
STATE NURSING HOME
STATE NURSING HOME
STATE NURSING HOME
FU
TU
R E
S
TA
TE
N
U R
S
IN
G H
O M
E
FU
TU
R E
B
LD
G
7 49 48
66T-7
77T-1
T-2
756968
116119
121126125124
CM
147 146
WATER TOWER
141 X
X X
X X
X
X
X
X
XX
X X
X
X XXXXX X
X X
X
X
X
X
X
X
X
STATE NURSING HOME
STATE NURSING HOME
STATE NURSING HOME
STATE NURSING HOME
FU
TU
R E
S
TA
TE
N
U R
S
IN
G H
O M
E
FU
TU
R E
B
LD
G
7 49 48
66T-7
77T-1
T-2
756968
116119
121126125124
CM
147 146
WATER TOWER
GI001
U.S. Department of Veterans Affairs
VA WALLA WALLA - FIRE LIFE SAFETY - PHASE A
1 PROJECT LOCATION
SCALE: NTS
RECORDS DOCUMENT
77 WAINWRIGHT DRIVE
WALLA WALLA, WA 99362
SCALE: NTS
COVER SHEET
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
RECORDS DOCUMENTOffice of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Hood River Engineers 1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128 Dave Clem
VA WALLA WALLA FIRE LIFE
SAFETY REPLACEMENT - PHASE A
WALLA WALLA, WA
687-18-101
Project Director
Revisions: Date:
FLS
06/05/23 DJC ANH
DRAFT DESIGN DEVELOPMENT 08/03/20
RECORDS DOCUMENT
FINAL DESIGN DEVELOPMENT 09/10/20
65% SUBMITTAL 10/23/20
95% CONSTRUCTION DOCUMENTS 12/07/20
FINAL CONSTRUCTION DOCUMENTS 01/05/21
RECORDS DOCUMENT 06/05/23
PROJECT DESCRIPTION
THIS PROJECT SHALL REPLACE EXISTING FIBER OPTIC CABLING WITH NEW HIGHER PERFORMANCE FIBER OPTIC CABLING AND REPLACE EXISTING COPPER BACKBONE SYSTEM ACROSS THE ENTIRE CAMPUS AS WELL AS IN THE BUILDINGS FROM MDFS TO IDFS. PROJECT INCLUDES NEW VAULTS AND CONDUIT FOR SECONDARY FIBER LOOP INFRASTRUCTURE, NEW CONDUIT AS SHOWN UTILIZING EXISTING VAULTS AND NEW VAULTS FOR PRIMARY
PATHWAYS TO BUILDINGS AND NEW PATHWAYS FOR COPPER BACKBONE TO BUILDINGS.
C CENTERLINE
Δ DEFLECTION
° DEGREES
⌀ DIAMETER
" INCHES
' FEET
# NUMBER
x BY (i.e. 2x4)
ABS ACRYLONITRILE BUTADIENE STYRENE
A/C AIR CONDITIONING
ACT ACOUSTICAL CEILING TILE
AISC AMERICAN INSTITUTE OF STEEL CONSTRUCTION
AITC AMERICAN INSTITUTE OF TIMBER CONSTRUCTION
AFF ABOVE FINISH FLOOR
ALT ALTERNATE, ALTERNATIVE
ANSI AMERICAN NATIONAL STANDARD INSTITUTE
ASCE AMERICAN SOCIETY OF CIVIL ENGINEERS
ASTM AMERICAN SOCIETY OF TESTING AND MEASUREMENT
AWS AMERICAN WELDING SOCIETY
BATT BATT INSULATION
BLDG BUILDING
BLK BLOCK
BLKG BLOCKING
BO BOTTOM OF
BOC BACK OF CURB
BOCA BUILDING OFFICIALS CODE ADMINISTRATORS
BOT BOTTOM
CB CATCH BASIN
Ce SNOW EXPOSURE FACTOR
CFCI CONTRACTOR FURNISHED CONTRACTOR INSTALLED
CFOI CONTRACTOR FURNISHED OWNER INSTALLED
CG CORNER GUARD
CJ CONTROL JOINT
CL CENTER LINE
CLR CLEARANCE
CMU CONCRETE MASONRY UNIT
CO COMPANY
CO2 CARBON DIOXIDE
CPT CARPET
CS SEISMIC RESPONSE COEFFICIENT
CSC CONVENTION FOR SAFE CONTAINERS
CT SNOW THERMAL FACTOR
CTR CENTER
d PENNY
DEMO DEMOLITION
DF DOUGLAS FIR
DIA DIAMETER
DIM DIMENSION
DN DOWN
DW DISHWASHER
DOR DESIGNER OF RECORD
(E) EXISTING
EA EACH
EIT ENGINEER IN TRAINING
EJ EXPANSION JOINT
EL ELEVATION
EXT EXTENSION OR EXTERIOR
F&I FURNISH AND INSTALL
FA FIRE ALARM
Fa SEISMIC SITE COEFFICIENT Fb BENDING STRENGTH OF WOOD f'c COMPRESSIVE STRENGTH OF CONCRETE
FE FIRE EXTINGUISHER AND BRACKET
FEC FIRE EXTINGUISHER CABINET
FF FINISHED FLOOR
FND FOUNDATION
FO FACE OF
FOF FACE OF FINISH
FOM FACE OF MASONRY
FOS FACE OF STUD
FOW FACE OF WALL
FT FEET
FT3 CUBIC FEET
Fv BASE SHEAR Fy YIELD STRENGTH OF STEEL
G GRAVITY
GA GAUGE
GALV GALVANIZED
GCPI INTERNAL PRESSURE COEFFICIENT
GYP GYPSUM
GYPSH GYPSUM SHEATHING
HAC HOUSEKEEPING AID CLOSET
HP HELICAL PIER
HSK HOUSEKEEPING
HSS HOLLOW STEEL SECTION
HT HEIGHT
HVAC HEATING, VENTILATION, & AIR CONDITIONING
I INERTIA
IBC INTERNATIONAL BUILDING CODE
ICBO INTERNATIONAL COMMITTEE OF BUILDING OFFICIALS
ICRA INFECTION CONTROL RISK ASSESSMENT
IDF INTERMEDIATE DISTRIBUTION FRAME
ILSM INTERIM LIFE SAFETY MEASURE
IN INCHES
ISO INTERNATIONAL ORGANIZATION FOR
STANDARDIZATION
ƪW WELD LENGTH
JAN JANITOR
JC JANITOR'S CLOSET
k STIFFNESS
KG KILOGRAM
KGS KILOGRAMS
KIP 1000 POUNDS
KSI KIPS PER SQUARE INCH
LAV LAVATORY
LBS POUNDS
MAX MAXIMUM
MDF MAIN DISTRIBUTION FRAM
MI MIRROR
MIN MINIMUM, MINUTE
MINS MINUTES
MM MILLIMETER
MPH MILES PER HOUR
(N) NEW
NER NATIONAL EVALUATION REPORT
NES NATIONAL EXPORT SYSTEM
NIC NOT IN CONTRACT
NO. NUMBER
NSF NET SQUARE FEET
NTS NOT TO SCALE
OC ON CENTER
OCEW ON CENTER EACH WAY
OD OVERFLOW DRAIN
OFCI OWNER FURNISHED CONTRACTOR INSTALLED
OFOI OWNER FURNISHED OWNER INSTALLED
OH OVERHEAD
OR OREGON
OSB ORIENTED STRAND BOARD
OSSC OREGON STRUCTURAL SPECIALTY CODE
PCS PIECES
PE PROFESSIONAL ENGINEER
Pf SNOW LOAD FLAT ROOF Pg SNOW LOAD GROUND
PL PLATE OR PROPERTY LINE
PLS PROFESSIONAL LAND SURVEYOR
Ps SNOW LOAD SLOPED ROOF
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT PRESSURE TREATED
PWD PLYWOOD
QTY QUANTITY
R RADIUS, RIGIDITY, RESISTANCE,
RD ROOF DRAIN
REF REFERENCE
REQD REQUIRED
RF RESILIENT FLOORING
RHO REDUNDANCY FACTOR
RM ROOM
RO ROUGH OPENING
SBCI SUSTAINABLE BUILDINGS AND CONSTRUCTION
INITIATIVE
SDS DESIGN SPECTRAL ACCELERATION, 0.2 SEC
SEC SECONDS
SPEC SPECIFICATION
SF SQUARE FEET
SQ MM SQUARE MILLIMETER
Ss MAPPED ACCELERATION PARAMETER
SS STAINLESS STEEL
SYM SYMBOL OR SYMETRICAL
T&G TONGUE AND GROOVE
TD TRENCH DRAIN
THK THICK(NESS)
TO TOP OF
TOD TOP OF DECK
TOP TOP OF PARAPET
TOS TOP OF SLAB
TOW TOP OF WALL
TYP TYPICAL
U ULTIMATE CAPACITY
UNO UNLESS NOTED OTHERWISE
VCT VINYL COMPOSITE TILE
VERT VERTICAL
VIF VERIFY IN FIELD
W/ WITH
WD WOOD
WH WATER HEATER
WPS WELDED PROCEDURE SPECIFICATION
WWF WELDED WIRE FABRIC
TYPICAL ABBREVIATIONS
GENERAL PROJECT NOTES
1. IT IS SUGGESTED THAT THE CONTRACTOR VISIT THE PROJECT SITE PRIOR TO BIDDING TO BECOME FAMILIAR WITH THE EXISTING SITE CONDITIONS, SECURITY PROVISIONS, LAYDOWN AREA AND OTHER
SITE SPECIFIC GENERAL CONDITIONS WHICH MAY AFFECT THE BID VALUE OF THIS PROJECT.
2. THE DRAWINGS SHALL BE WORKED IN CONJUNCTION WITH THE SPECS. THE SPECS FORMS A PART OF
THE CONTRACT DOCUMENTS AND CONTAINS ADDITIONAL INFORMATION REQUIRED TO CONSTRUCT
THE WORK OF THIS CONTRACT. IN THE EVENT OF A CONFLICT BETWEEN THE DRAWINGS AND THE
SPECS NOTIFY THE COR FOR CLARIFICATION SEVEN DAYS BEFORE BEGINNING WORK ON THE
AFFECTED ACTIVITIES.
3. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS PRIOR TO THE START
OF WORK. NOTIFY THE COR OF ANY SIGNIFICANT CHANGES IN DIMENSIONS OR CONDITIONS.
4. THE CONTRACTOR SHALL PROVIDE ALL MATERIALS, TOOLS, EQUIPMENT AND NECESSARY FACILITIES, AND PERFORM ALL LABOR AND SERVICES OF EVERY DESCRIPTION AS MAY BE NECESSARY TO
COMPLETE THE SCOPE OF WORK DEFINED ON THE DRAWINGS AND SPECS.
5. THE CONTRACTOR SHALL ARRANGE FOR AND OBTAIN ALL VA ISSUED PERMITS (HOTWORK, ICRA, SATURDAY, SHUTDOWN, ETC.), CERTIFICATES, INSPECTIONS, DEPARTMENT APPROVALS, ETC. FOR
WORK PERFORMED UNDER THIS CONTRACT. PROVIDE COPIES OF ALL REQUIRED PERMITS,
CERTIFICATES, INSPECTIONS AND AGENCY APPROVALS TO THE ENGINEER INCLUDING BUT NOT
LIMITED TO ICRA AND IFLS.
6. FABRICATE AND INSTALL ALL WORK IN STRICT ACCORDANCE WITH THE SPECS, ALL APPLICABLE STATE
AND LOCAL CODES, AND THE GENERAL AND SUPPLEMENTARY CONDITIONS OF THE CONTRACT.
7. ALL CONTRACTORS AND SUBCONTRACTORS SHALL BE RESPONSIBLE FOR THE PROPER
PERFORMANCE OF THEIR WORK, COORDINATING WITH OTHER TRADES, MEANS AND METHODS OF
CONSTRUCTION, SAFETY AND SECURITY ON SITE.
8. CUTTING AND PATCHING SHALL BE PERFORMED BY EACH TRADE AS NECESSARY FOR THE
PERFORMANCE AND INSTALLATION OF THEIR WORK. CUTTING AND PATCHING SHALL BE PERFORMED
IN A WORKMANLIKE MANNER CONSISTENT WITH INDUSTRY STANDARDS FOR FINISHES AND
SUBSTRATES AFFECTED.
9. THE CONTRACTOR SHALL PROTECT THE FACILITY FROM WEATHER AND MAINTAIN SECURITY DURING
ALL CONSTRUCTION WORK.
10. PROTECT EXISTING PROPERTY DURING CONSTRUCTION. REPAIR OR REPLACE, WITHOUT ADDITIONAL CHARGE TO THE OWNER, ANY EXISTING WORK DAMAGED DURING THE COURSE OF CONSTRUCTION.
11. THE WORK SHALL BE COORDINATED IN GOOD FAITH WITH THE A/E AND ALL GOVERNMENT EMPLOYEES
14 DAYS IN ADVANCE OF BEGINNING EACH CONSTRUCTION ACTIVITY.
12. UNLESS ITEMS OF MATERIAL, EQUIPMENT OR WORK ARE SPECIFICALLY NOTED TO BE PROVIDED OR
FURNISHED BY OTHERS, THEY SHALL BE PROVIDED UNDER THIS CONTRACT.
13. ALL WORK SHALL BE PERFORMED BY SKILLED WORKERS IN A WORKMANLIKE AND PROFESSIONAL
MANNER CONSISTENT WITH INDUSTRY STANDARDS.
14. MATERIALS AND COMPONENTS AS SPECIFIED CONSTITUTE A STANDARD OF QUALITY, UNLESS
OTHERWISE NOTED. EQUAL SUBSTITUTES WILL BE ACCEPTABLE ONLY WITH WRITTEN PRIOR
APPROVAL BY THE CONTRACTING OFFICER SEVEN DAYS BEFORE BIDS ARE DUE. DO NOT ASSUME
EQUALITY AND SUBMIT SHOP DRAWINGS FROM ALTERNATE VENDORS WHO HAVE NOT BEEN
APPROVED IN WRITING BY THE ENGINEER. IN THE EVENT THIS HAPPENS, THE CONTRACTOR SHALL PROVIDE THE SYSTEM USED IN THE BASIS OF DESIGN AT NO ADDITIONAL COST TO THE OWNER.
15. THE CONTRACTOR SHALL LEAVE THE SITE IN PROPER WORKING ORDER AND SHALL, WITHOUT ADDITIONAL CHARGE, REPLACE ANY WORK, MATERIALS, OR EQUIPMENT FURNISHED AND INSTALLED
UNDER THE CONTRACT WHICH DEVELOPS DEFECTS, EXCEPT FROM ORDINARY WEAR AND TEAR,
WITHIN ONE (1) YEAR FROM THE DATE OF FINAL ACCEPTANCE BY THE OWNER.
16. CONTRACTOR SHALL SCHEDULE, COORDINATE, AND FACILITATE ALL POWER OUTAGES AND
SHUTDOWNS. POWER OUTAGES AND SHUTDOWNS MUST BE SCHEDULED WITH THE VA COR, 1-WEEK
PRIOR TO OUTAGE.
BASIC DEFINITIONS
"OWNER": THE OWNER IS UNITED STATES GOVERNMENT - DEPT. OF VETERANS AFFAIRS; VA MEDICAL CENTER,9600 VETERANS DR SW TACOMA, WA 98493, AND IS REFEREED TO THROUGHOUT THE CONTRACT DOCUMENTS AS IF SINGULAR IN NUMBER. THE TERM "OWNER"
MEANS THE OWNER OR THE OWNER'S AUTHORIZED REPRESENTATIVE.
"CONTRACTING OFFICER" OR "C.O.": THE OWNER'S AUTHORIZED REPRESENTATIVE RESPONSIBLE FOR ADMINISTRATING THE CONTRACT BETWEEN HOOD RIVER ENGINEERS AND OWNER. THE TERM INCLUDES CERTAIN AUTHORIZED REPRESENTATIVES OF THE CONTRACTING OFFICER ACTING WITHIN THE LIMITS OF THEIR AUTHORITY AS DELEGATED BY THE CONTRACTING OFFICER.
"CONTRACTING OFFICER'S REPRESENTATIVE", "C.O.R.": MEANS THE CONTRACTING OFFICER'S AUTHORIZED REPRESENTATIVE, IN PART, RESPONSIBLE FOR MONITORING THE CONTRACTOR'S (PLURAL) PERFORMANCE.
"WORK": THE TERM "WORK" MEANS THE CONSTRUCTION AND SERVICES REQUIRED BY THE CONTRACT DOCUMENTS, WHETHER COMPLETED OR PARTIALLY COMPLETED, AND INCLUDES ALL OTHER LABOR, MATERIALS, EQUIPMENT AND SERVICES PROVIDED BY THE CONTRACTOR TO FULFILL THE CONTRACTOR'S OBLIGATIONS. THE WORK MAY CONSTITUTE THE WHOLE OR A PART OF THE PROJECT.
"PROJECT": THE TOTAL CONSTRUCTION OF WHICH THE WORK PERFORMED UNDER THE CONTRACT DOCUMENTS
"DRAWINGS", "SHOP DRAWINGS" OR "PLANS" THE GRAPHIC AND PICTORIAL PORTIONS OF CONTRACT DOCUMENTS, WHENEVER LOCATED AND WHENEVER ISSUED, SHOWING DESIGN, LOCATION AND DIMENSIONS OF THE WORK, GENERALLY INCLUDING PLANS, ELEVATIONS, SECTIONS, DETAILS, SCHEDULES AND DIAGRAMS.
"PROJECT SUPERVISOR" OR "SUPERVISOR": MEANS THE ON-SITE SUPERVISION REPRESENTATIVE OF THE PROJECT.
"ARCHITECT" OR "ENGINEER": MEANS THE VA'S ARCHITECTS, ENGINEERS AND OTHER DESIGN AND ENGINEERS PROFESSIONALS FOR
THIS PROJECT, AND REFERRED THROUGHOUT THE DRAWINGS AS IF SINGULAR IN NUMBER.
"TRADE CONTRACTOR" OR "CONTRACTORS": MEANS THE ENTITY UNDER CONTRACT AGREEMENT WITH THE GENERAL CONTRACTOR TO PROVIDE THE SPECIFIED GENERAL AND OR SPECIALTY WORK IN CONNECTION WITH THIS PROJECT.
"FURNISH" OR "FURNISHED": MEANS PROVIDING ALL MATERIALS, SHOP DRAWINGS, TRANSPORTATION, INSURANCE, FIELD MEASUREMENTS, EXPEDITING, SHIPPING, HANDLING, PACKAGING, STORAGE, TOUCH-UP MATERIALS, OWNER'S MANUALS, TRAINING AND
ANY OTHER ACCESSORIES REQUIRED FOR A COMPLETE INSTALLATION.
"INSTALL" OR "INSTALLED": MEANS COMPLETING ALL WORK AND COSTS ASSOCIATED WITH UNLOADING, UNPACKING, HOISTING, STORAGE, HANGERS, SUPPORTS,SLEEVES, SCAFFOLDING, COORDINATION, LAYOUT, SHOP DRAWINGS, EXCAVATION, BACKFILL, DEWATERING, INSTALLATION, CUTTING AND PATCHING, FIRESTOPPING, CLEAN-UP, INSPECTION, DOCUMENTATION, PROTECTION OF SCOPE OF WORK AND ALL ACCESSORIES, SERVICE AND FACILITIES REQUIRED FOR A COMPLETE INSTALLATION.
"PROVIDE" OR "PROVIDED": MEANS TO FURNISH AND INSTALL AND SHALL INCLUDE, WITHOUT LIMITATION, ALL LABOR, MATERIALS, EQUIPMENTS, TRANSPORTATION SERVICES, AND OTHER ITEMS REQUIRED TO COMPLETE THE REFERENCED TASK.
"BY OWNER"; "BY VAMC" OR "BY VA": MEANS ITEMS WILL BE ORDERED, PAID FOR, SHIPPED TO THE JOB SITE AND INSTALLED BY THE
OWNER.
"NOT IN CONTRACT" OR "N.I.C.": MEANS MATERIALS OR EQUIPMENT NOT IN THE CONTRACT, BUT MAY REQUIRE PROVISIONS IN THE
CONSTRUCTION FOR FUTURE INSTALLATION AS SPECIFIED OR SHOWN.
TYPICAL SYMBOLS
DETAIL INDICATOR
DETAIL INDICATOR
DETAIL INDICATOR FOR
SMALL CONDITIONS
DIMENSION LINE
KEYNOTE
DETAIL INDICATOR
PROJECT PHASING NOTES
PHASE 1: CONTRACTOR TO PERFORM ALL INTERIOR DATA, FIBER WORK AND NEW SITE CONDUITS TO
EXISTING VAULT AS SHOWN ON THE CONTRACT DOCUMENTS FOR BUILDING 74.
PHASE 2: CONTRACTOR TO PROVIDE ALL WORK FOR ROUTING OF PRIMARY FIBER OPTIC CABLING FROM
BUILDING 74 TO BUILDING 69 AND ALL INTERIOR DATA AND FIBER WORK AS SHOWN ON THE
CONTRACT DUCUMENTS FOR BUILDING 69. WHILE TRENCH IS OPEN FOR INSTALLATION OF FIBER
OPTIC CONDUIT, CONTRACTOR TO INCLUDE ALL CONDUITS WITHIN THE TRENCHING ZONE AS
SHOWN ON THE CONTRACT DOCUMENTS.
PHASE 3: CONTRACTOR TO PROVIDE ALL WORK FOR ROUTING OF PRIMARY FIBER OPTIC CABLING FROM
BUILDING 74 TO BUILDING 143 AND ALL INTERIOR FIBER WORK AS SHOWN ON THE CONTRACT
DUCUMENTS FOR BUILDING 143. WHILE TRENCH IS OPEN FOR INSTALLATION OF FIBER OPTIC
CONDUIT, CONTRACTOR TO INCLUDE ALL CONDUITS WITHIN THE TRENCHING ZONE AS SHOWN ON
THE CONTRACT DOCUMENTS.
PHASE 4: CONTRACTOR TO PROVIDE ALL WORK FOR ROUTING OF PRIMARY FIBER OPTIC CABLING FROM
BUILDING 74 TO BUILDING 145 AND ALL INTERIOR FIBER WORK AS SHOWN ON THE CONTRACT
DUCUMENTS FOR BUILDING 145. WHILE TRENCH IS OPEN FOR INSTALLATION OF FIBER OPTIC
CONDUIT, CONTRACTOR TO INCLUDE ALL CONDUITS WITHIN THE TRENCHING ZONE AS SHOWN ON
THE CONTRACT DOCUMENTS.
PHASE 5: CONTRACTOR TO PROVIDE ALL WORK FOR ROUTING OF PRIMARY FIBER OPTIC CABLING FROM
BUILDING 74 TO BUILDING 140 AND ALL INTERIOR FIBER WORK AS SHOWN ON THE CONTRACT
DUCUMENTS FOR BUILDING 140. WHILE TRENCH IS OPEN FOR INSTALLATION OF FIBER OPTIC
CONDUIT, CONTRACTOR TO INCLUDE ALL CONDUITS WITHIN THE TRENCHING ZONE AS SHOWN ON
THE CONTRACT DOCUMENTS.
PHASE 6: CONTRACTOR TO PROVIDE ALL WORK FOR ROUTING OF PRIMARY FIBER OPTIC CABLING FROM
BUILDING 74 TO BUILDING 68 AND ALL INTERIOR FIBER WORK AS SHOWN ON THE CONTRACT
DUCUMENTS FOR BUILDING 68. WHILE TRENCH IS OPEN FOR INSTALLATION OF FIBER OPTIC
CONDUIT, CONTRACTOR TO INCLUDE ALL CONDUITS WITHIN THE TRENCHING ZONE AS SHOWN ON
THE CONTRACT DOCUMENTS.
PHASE 7: ALL OTHER WORK NOT LISTED IN PHASE 1 THRU 6 ABOVE AS SHOWN IN CONTRACT DOCUMENTS.
NOTE: CONTRACTOR MAY WORK ON MULTIPLE PHASES OF PROJECT CONCURRENTLY. SITE WORK MAY BE PERFORMED CONCURRENTLY WITH ALL PHASES OF PROJECT. ALL WORK ASSOCIATED WITH PHASE 1
THRU 6 SHALL BE COMPLETED BY NO LATER THAN MARCH 15TH, 2021.
GI0001 COVER SHEET, VICINITY MAP, AND GENERAL REQUIREMENTS 01 OF 66
TG0001 TELECOMMUNICATION LEGEND AND SCHEDULES 02 OF 66
RC0001 EXISTING CONDITIONS PLAN 03 OF 66
CS0001 FIBER OPTICS SITE PLAN 04 OF 66
CU0101 PRIMARY FIBER OPTICS SITE PLAN 05 OF 66
CU0102 PRIMARY FIBER OPTICS PLAN AND PROFILE 06 OF 66
CU0103 PRIMARY FIBER OPTICS PLAN AND PROFILE 07 OF 66
CU0104 PRIMARY FIBER OPTICS PLAN AND PROFILE 08 OF 66
CU0201 PRIMARY FIBER OPTICS PLAN AND PROFILE 09 OF 66
CU0202 PRIMARY FIBER OPTICS PLAN AND PROFILE 10 OF 66
CU0203 PRIMARY FIBER OPTICS PLAN AND PROFILE 11 OF 66
CU0301 PRIMARY FIBER OPTICS PLAN AND PROFILE 12 OF 66
CU0302 PRIMARY FIBER OPTICS PLAN AND PROFILE 13 OF 66
CU0303 PRIMARY FIBER OPTICS PLAN AND PROFILE 14 OF 66
CU0401 PRIMARY FIBER OPTICS PLAN AND PROFILE 15 OF 66
CU0402 PRIMARY FIBER OPTICS PLAN AND PROFILE 16 OF 66
CU0403 PRIMARY FIBER OPTICS PLAN AND PROFILE 17 OF 66
CU0501 PRIMARY FIBER OPTICS PLAN AND PROFILE 18 OF 66
CU0502 PRIMARY FIBER OPTICS PLAN AND PROFILE 19 OF 66
CU0503 PRIMARY FIBER OPTICS PLAN AND PROFILE 20 OF 66
CU0600 SECONDARY FIBER OPTICS SITE PLAN 21 OF 66
CU0601 SECONDARY FIBER OPTICS PLAN & PROFILE 22 OF 66
CU0701 SECONDARY FIBER OPTICS PLAN & PROFILE 23 OF 66
CU0801 SECONDARY FIBER OPTICS PLAN & PROFILE 24 OF 66
CU0802 SECONDARY FIBER OPTICS PLAN & PROFILE 25 OF 66
CU0901 SECONDARY FIBER OPTICS PLAN & PROFILE 26 OF 66
CU0902 SECONDARY FIBER OPTICS PLAN & PROFILE 27 OF 66
CU0903 SECONDARY FIBER OPTICS PLAN & PROFILE 28 OF 66
CU0904 SECONDARY FIBER OPTICS PLAN & PROFILE 29 OF 66
CU01001 SECONDARY FIBER OPTICS PLAN & PROFILE 30 OF 66
CU01002 SECONDARY FIBER OPTICS PLAN & PROFILE 31 OF 66
CU01101 SECONDARY FIBER OPTICS PLAN & PROFILE 32 OF 66
CU01102 SECONDARY FIBER OPTICS PLAN & PROFILE 33 OF 66
CU01103 SECONDARY FIBER OPTICS PLAN & PROFILE 34 OF 66
CU01104 SECONDARY FIBER OPTICS PLAN & PROFILE 35 OF 66
CJ0001 PAVING AND LANDSCAPE REPAIR AND RESTORATION DETAILS 36 OF 66
CJ0002 STANDARD SITE DETAILS 37 OF 66
CJ0003 EROSION CONTROL DETAILS 38 OF 66
ED0001 TELECOMMUNICATION DEMOLITION SITE PLAN 39 OF 66
ED0002 TELECOMMUNICATION DEMOLITION SITE PLAN 40 OF 66
ED0003 TELECOMMUNICATION DEMOLITION SITE PLAN 41 OF 66
ES0000 TELECOMMUNICATION OVERALL SITE PLAN 42 OF 66
ES0001 TELECOMMUNICATION PARTIAL SITE PLAN 43 OF 66
ES0002 TELECOMMUNICATION PARTIAL SITE PLAN 44 OF 66
ES0003 TELECOMMUNICATION PARTIAL SITE PLAN 45 OF 66
TN0T11 TELECOMMUNICATIONS PLAN - BLDG T1, T2, 66 46 OF 66
TN0011 TELECOMMUNICATIONS PLAN - BLDG 1, T7, 135 47 OF 66
TN0481 TELECOMMUNICATIONS PLAN - BLDG 48 48 OF 66
TN0491 TELECOMMUNICATIONS PLAN - BLDG 49 49 OF 66
TN0631 TELECOMMUNICATIONS PLAN - BLDG 63, 65 50 OF 66
TN0681 TELECOMMUNICATIONS PLAN - BLDG 68 - BASEMENT & 2ND FLOOR 51 OF 66
TN0691 TELECOMMUNICATIONS PLAN - BLDG 69 - BASEMENT & 2ND FLOOR 52 OF 66
TN0741 TELECOMMUNICATIONS PLAN - BLDG 74 - FIRST FLOOR 53 OF 66
TN0742 TELECOMMUNICATIONS PLAN - BLDG 74 - SECOND FLOOR 54 OF 66
TN0743 TELECOMMUNICATIONS PLAN - BLDG 74 - ENLARGED PLANS 55 OF 66
TN0751 TELECOMMUNICATIONS PLAN - BLDG 75, 76, 77 56 OF 66
TN0781 TELECOMMUNICATIONS PLAN - BLDG 78 57 OF 66
TN0801 TELECOMMUNICATIONS PLAN - BLDG 80 58 OF 66
TN0811 TELECOMMUNICATIONS PLAN - BLDG 81, 82 59 OF 66
TN1401 TELECOMMUNICATIONS PLAN - BLDG 140 60 OF 66
TN1431 TELECOMMUNICATIONS PLAN - BLDG 143 - FIRST FLOOR 61 OF 66
TN1432 TELECOMMUNICATIONS PLAN - BLDG 143 - SECOND FLOOR 62 OF 66
TN1451 TELECOMMUNICATIONS PLAN - BLDG 145 63 OF 66
EJ0001 TELECOMMUNICATIONS DETAILS 64 OF 66
EJ0002 TELECOMMUNICATIONS DETAILS 65 OF 66
EJ0003 TELECOMMUNICATIONS DETAILS 66 OF 66
TG0001
TELECOMMUNICATION LEGEND AND
SCHEDULES
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
RECORDS DOCUMENTOffice of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Hood River Engineers 1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128 Dave Clem
VA WALLA WALLA FIRE LIFE
SAFETY REPLACEMENT - PHASE A
WALLA WALLA, WA
687-18-101
Project Director
Revisions: Date:
FLS
06/05/23 DJC ANH
DRAFT DESIGN DEVELOPMENT 08/03/20
RECORDS DOCUMENT
FINAL DESIGN DEVELOPMENT 09/10/20
65% SUBMITTAL 10/23/20
95% CONSTRUCTION DOCUMENTS 12/07/20
FINAL CONSTRUCTION DOCUMENTS 01/05/21
RECORDS DOCUMENT 06/05/23
SYMBOL
SYMBOL LEGEND - TELECOMM
DESCRIPTION
A, AMP AMPERE
ACP ACCESSIBLE CARD PATH
ADA AMERICAN DISABILITY ACT
AF AMP FRAME
AFC AVAILABLE FAULT CURRENT
AFCI ARC FAULT CIRCUIT INTERRUPTER
AFF ABOVE FINISHED FLOOR
AG ABOVE GROUND
AT AMP TRIP
ATS AUTOMATIC TRANSFER SWITCH
AL ALUMINUM
BKR BREAKER
C CONDUIT
CKT CIRCUIT
CO CONDUIT AND PULL-ROPE ONLY
COMM COMMUNICATION
CTRL CONTROL
CU COPPER
(E) EXISTING
EC, E.C. ELECTRICAL CONTRACTOR
ELEC ELECTRICAL
EM EMERGENCY
EQPT EQUIPMENT
(F) FUTURE
FA FIRE ALARM
FDR FEEDER
G, GND GROUND
GC, G.C. GENERAL CONTRACTOR
HH HANDHOLE
IDF INTERMEDIATE DISTRIBUTION FRAME
J-BOX JUNCTION BOX
LCP LIGHTING CONTROL PANEL
LTG LIGHTING
LTS LIGHTS
LV LOW-VOLTAGE
MH MANHOLE
N NEUTRAL
NEC NATIONAL ELECTRICAL CODE
OC ON-CENTER
OFCI OWNER-FURNISHED CONTRACTOR-INSTALLED
OFOI OWNER-FURNISHED OWNER-INSTALLED
OL OVERLOAD
P POLE
PB PULLBOX, PUSHBUTTON
PRI PRIMARY
(G) REVISED
REF REFERENCE, REFRIGERATOR
SEC SECONDARY
SOW SCOPE OF WORK
SPECS SPECIFICATIONS
SS STAINLESS STEEL
SW SWITCH
TEL TELEPHONE
TC TELECOMMUNICATION
THRU THROUGH
(TYP) TYPICAL
UG UNDERGROUND
UNO UNLESS NOTED OTHERWISE
VLT VAULT
W WIRE, WATT
WP WEATHERPROOF
ABBREVIATION LIST
1. PROVIDE COMPLETE WORK FOR REQUIREMENTS AS DESCRIBED ON
LEGEND. REFER TO OTHER DISCIPLINE DRAWINGS FOR LOCATIONS OF
EQUIPMENT AND DEVICES REQUIRED TO BE SUPPLIED WITH POWER.
2. INSTALLATION SHALL COMPLY WITH APPLICABLE CODES, INCLUDING,
BUT NOT LIMITED TO THE FOLLOWING: 2017 NATIONAL ELECTRICAL
CODE (NEC), VA STANDARDS AND REQUIREMENTS, LOCAL, STATE, AND
FEDERAL CODES AND ORDINANCES. AS WELL AS ALL BICSI
STANDARDS.
3. PRIOR TO PREPARATION OF BID, VISIT JOBSITE AND EXAMINE EXISTING
CONDITIONS. WORK SCOPE SHALL INCLUDE ALL COSTS FOR CUTTING,
PATCHING AND CORE DRILLING REQUIRED TO INSTALL CONDUIT AND
OTHER WIRING METHODS THROUGH EXISTING WALLS, FLOORS AND
OTHER BUILDING ELEMENTS (NOT SHOWN ON DRAWINGS).
4. PROVIDE SEPARATE AS BUILT SITE DRAWINGS, SHOWING ALL EXISTING
UNDERGROUND UTILITIES, AND ALL NEW UNDERGROUND UTILITIES.
5. PROVIDE TEMPORARY POWER FOR CONSTRUCTION. TEMPORARY
POWER MAY BE IN THE FORM OF PORTABLE GENERATOR SET;
CONNECTION TO UTILITIES COMPANY'S POWER SYSTEM OR EXISTING
FACILITY'S ELECTRICAL SYSTEM.
6. DO NOT TAKE MEASUREMENTS FROM PLANS FOR DEVICE LOCATIONS.
FIELD VERIFY EXACT DEVICE, EQUIPMENT LOCATIONS, AND MOUNTING
HEIGHTS WITH OWNER'S REPRESENTATIVE FOR PROPER
INSTALLATION.
7. SCHEMATIC DIAGRAMS AND RACEWAY ROUTING ARE SCHEMATIC AND
DO NOT SHOW EXACT PHYSICAL ARRANGEMENT OF EQUIPMENT.
WHERE INDICATED ON DRAWINGS, JUNCTION BOXES AND PULLBOXES
ARE MINIMUM REQUIREMENTS. PROVIDE FITTINGS AND PULLBOXES OF
ADEQUATE SIZE IN RACEWAY SYSTEMS WHEREVER NECESSARY OR
REQUIRED BY THE NEC OR LOCAL CODES. PROVIDE EXPANSION JOINT
FITTINGS FOR RACEWAY PASSING THROUGH NEW OR EXISTING
EXPANSION JOINTS INSTALLED BETWEEN BUILDINGS. VERIFY EXACT
LOCATIONS AND DETAILS OF EXPANSION JOINTS PRIOR TO WORK.
COORDINATE ALL RACEWAY ROUTING, PULLBOXES, AND EQUIPMENT
LOCATIONS WITH OTHER TRADES TO AVOID CONFLICTS OF EQUIPMENT
INSTALLATIONS.
8. RACEWAYS, CABLE SIZES AND ROUTES AS SHOWN REPRESENT INTENT
OF INSTALLATION, BUT MAY NOT NECESSARILY REPRESENT THE
COMPLETE WIRING COUNTS AND MINIMUM SIZES FOR CONNECTING
THE CIRCUITS SHOWN. CONTRACTOR SHALL INCLUDE IN THE BID, ALL
REQUIRED RACEWAY SIZES AND NUMBER OF CABLES IN ORDER TO
PROVIDE ALL CABLES AS SHOWN.
9. REFER TO SCHEDULES FOR CABLING REQUIREMENTS NOT INDICATED
ON PLANS.
10. INSTALLATION OF UNDERGROUND CABLING SYSTEMS SHALL INCLUDE
EXCAVATION, CUTTING, PATCHING, BACKFILL, AND COMPACTION. DO
NOT CUT OR DAMAGE ANY EXISTING UTILITIES, STRUCTURAL
MEMBERS, OR BUILDING FOUNDATIONS. VERIFY EXISTING CONDITIONS
PRIOR TO EXCAVATION WORK. INCLUDE COST FOR UNDERGROUND
LOCATOR SERVICE TO IDENTIFY LOCATIONS OF EXISTING
COMPONENTS. HAND EXCAVATE IN LOCATIONS WHERE EXISTING
UNDERGROUND COMPONENTS ARE SUBJECT TO DAMAGE. REPAIR
DAMAGE TO EXISTING UTILITIES OR BUILDING STRUCTURE TO
OWNER'S SATISFACTION AT THE CONTRACTORS EXPENSE.
11. PROVIDE PULL-ROPES IN ALL EMPTY CONDUITS.
12. CONDUIT OR OTHER ELECTRICAL COMPONENTS SHALL NOT BE
INSTALLED IN STRUCTURAL CONCRETE UNLESS SPECIFICALLY
INDICATED ON THE DRAWINGS OR APPROVED BY A STRUCTURAL
ENGINEER. ALL CORE DRILLING FOR RACEWAY INSTALLATION, SHALL
BE THE RESPONSIBILITY OF THE E.C.
13. COORDINATE PAINTING WORK OF ELECTRICAL ITEMS WITH GENERAL
CONTRACTOR. SEE PAINTING SPECIFICATIONS FOR REQUIREMENTS.
14. CONTRACTOR TO PROVIDE ADDITIONAL CABLE LENGTH, ADDED TO
FIELD MEASURED LENGTH, OF COPPER AND FIBER OPTIC CABLE FOR
ONE 10' SERVICE LOOP AT EACH END WITHIN EACH
TELECOMMUNICATIONS SPACE. IN ADDITION TO THE SERVICE LOOPS,
CONTRACTOR SHALL ALSO SUPPLY ADDITIONAL LENGTH FOR SITE
BACKBONE CABLING AS NOTED IN CABLING SCHEDULES SHOWN ON
THIS SHEET AND AS NOTED IN DRAWINGS SHEETS TNxxxx FOR FUTURE
RELOCATION OF CABLING TO NEW DATA CENTER LOCATION AND
SERVICE LOOP IN EACH VAULT OF AT LEAST 16'.
15. ALL NEW INTERIOR AND EXTERIOR EXPOSED CONDUIT, BOXES AND
SUPPORTS TO BE PAINTED TO MATCH EXISTING SURFACE.
GENERAL NOTES
P
S SECONDARY FIBER LOOP
PRIMARY FIBER LOOP
PRIMARY FIBER TAG. SEE NEW CAMPUS FIBER SCHEDULE
SECONDARY FIBER TAG. SEE NEW CAMPUS FIBER SCHEDULE
(N)MH-N#
FIBER ROUTING, SUPPORTED WITH J-HOOKS
FIBER ROUTING IN CONDUIT
J xxxP
NEW MANHOLE
xxxS
(E)MH-# EXISTING MANHOLE
FIBER BACKBONE SCHEDULES
COPPER VOICE BACKBONE SCHEDULES
E2
E2 E2
E2E2
E2
E2
E2
E2
E3 E3
E3
E3 E3
E3
E3
E3 E3 E3
E3
E3E3E3 E3
E3 E3
E3 E3 E3 E3
E3 E3
E4
E4 E4 E4 E4 E4 E4
E4
E4
E1 E1 E1 E1 E1 E1 E1 E1
E1 E1
E1 E1
E1
E1E1
E1 E1
E1
E1
E1
E1
E1
E1
E1
E1
E1 E1 E1 E1E1E1
E1 E1 E1
E1 E1
E1
E1
E1
E1 E1
EL
ELELELELELELELELELELELELELELEL
X X
X X
X X
X
X X
X X
X X
X
X
X
5kV 5kV 5kV 5kV 5kV 5kV 5kV 5kV
5kV
5kV
5kV
5kV
5kV
5kV
5kV
5kV
5kV
5kV
5kV
5kV
5kV
5kV 5kV 5kV
5kV 5kV
5kV 5kV
5kV 5kV 5kV 5kV 5kV 5kV
5kV 5kV 5kV 5kV 5kV
5kV
5kV 5kV
5kV 5kV
5kV 5kV
5kV
5kV 5kV
5kV
5kV
5kV
5kV
5kV
5kV
5kV
5kV 5kV
5kV 5kV
5kV 5kV
5kV 5kV
5kV
5kV
5kV
5kV
5kV
5kV
5kV
5kV
5kV
5kV
5kV
5kV
5kV
5kV 5kV
5kV 5kV
5kV 5kV 5kV 5kV 5kV 5kV 5kV 5kV 5kV 5kV
5kV 5kV
5kV 5kV
5kV
5kV
5kV
5kV
5kV
5kV 5kV 5kV 5kV 5kV
12kV 12kV
12kV 12kV
12kV 12kV
12kV
12kV 12kV kV kV kV
5kV 5kV
5kV
5kV
12kV
12kV
12kV
12kV12kV12kV12kV12kV12kV12kV12kV12kV12kV12kV12kV
12kV 12kV
12kV 12kV
12kV
12kV
12kV
12kV12kV12kV
12kV
12kV
12kV
5kV 5kV
5kV
5kV5kV
12kV 12kV
12kV 12kV
12kV
12kV
12kV 12kV
12kV 12kV
12kV 12kV
12kV
12kV 12kV
12kV 12kV
X X
XXXXXXXXXX
X X
X X
X X
X X
X X
X X
X X
X X
X X X X X
XX
X
X
X
EL EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
ELEL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL EL
EL
EL
ELELEL
EL
EL
EL
EL
ELEL
EL 12kV 12kV
12kV
12kV
XXXXXXXXXXXXXXXXXXX
X
X X
X
X X
X
X X
X
X
X
X X
X
X
X
X
X X
X
X
X X
X
X
X X
X
X
X X
X
X
X X
X
12kV
12kV
12kV
12kV
12kV
12kV
12kV
12kV
12kV
12kV
12kV 12kV
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL EL
EL
EL
EL
EL
EL
ELELELELELELELELELELELEL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
L
EL
ELEL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
ELEL
EL
EL
EL
EL 12kV
12kV
12kV
12kV
12kV
12kV12kV12kV12kV12kV12kV12kV12kV
5kV5kV
5kV 5kV
5kV 5kV
5kV 5kV
5kV 5kV
5kV 5kV 5kV 5kV 5kV
5kV 5kV
5kV
5kV 5kV
5kV
5kV
5kV
EL EL EL EL EL EL EL EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
12kV12kV kV
SS
12kV12kV
PPP
P
P
P
P P
P
P P P P
P P
P
P
P
P
P
P
P
P
P
PPP
P
P
P
PPP
P P P P
23+00 24+00
+0
+3
26+00 27+00 28+00 29+00 30+00
+0
+0
+7
+0
+0
+3
+0
33+65
34+00 34+67
36+00 37+00
38+00 39+00 39+62
11+70 11+00
0+00
1+00
2+00
3+
4+00 5+00
6+00 7+00 8+00 9+00 10+00
10+74
+0
+6
13+00
+5
+0
+0
+0
17+00
18+00
19+00
20+00
21+00
22+00 22+12
+0
+0
41+30
42+00 43+00
44+00
44+77 46+0046+33
45+00
45+30
CU0101
1"=80'-0"
40' 80' 160'
SCALE:
CIVIL - OVERALL A-CIRCUIT FIBER
OPTICS SITE PLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
RECORD DOCUMENTSOffice of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Hood River Engineers 1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128 Dave Clem
VA WALLA WALLA FIRE LIFE
SAFETY REPLACEMENT - PHASE A
WALLA WALLA, WA
687-18-101
Project Director
Revisions: Date:
FLS
06/05/23 DJC ANH
RECORD DOCUMENTS 05/01/23
RECORD DOCUMENTS
FINAL CONSTRUCTION DOCUMENTS 01/05/21
95% CONSTRUCTION DOCUMENTS 12/07/20
65% SUBMITTAL 10/23/20
FINAL DESIGN DEVELOPMENT 09/10/20
DRAFT DESIGN DEVELOPMENT 08/03/20
E2
E2
E2
E2
E2
E2
E2
E2
E2
E2 E2
E2
E2
E3 E3
E3 E3
E3 E3
E3 E3 E3
E3 E3
E3
E3
E3 E3
E3
E3
E3
E3
E3 E3
E3 E3
E3E3
E3 E3
E3E3E3E3E3 E3
E3
E3
E3
E3
E3
E3
E3 E3
E3 E3
E3 E3 E3 E3 E3 E3
E3 E3
E3 E3
E3 E3
E3
E3
E4
E4
E4
E4 E4 E4 E4 E4 E4 E4 E4 E4 E4 E4
E4 E4
E4 E4
E4
E4
E4
E4
E4
E1 E1
E1 E1
E1 E1
E1
E1
E1
E1
E1
E1
E1
E1
E1
E1
E1
E1
E1
E1
E1
E1
E1
E1 E1 E1 E1 E1 E1
E1E1E1E1E1E1
E1 E1 E1 E1 E1 E1 E1 E1
E1 E1
E1 E1
E1 E1
E1
E1
E1
E1
E1
E1
E1
E1
E1
E1
E1
E1
E1
E1
E1
E1
X
X X
X X
X
5kV 5kV
5kV
5kV
5kV
5kV
5kV
5kV
5kV
5kV
5kV
5kV
5kV
5kV
5kV
5kV
5kV
5kV
5kV
5kV
5kV
5kV
5kV
5kV
5kV
5kV
5kV 5kV 5kV 5kV 5kV 5kV 5kV
5kV 5kV
5kV 5kV
5kV 5kV
5kV 5kV
5kV
5kV 5kV 5kV 5kV 5kV 5kV 5kV 5kV 5kV 5kV 5kV 5kV
5kV 5kV
5kV
5kV 5kV
5kV 5kV
5kV 5kV
5kV 5kV
5kV 5kV
5kV
5kV
5kV
5kV
5kV
5kV
5kV
5kV
5kV
5kV
5kV
5kV
5kV
5kV
5kV 5kV
5kV 5kV
5kV
5kV
5kV
5kV
5kV
5kV
5kV
5kV
5kV
5kV
5kV
5kV
5kV
5kV 5kV
5kV 5kV
5kV 5kV
5kV 5kV
5k V
5kV 5kV
5kV
5kV
5kV
5kV
5kV
5kV
5kV
5kV 5kV 5kV 5kV
12kV 12kV
12kV
12kV
12kV
12kV
12kV 12kV12kV kV kV kV kV kV kV
5kV 5kV
5kV 5kV
5kV 5kV
5kV
5kV
5kV
12kV 12kV
12kV 12kV 12kV
12kV 12kV
12kV 12kV
12kV12kV12kV12kV12kV12kV12kV12kV12kV12kV12kV12kV12kV12kV12kV12kV12kV12kV12kV12kV
12kV 12kV kV
12kV
12kV
12kV12kV12kV12kV12kV 12kV
12kV
12kV
12kV 12kV
12kV
12kV
12kV
5kV 5kV
XXXXXXXXXXXXXXX
X
EL EL EL EL EL
EL
EL EL EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
ELELELELEL
ELEL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL EL EL EL
EL
EL
EL
EL
ELELELELELEL
X X X
X
X
X
X
XX
X X
X X
X
X
X
X
X
X
X
X
X
X
12kV
12kV
12kV
12kV
12kV 12kV
12kV
12kV
12kV
12kV
12kV
12kV
12kV
12kV
12kV
12kV 12kV12kV12kV
EL EL EL EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
L
ELELELEL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
L
EL
EL
EL
EL
EL
EL
EL
EL
ELELEL
EL
EL
EL
ELEL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
5kV5kV
EL EL EL EL EL EL EL EL EL EL EL EL EL EL EL EL
EL
EL
EL
EL EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
SS
PPPPPPP
P
P
P
P
P
P
P
P
P P
P P
P P
P
P
P P P P P P P P P
P P
P P
P P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
PPPPPP
P
P
P
P
P
P
P
P
P
P
P
P P
P
PPPPPPP
P P
P P
P P P P P P
P
23+00
24+00
+0
+3
26+00 27+00
28+00 29+00 30+00
+0
+0
+7
+0
+0
+3
+0
33+65
34+00
34+67
36+00
37+00
38+00 39+00
39+62
11+70
11+00
0+00
1+00
2+00
3+
4+00
5+00
6+00 7+00
8+00 9+00 10+00
10+74
+0
+6
13+00
+5
+0
+0
+0
17+00
18+00
19+00
20+00
21+00
22+0022+12
+0
+0
41+30
42+00
43+00
44+00
44+77
46+00 46+33
45+00
45+30
CU0102
1"=40'-0"
20 40 80
SCALE:
CIVIL - A-CIRCUIT FIBER OPTICS SITE
PLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
RECORD DOCUMENTSOffice of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Hood River Engineers 1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128 Dave Clem
VA WALLA WALLA FIRE LIFE
SAFETY REPLACEMENT - PHASE A
WALLA WALLA, WA
687-18-101
Project Director
Revisions: Date:
FLS
06/05/23 DJC ANH
RECORD DOCUMENTS 05/01/23
RECORD DOCUMENTS
FINAL CONSTRUCTION DOCUMENTS 01/05/21
95% CONSTRUCTION DOCUMENTS 12/07/20
65% SUBMITTAL 10/23/20
CU0103
CIVIL - A-CIRCUIT FIBER OPTICS
PROFILES
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
RECORD DOCUMENTSOffice of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Hood River Engineers 1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128 Dave Clem
VA WALLA WALLA FIRE LIFE
SAFETY REPLACEMENT - PHASE A
WALLA WALLA, WA
687-18-101
Project Director
Revisions: Date:
FLS
06/05/23 DJC ANH
RECORD DOCUMENTS 05/01/23
RECORD DOCUMENTS
FINAL CONSTRUCTION DOCUMENTS 01/05/21
95% CONSTRUCTION DOCUMENTS 12/07/20
65% SUBMITTAL 10/23/20
CU0104
CIVIL - PRIMARY FIBER OPTICS
PROFILES
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
RECORD DOCUMENTSOffice of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Hood River Engineers 1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128 Dave Clem
VA WALLA WALLA FIRE LIFE
SAFETY REPLACEMENT - PHASE A
WALLA WALLA, WA
687-18-101
Project Director
Revisions: Date:
FLS
06/05/23 DJC ANH
RECORD DOCUMENTS 05/01/23
RECORD DOCUMENTS
FINAL CONSTRUCTION DOCUMENTS 01/05/21
95% CONSTRUCTION DOCUMENTS 12/07/20
65% SUBMITTAL 10/23/20
CU0105
PROFILES
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
RECORD DOCUMENTSOffice of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Hood River Engineers 1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128 Dave Clem
VA WALLA WALLA FIRE LIFE
SAFETY REPLACEMENT - PHASE A
WALLA WALLA, WA
687-18-101
Project Director
Revisions: Date:
FLS
06/05/23 DJC ANH
RECORD DOCUMENTS 05/01/23
RECORD DOCUMENTS
FINAL CONSTRUCTION DOCUMENTS 01/05/21
95% CONSTRUCTION DOCUMENTS 12/07/20
65% SUBMITTAL 10/23/20
CU0106
PROFILES
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
RECORD DOCUMENTSOffice of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Hood River Engineers 1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128 Dave Clem
VA WALLA WALLA FIRE LIFE
SAFETY REPLACEMENT - PHASE A
WALLA WALLA, WA
687-18-101
Project Director
Revisions: Date:
FLS
06/05/23 DJC ANH
RECORD DOCUMENTS 05/01/23
RECORD DOCUMENTS
FINAL CONSTRUCTION DOCUMENTS 01/05/21
95% CONSTRUCTION DOCUMENTS 12/07/20
65% SUBMITTAL 10/23/20
T1
T1
T1
T1 T1
X X
X X
X X
X
X X
X X
X X
X
X
X X
X
XXXXXXXXXX
X X
X X
X X
X X
X X
X X
X X
X X
XX
X
X
X
X
X X
X
X
X
X X
X
X
X X
X
X X
X X
X
X X
X
X
X
X
X X
X
X
X X
X
X
X X
X
X
X X
X
X
X X
X
SS
S
S
S
S
S S S
S
S
S S
S
S S
S S
S
S
SSSSS
S
SSSS
S
S
S
S
S
S
S
S S
S S
S
S
S
S S
S
SS
SSS
S
S
SS
SSSSS
S
SSSS
0+00 1+00
2+
3+00 4+00
5+00
6+
7+007+59
8+00 9+0010+0010
+4
10+00
11+00 12+ 0012+
14+00
+0
16+00 17+00
18+00 19+00
+0
+4
+0
+1
22+00 23+00 24+00
+0
+0
+0
+0
29+00
+0
+7
31+00 32+00 33+00 33+
+0
+0
36+00
37+00
38+00
39+00
+0 0 41+0041+21
+0
+5
43+00
43+54
+0
44+99
45+00
+0
+0
48+0049+0050+0051+00
+0
+0
+0
55+0056+0057+0058+00
59+0059+08
60+
60+86
+0
+3
+0
63+00
64+0065+0066+0067+00
+0
+4
+0
+7
+0
70+88
+0
+7
72+
72+94
+0
+7
0+00 0+25
CU0600
CIVIL - OVERALL B-CIRCUIT FIBER
OPTICS SITE PLAN
1"=80'-0"
40' 80' 160'
SCALE:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
RECORD DOCUMENTSOffice of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Hood River Engineers 1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128 Dave Clem
VA WALLA WALLA FIRE LIFE
SAFETY REPLACEMENT - PHASE A
WALLA WALLA, WA
687-18-101
Project Director
Revisions: Date:
FLS
06/05/23 DJC ANH
RECORD DOCUMENTS 05/01/23
RECORD DOCUMENTS
FINAL CONSTRUCTION DOCUMENTS 01/05/21
95% CONSTRUCTION DOCUMENTS 12/07/20
65% SUBMITTAL 10/23/20
X
X X
X X
X
X
X X
X X
X
XXXXXXXXXXXXXXXXXX
X X
X
X
X X
X
X
X X X
X X
X
X
X
X
X X
X X
X
X
XXX
X X
X
X
X
X X
X X
X
X
X
X
XX
X X
X X
X
X X
X X
X X
X
X
X
X
X
SS SS SS
S S
S S
S
S S
SSS
S
S
S S S
S S
S S
S S
S S
S
S S S
S
SSSSSSSSSS
S S
S
S
S
S
S
S
S S S
S S
S S
S S
S
S
SSSSSSSS
0+00 1+00
2+
3+00
4+00
5+00
6+
7+007+59
8+00
9+00 10+00
+4
10+00
11+00
12+
+14
14+00
+0
16+00
17+00
18+00 19+00
+0
+4
+0 1+
22+00
23+00
24+00
+0
+0
45+00
0+00 0+25
CU0601
CIVIL - B-CIRCUIT FIBER OPTICS SITE
PLAN
1"=40'-0"
20 40 80
SCALE:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
RECORD DOCUMENTSOffice of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Hood River Engineers 1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128 Dave Clem
VA WALLA WALLA FIRE LIFE
SAFETY REPLACEMENT - PHASE A
WALLA WALLA, WA
687-18-101
Project Director
Revisions: Date:
FLS
06/05/23 DJC ANH
RECORD DOCUMENTS 05/01/23
RECORD DOCUMENTS
FINAL CONSTRUCTION DOCUMENTS 01/05/21
95% CONSTRUCTION DOCUMENTS 12/07/20
65% SUBMITTAL 10/23/20
X
WM
S S
S
S
S
S
S
S
S S
S
S S S S S S
S
SSSSSSSSSS
S
S
S
S
S
S
S
S
S
S S
S S S
S
S
S
S
S S
S S
S S
S S
S
S S
S S
S
S
S
S
S
S
S S
SSSSSS S S
S
S
S S
S
S S
S S
S
S S
S
SSSSSSSSSSS
S S
S
+ 2
+0
+0
29+00
+0
+7
31+00 32+00 33+00 33+
+0
+0
36+00
37+00
38+00
39+00
+0
41+00 41+21
+0
+5
43+00
43+54
+0
44+99
45+00
+0
+0
48+0049+0050+0051+00
+0
+0
+0
55+0056+0057+0058+00
59+0059+08
60+
60+86
+0
+3
+0
63+00
64+0065+0066+0067+00
+0
+4
+0
+7
+0
70+88
+0
+7
72+
72+94
+0
+7
CU0602
CIVIL - B-CIRCUIT FIBER OPTICS SITE
PLAN
1"=40'-0"
20 40 80
SCALE:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
RECORD DOCUMENTSOffice of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Hood River Engineers 1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128 Dave Clem
VA WALLA WALLA FIRE LIFE
SAFETY REPLACEMENT - PHASE A
WALLA WALLA, WA
687-18-101
Project Director
Revisions: Date:
FLS
06/05/23 DJC ANH
RECORD DOCUMENTS 05/01/23
RECORD DOCUMENTS
FINAL CONSTRUCTION DOCUMENTS 01/05/21
95% CONSTRUCTION DOCUMENTS 12/07/20
65% SUBMITTAL 10/23/20
CU0605
CIVIL - B-CIRCUIT FIBER OPTICS PLAN
AND PROFILE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
RECORD DOCUMENTSOffice of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Hood River Engineers 1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128 Dave Clem
VA WALLA WALLA FIRE LIFE
SAFETY REPLACEMENT - PHASE A
WALLA WALLA, WA
687-18-101
Project Director
Revisions: Date:
FLS
06/05/23 DJC ANH
RECORD DOCUMENTS 05/01/23
RECORD DOCUMENTS
FINAL CONSTRUCTION DOCUMENTS 01/05/21
95% CONSTRUCTION DOCUMENTS 12/07/20
65% SUBMITTAL 10/23/20
T1
T1
T1
T1
T1
T1
T1
T1
T1
T1
T1
T1 T1
T1 T1
T1
X
X
X X X
X X X
X X X
X X X
X X
X X
X X
X X
X X
X X
X X
X X
X X X
X X
X X
X X
X X
X X
X X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
XX
X
X X
X
X X
X X
X X
X X
X X
X X
XXXXXXXXXXXXXXXXXXXX
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X X X X X X X X X
X X
X
X
X X
X
X
X
X
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX X X X X X X X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X
X X
X
X X X
X X
X
X
X
X
X
X X
X X
X X
X
X
X
XXX
X X
X
X
X
X
X
X X
X X
X X
X
X
X
X X X X
X X
X
X
X
X
X
XX
X X
X X
X
X
X
X X
X X
X
X
X
X
X
X
X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X
X
X
X
X
STATE NURSING HOME
STATE NURSING HOME
STATE NURSING HOME
STATE NURSING HOME
N U
R S
IN
G
H O
M E
FU
TU
R E
B
LD
G
SS SS SS
WM
7 49 48
66T-7
77T-1
T-2
756968
116119
121126125124
109CM
147 146
WATER TOWER
P P
P P
PPPP
P
P
P
P
P
P
P P
P P
P P
P
P
P
PPP
P P P P P
P P P P P P P
P P P P P P P P P
P P
P P
P P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
PPPPPP
P
P
P
P
P
P
SS
S
S
S
S
S S
S S S S S
P P P
P
S
S
S S
S
S
S
SS
P
S S
S S
S
S S
S S
S
S
S
SSSSSSSSSS
S S
S S
S S
S
SS
S S
P P
S
S
S
S
S
S S
S S S
S
S S
P P P P P P P P P P P P P P P P P P P P P P P P
P
P P
P P
S S S
P
S S
S S S
S S
P
P P
P P
P P
P P
P
P P
P
P P
P
P P P P P P
P
P
P P
P P
P P
P P
P P
S S
S S
S
P
PP
P
P
P
P
P
P P
S
S
P P P P P P
P P
S S
S
S S
S S
S S
S S
S S
S S S S S S S S S S
S S
S S
S S
S S
S S
S
S
S S S S S S S S S
SS
SS
S
S
S
S S S S
S S
S
S
S
S S
S
S
P P P P P
P
P
P
P
P
P
PPPPPPP
P P
SS
S S
S
ES0000
TELECOMMUNICATION OVERALL
SITE PLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
RECORDS DOCUMENTOffice of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Hood River Engineers 1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128 Dave Clem
VA WALLA WALLA FIRE LIFE
SAFETY REPLACEMENT - PHASE A
WALLA WALLA, WA
687-18-101
Project Director
Revisions: Date:
FLS
06/05/23 DJC ANH
DRAFT DESIGN DEVELOPMENT 08/03/20
RECORDS DOCUMENT
FINAL DESIGN DEVELOPMENT 09/10/20
65% SUBMITTAL 10/23/20
95% CONSTRUCTION DOCUMENTS 12/07/20
FINAL CONSTRUCTION DOCUMENTS 01/05/21
RECORDS DOCUMENT 06/05/23
1"=80'-0"
40' 80' 160'
SCALE:
TELECOMMUNICATION OVERALL SITE PLAN
X X
X X
X X
X
X
XX
X X
X X
X X
X X
X X
X X
XXXXXXXXXXXXXXXXXX
X X
X
X
X X
X
X
X
X X
X X
X
X
X
XXX
X X
X
X
X
X
X
X X X
X X
X X
X
X
X
X X
X X
X
X
SS SS SS 66T-7
109CM
P P
P
P(E)TMH
(E)TMH
(E)TMH
(E)TMH
(E)TMH
(E)TMH
(E)TMH
PPPPPP
P
P
P
P
P
P
P P P P P P
P P
P P
P
P P P P P P P P P
P P
P P
P P
P
P
P
P
P
P
P
P
P
(N)TMH
PPPPPP
P
P
P
(N)TMH
(N)TMH
P P P
P
S
S
S S
S
S S
S S
(N)TMH
P
S S
S S
S
(N)TMH
S S
S S
S S
S
(N)TMH
(N)TMH
S
SSSSSSSSSS
S S
(1) 4"C
(2) 4"C.O. - SPARE
69P
(1) 4"C 80P
(1) 4"C 81P
68P 69P 80P
81P
(1) 4"C 66P
68P 69P 80P 81P 66P(1) 4"C
T7P
(1) 4"C
(1) 4" C.O. - SPARE
78P T1P T2P 77P
(1) 4"C 75P
75P
(1) 4"C
(1) 4" C.O. - SPARE
78P T1P T2P 77P
75P
(1) 4"C
(1) 4" C.O. - SPARE
78P
T1P T2P 77P75P
(1) 4"C 65P
(1) 4"C 63P
63P 65P
(1) 4"C 76P
(1) 4"C 135P
(1) 4"C 82P
76P 82P 135P
(2) 4"C
78P T1P T2P
77P75P 63P65P
76P 82P 135P
(2) 4"C
78P T1P T2P
77P75P 63P 65P
76P 82P 135P
(2) 4"C
(1) 4" C.O. - SPARE
78P
T1P T2P
77P75P
63P 65P 68P 69P
80P 81P
66P T7P
(1)4"C - FIBER
(1)2"C - COPPER
135S
(1)4"C - FIBER
(1)2"C - COPPER
82S 82S
(1)4"C - FIBER
(1)4"C - COPPER
135S 82S
65S
63S
(1)4"C - FIBER
(1)4"C - COPPER
65S 63S
(1)4"C - FIBER
(1)2"C - COPPER
80S
(1)4"C - FIBER
(1)2"C - COPPER
81S
76S
T7S
145S
145S T7S SS
P P
76S135S 82S
(1) 4"C T1P T2P
145ST7S 66S
(1) 4"C
68P
P P
(N)TMH
145TT7T 66T
(1) 4"C - FIBER
(1)2" C - COPPER
(1) 4"C - FIBER
(1)2" C - COPPER
66S 66T
145T T7T
(1) 4"C - FIBER
(1) 4" C - COPPER
145T
(1) 4"C - FIBER
(1)2" C - COPPER
(1) 4"C - FIBER
(1)2" C - COPPER
T7T
80T
81T
135T
(1)4"C - FIBER
(1)4"C - COPPER
135S 135T
(1)4"C - FIBER
(1)4"C - COPPER
82T82T
135T 82T
(1)4"C - FIBER
(1)2"C - COPPER
76T
(1)4"C - FIBER
(1)2"C - COPPER
63T
(1)4"C - FIBER
(1)2"C - COPPER
65T
65T 63T76T135T 82T
S S S
(N)TMH
P
(1) 4"C 69P
(2) 4"C.0 - SPARE
(1) 4"C
(1) 4" C.O. - SPARE
(1) 4"C
(1) 4" C.O. - SPARE
CRNP
CRNP
CRNP
CRNP
CRNP
CRNP
PPPPPPP
P P
(N)TMH
P P
P P
P P P P P P
P
P
P
S S
S S
135S82S 65S63S 80S
81S 76S
135T82T 65T63T 80T
81T 76T
(1)4"C - FIBER
(1)4" C - COPPER
(2) 4"C.0 - SPARE
P
PP
P
P
P
P
P
P P
S S
S
S
P P P P P P
P P
S
S
S S S S
S
S
T1 T1
T1
T1
T1
T1
T1
T1
T1
T1
T1
T1
T1
T1 T1
T1 T1
T1
X
X
X X
X X X X X
X X X X X
X X
X X
X X
X X
X X
X X
X X
X X
X X X
X X
X X
X X
X X
X X
X X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
XXX
X
XX
X X
X X
X X
X X
X X
X X
XXXXXXXXXXXXXXXXXXXX
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X X X X X X X X X
X X
X
X
X X
X
X
X
X
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
X X X
X X
X
X
X
X
X
X X
X X
X X
X
X
X
XXX
X X
X
X
X
X
X
X X
X X
X X
X
X
X
X X X X
X X
X
X
X
X
X
XX
X X
X X
X
X
X
X X
X X
X X
X
X
X
X
X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X
X
X
X
X
STATE NURSING HOME
STATE NURSING HOME
STATE NURSING HOME
STATE NURSING HOME
N U
R S
IN
G
H O
M E
FU
TU
R E
B
LD
G
SS SS SS
WM
7 49 48
66T-7
77T-1
T-2
756968
116119
121126125124
109CM
147 146
ES0001
ES0002 ES0003
ES0001
TELECOMMUNICATION PARTIAL SITE
PLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
RECORDS DOCUMENTOffice of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Hood River Engineers 1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128 Dave Clem
VA WALLA WALLA FIRE LIFE
SAFETY REPLACEMENT - PHASE A
WALLA WALLA, WA
687-18-101
Project Director
Revisions: Date:
FLS
06/05/23 DJC ANH
DRAFT DESIGN DEVELOPMENT 08/03/20
RECORDS DOCUMENT
FINAL DESIGN DEVELOPMENT 09/10/20
65% SUBMITTAL 10/23/20
95% CONSTRUCTION DOCUMENTS 12/07/20
FINAL CONSTRUCTION DOCUMENTS 01/05/21
RECORDS DOCUMENT 06/05/23
KEY PLAN
SCALE:
TELECOMMUNICATION PARTIAL SITE PLAN
1"=40'-0"
40' 80'
GENERAL NOTES
1. REFER TO NEW CAMPUS FIBER LOOP SCHEDULES FOR MORE
INFORMATION.
2. ALL FIBER CABLING ROUTED IN 3-CELL MAXCELL INNERDUCT.
3. THERE SHALL BE (3)3 INCH 3-CELL MAXCELL INNERDUCT PER
4" CONDUIT (TOTAL OF 9 PATHWAYS PER 4" CONDUIT).
4. ALL FIBER OPTIC CABLES RAN IN BUILDING FROM MDF TO IDF
TO BE FACTORY TERMINATED WITH MPO CONNECTORS. ALL
BUILDING TO BUILDING FIBER OPTIC CABLES ARE TO BE FIELD
TERMINATED WITH MPO CONNECTORS. ALL LENGTHS LISTED
IN MATRIX, SHOWN ON TG0001, ARE APPROXIMATE. IT IS THE
CONTRACTORS SOLE RESPONSIBILITY TO VERIFY REQUIRED
LENGTHS PRIOR TO PURCHASE OF FACTORY TERMINATED
CABLES. CONTRACTOR SHALL PROVIDE 10' OF ADDITIONAL
LENGTH AT EACH END AND 16' WITHIN EACH VAULT FOR
SERVICE LOOPS AS WELL AS ANY ADDITIONAL LENGTH AS
NOTED IN TNxxxx DRAWINGS.
5. DEMOLITION OF ALL EXISTING CABLES TO BE PERFORMED
ONLY AFTER NEW CABLING IS INSTALLED, TERMINATED AND
VA HAS CUT SYSTEMS OVER TO NEW INFRASTRUCTURE.
COORDINATE WITH VA COR AND A/E TEAM.
6. CONTRACTOR TO CONSISTENTLY CHECK SPOILS OF
EXCAVATION FOR CULTURAL ARTIFACTS. IN THE CASE OF
FINDING CULTURAL ARTIFACTS CONTRACTOR TO CEASE
EXCAVATION AT THE LOCATION AND IMMEDIATELY ALERT COR.
7. CONTRACTOR SHALL MAKE ALL NEW CONDUITS AND
MANHOLES WATER TIGHT.
8. CONTRACTOR SHALL MAKE ALL PENETRATIONS INTO EXISTING
MANHOLES WATER TIGHT. THIS IS TO INCLUDE EXISTING
CONDUIT PENETRATIONS.
9. NEW CONDUIT PATHWAYS AS DEPICTED ARE INTENDED TO BE
DIAGRAMMATIC. THE PATHWAYS AS SHOWN INDICATE
CONNECTIONS BETWEEN BUILDINGS AND/OR STRUCTURES.
ACTUAL FIELD INSTALLATION SHALL AVOID ALL AREAS WITHIN
TREE DRIP LINES AND ANY DEVIATION FROM STRAIGHT
CONDUIT RUNS MUST UTILIZE ELBOWS WITH RADIUS AS
ALLOWED BY SPECIFICATIONS.
10. ALL NEW CONDUIT SHALL BE LABELED AT BOTH ENDS.
11. PROVIDE TYPE 504-LA, WITH DRIVE OVER COVER, FOR ALL
NEW MAN HOLES.
12. SEE FIBER AND COPPER SCHEDULES AND GENERAL NOTES
ON SHEET TG0001.
13. ALL NEW CONDUIT DUCT BANK TO BE ENCASED IN 3000 PSI
CONCRETE DYED ORANGE.
PLAN NOTES
1 PROVIDE NEW MANHOLE, TYPE 504-LA, WITH DRIVE OVER COVER.
PROVIDE NEW CONDUIT(S) ON TOP OF OR ADJACENT TO EXISTING
DUCTBANK. PROVIDE NEW CONDUIT SPACERS AND NEW CONDUIT,
CONCRETE ENCASE, BACKFILL, COMPACT, AND RESTORE EXISTING
SURFACE OF NEW TRENCH AS REQUIRED.
EXISTING MANHOLE TO REMAIN. PROVIDE CORE-DRILLING TO
CONNECT NEW CONDUITS TO EXISTING MANHOLE.
PROVIDE NEW CONDUIT DUCTBANK.
3 3
X X X X X X X X X X XXXXXXXXXXXXXXXXXXXXXX
SS SS SS
WM
7 49 48
66T-7
756968
35 4
121126125124
147 146
49P
(E)TMH
(E)TMH
(E)TMH (E)TMH
(E)TMH (E)TMH
(E)TMH
(E)TMH (E)TMH
(E)TMH
P P
P P
P P
P
P
PPP
P P P P P
P P P P P P P
P
P
P
S S
S
S S S S S
P
P
P
(N)TMH
(N)TMH
(N)TMH
SS
S
S
S
S
S S
S S S S
S S S
(N)TMH
(N)TMH
S
SSSSSSSSSS
S S
S S
S S
S
SS
S S
(N)TMH
(N)TMH
(N)TMH
(1) 4"C 49P
(1) 4"C
48P
(1) 4"C 49P48P
86P
(1) 4"C 49P48P 86P
(1) 4"C 140P
(1) 4"C 49P48P
86P 140P
(1) 4"C 145P
145P
143S
(1) 4"C
(2) 4"C.O. - SPARE
69P
(1) 4"C
(1) 4" C.O. - SPARE
78P T1P T2P 77P
75P
76P 82P 135P
(2) 4"C
(1) 4" C.O. - SPARE
78P
T1P T2P
77P75P
63P 65P 68P 69P
80P 81P
66P T7P
76P 82P 135P
(3) 4"C
78P
T1P T2P
77P 75P63P 65P 68P 69P
80P 81P 66P
T7P 49P48P
86P 140P 145P143P
140S
(1)4"C - FIBER
(1)2" C - COPPER
49S
(1) 4"C - FIBER
(1)2" C - COPPER
48S
143P
(1)4"C - FIBER
(1)2" C - COPPER
140S
49S
(N)TMH
140S48S
68S
T2ST1S 77S
T2ST1S77S
75S
78S
78S75S
69S
(1)4"C - FIBER
(1)2"C - COPPER
80S
135S82S 65S63S
80S 81S76S
69ST2ST1S
77S 78S 75S
T7S
145S
145S T7S
145ST7S
SS
66S
SS
P P P P P P P P P P P P P P P P P P P
1S
1S
1S
(1) 4"C 1P
(1) 4"C 1P
(1) 4"C 1P1P
1P
1P
1P
1P
(3)4"C - COPPER
T2S
77S
(1)4"C - FIBER
(1)2"C - COPPER
1S
(1) 4"C 1P
(1) 4"C 75P
P P
(1) 4"C 48P
(1) 4"C 68P
P P
48T
49T
49T 140T48T
(1) 4"C - FIBER
(1)2" C - COPPER
140T
(1) 4"C - FIBER
(1)2" C - COPPER
140T
49S 140S48S
49T 140T48T
86S86T
(1)4"C - FIBER
(1)2" C - COPPER
76T 82T 135T
78T
T1T T2T
77T75T 63T 65T 68T
69T 80T 81T
66T T7T
49T 48T
86T 140T 145T143T
1T
68T
(1)4"C - FIBER
(1)2" C - COPPER
145TT7T 66T
(1) 4"C - FIBER
(1) 4" C - COPPER
(1) 4"C - FIBER
(1)2" C - COPPER
66S 66T
145T T7T
(1) 4"C - FIBER
(1) 4" C - COPPER
145T
(1) 4"C - FIBER
(1)2" C - COPPER
(1) 4"C - FIBER
(1)2" C - COPPER
T7T
135T82T 65T63T
80T 81T76T
69TT2TT1T
77T 78T 75T1T
(2)4"C - FIBER
(2)4" C - COPPER
(2)4" C.O. - SPARE
69T
(1)4"C - FIBER
(1)2" C - COPPER
T2TT1T77T 78T75T 1T
(1)4"C - FIBER
(1)4" C - COPPER
(2)4" C.O. - SPARE
75T
(1)4"C - FIBER
(1)2" C - COPPER
78T
(1)4"C - FIBER
(1)2" C - COPPER
T2TT1T 77T1T
(1)4"C - FIBER
(1)4" C - COPPER
80T
1T
77T
(1)4"C - FIBER
(1)2"C - COPPER
T2T
(1)4"C - FIBER
(1)2"C - COPPER
S S S
P
76S 82S 135S
78S
T1S T2S
77S 75S63S 65S 68S 69S
80S 81S 66S
T7S 49S48S
86S 140S 145S143S
1S
S
S S S
(2)4"C - COPPER
2 2 2 2
(E)TMH
3 3
2 (N)TMH
(N)TMH
(1) 4"C 69P
(2) 4"C.0 - SPARE
(3) 4"C.0. - SPARE
(3)4" C.O. - SPARE(3)4" C.O. - SPARE
(3)4" C.O.
- SPARE
S S
143T
(1) 4"C - FIBER
(1)2" C - COPPER
76T 82T 135T
78T
T1T T2T
77T75T 63T 65T 68T
69T 80T 81T
66T T7T
49T 48T
140T 145T
1T
(1)4"C - FIBER
(2)4"C - COPPER
86S 143S
143P
143P
CRNP
CRNP
P P
P
P P
P P
P P
P
P P
PPPPPPP
P P
(N)TMH
P P
P P
P P P P P P
P
P
P P
P P
P P
P P
P P
(1) 4"C 49P 48P
86P140P 1P
143P
S S
S S
135S82S 65S63S 80S
81S 76S
S
(1)4"C - FIBER
(1)2" C - COPPER
135T82T 65T63T 80T
81T 76T
(1)4"C - FIBER
(1)4" C - COPPER
(2) 4"C.0 - SPARE
S S
S
S
P P
S S
S
S S
S S
S S
S S
S S
S S S S S S S S S S
S S
S S
S S
S S
S S
S
S
S S S S S S S S S
SS
SS
S
(N)TMH
S S
S
T1 T1
T1
T1
T1
T1
T1
T1
T1 T1
T1
T1
T1
T1 T1
T1 T1
T1
X
X
X X X
X X X X
X X X X X
X X
X X
X X
X X
X X
X X
X X
X X X
X X
X X
X X
X X
X X
X X
X X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
XX
XX
XX
X X
X X
X X
X X
X X
X X
XXXXXXXXXXXXXXXXXXXX
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X X X X X X X X X
X X
X
X
X X
X
X
X
X
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX X X X X X X
X X X
X X
X
X
X
X
X
X X
X X
X X
X
X
X
XXX
X X
X
X
X
X
X
X X
X X
X X
X
X
X
X X X X
X X
X
X
X
X
X
XX
X X
X X
X
X
X
X X
X X
X X
X
X
X
X
X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X
X
X
X
X
STATE NURSING HOME
STATE NURSING HOME
STATE NURSING HOME
STATE NURSING HOME
N U
R S
IN
G
H O
M E
FU
TU
R E
B
LD
G
SS SS SS
WM
7 49 48
66T-7
77T-1
T-2
756968
116119
121126125124
109CM
147 146
WATER TOWER
ES0001
ES0002 ES0003
ES0002
TELECOMMUNICATION PARTIAL SITE
PLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
RECORDS DOCUMENTOffice of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Hood River Engineers 1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128 Dave Clem
VA WALLA WALLA FIRE LIFE
SAFETY REPLACEMENT - PHASE A
WALLA WALLA, WA
687-18-101
Project Director
Revisions: Date:
FLS
06/05/23 DJC ANH
DRAFT DESIGN DEVELOPMENT 08/03/20
RECORDS DOCUMENT
FINAL DESIGN DEVELOPMENT 09/10/20
65% SUBMITTAL 10/23/20
95% CONSTRUCTION DOCUMENTS 12/07/20
FINAL CONSTRUCTION DOCUMENTS 01/05/21
RECORDS DOCUMENT 06/05/23
KEY PLAN
GENERAL NOTES
1. REFER TO NEW CAMPUS FIBER LOOP SCHEDULES FOR MORE
INFORMATION.
2. ALL FIBER CABLING ROUTED IN 3-CELL MAXCELL INNERDUCT.
3. THERE SHALL BE (3)3 INCH 3-CELL MAXCELL INNERDUCT PER
4" CONDUIT (TOTAL OF 9 PATHWAYS PER 4" CONDUIT).
4. ALL FIBER OPTIC CABLES RAN IN BUILDING FROM MDF TO IDF
TO BE FACTORY TERMINATED WITH MPO CONNECTORS. ALL
BUILDING TO BUILDING FIBER OPTIC CABLES ARE TO BE FIELD
TERMINATED WITH MPO CONNECTORS. ALL LENGTHS LISTED
IN MATRIX, SHOWN ON TG0001, ARE APPROXIMATE. IT IS THE
CONTRACTORS SOLE RESPONSIBILITY TO VERIFY REQUIRED
LENGTHS PRIOR TO PURCHASE OF FACTORY TERMINATED
CABLES. CONTRACTOR SHALL PROVIDE 10' OF ADDITIONAL
LENGTH AT EACH END AND 16' WITHIN EACH VAULT FOR
SERVICE LOOPS AS WELL AS ANY ADDITIONAL LENGTH AS
NOTED IN TNxxxx DRAWINGS.
5. DEMOLITION OF ALL EXISTING CABLES TO BE PERFORMED
ONLY AFTER NEW CABLING IS INSTALLED, TERMINATED AND
VA HAS CUT SYSTEMS OVER TO NEW INFRASTRUCTURE.
COORDINATE WITH VA COR AND A/E TEAM.
6. CONTRACTOR TO CONSISTENTLY CHECK SPOILS OF
EXCAVATION FOR CULTURAL ARTIFACTS. IN THE CASE OF
FINDING CULTURAL ARTIFACTS CONTRACTOR TO CEASE
EXCAVATION AT THE LOCATION AND IMMEDIATELY ALERT COR.
7. CONTRACTOR SHALL MAKE ALL NEW CONDUITS AND
MANHOLES WATER TIGHT.
8. CONTRACTOR SHALL MAKE ALL PENETRATIONS INTO EXISTING
MANHOLES WATER TIGHT. THIS IS TO INCLUDE EXISTING
CONDUIT PENETRATIONS.
9. NEW CONDUIT PATHWAYS AS DEPICTED ARE INTENDED TO BE
DIAGRAMMATIC. THE PATHWAYS AS SHOWN INDICATE
CONNECTIONS BETWEEN BUILDINGS AND/OR STRUCTURES.
ACTUAL FIELD INSTALLATION SHALL AVOID ALL AREAS WITHIN
TREE DRIP LINES AND ANY DEVIATION FROM STRAIGHT
CONDUIT RUNS MUST UTILIZE ELBOWS WITH RADIUS AS
ALLOWED BY SPECIFICATIONS.
10. ALL NEW CONDUIT SHALL BE LABELED AT BOTH ENDS.
11. PROVIDE TYPE 504-LA, WITH DRIVE OVER COVER, FOR ALL
NEW MAN HOLES.
12. SEE FIBER AND COPPER SCHEDULES AND GENERAL NOTES
ON SHEET TG0001.
13. ALL NEW CONDUIT DUCT BANK TO BE ENCASED IN 3000 PSI
CONCRETE DYED ORANGE.
SCALE:
TELECOMMUNICATION PARTIAL SITE PLAN
1"=40'-0"
40' 80'
PLAN NOTES
1 PROVIDE NEW MANHOLE, TYPE 504-LA, WITH DRIVE OVER COVER.