This document includes a pre-solicitation notice from the Department of Veterans Affairs Technology Acquisition Center Austin seeking standard form SF 330 qualification packages from architecture and engineering firms for the C1DA--608-22-700 EHRM Infrastructure Upgrades Design project located at the VA Manchester Medical Center in Manchester, New Hampshire.
The project requires design services for complete construction documents including working drawings, specifications, reports and construction period services. The design must be bid-ready within 420 calendar days of notice of award. The project budget is between $20-50 million. Responses are due by July 29, 2022. Firms will be evaluated based on their specialized experience in healthcare infrastructure projects, professional qualifications of staff, capacity to complete the project on schedule, and past performance on government contracts. The selected firm will be invited to participate in discussions and complete a site visit during negotiations. The project has a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VHA Required Division 01 – General Requirement Specification Sections
* Note that these have been identified as required Division 01 specifications for this EHRM project. It is the responsibility of the A-E to determine if there are other specifications to include.
01 00 00 – General Requirements 01 32 16.01 - Architectural and Engineering CPM Schedules 01 32 16.15 – Project Schedules (Small Projects – Design/Bid/Build) 01 33 23 - Shop Drawings, Product Data, and Samples 01 35 26 – Safety Requirements 01 42 19 – Reference Standards 01 45 00 - Quality Control 01 45 29 – Testing Laboratory Services 01 57 19 - Temporary Environmental Controls 01 74 19 – Construction Waste Management 01 81 13 – Sustainable Construction Requirements 01 91 00 - General Commissioning Requirements