About this file

This pre-solicitation notice seeks Standard Form 330 qualification packages from firms interested in providing architect-engineer services for the Department of Veterans Affairs' EHRM Infrastructure Upgrades project located at the St. Louis VA Medical Center. Firms must have experience in network infrastructure installation, renovations, or upgrades including fiber optics, data cable, electrical upgrades, UPS, bonding, BMS, HVAC, IT room renovations/relocations, data centers/server rooms, and physical security upgrades. The 100% service-disabled veteran-owned small business set-aside contract will have a period of performance of 184 calendar days for design services with construction period services to be exercised as option items. A two-phase selection process will evaluate SF330s submitted by 3 May 2021 followed by written responses from shortlisted firms. The estimated $18 million project involves electrical, communication, and security infrastructure improvements across multiple campus buildings to support a new electronic health record system.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VHA Required Division 01 – General Requirement Specification Sections

* Note that these have been identified as required Division 01 specifications for this EHRM project. It is the responsibility of the A-E to determine if there are other specifications to include.

01 00 00 – General Requirements 01 32 16.01 - Architectural and Engineering CPM Schedules 01 32 16.15 – Project Schedules (Small Projects – Design/Bid/Build) 01 33 23 - Shop Drawings, Product Data, and Samples 01 35 26 – Safety Requirements 01 42 19 – Reference Standards 01 45 00 - Quality Control 01 45 29 – Testing Laboratory Services 01 57 19 - Temporary Environmental Controls 01 74 19 – Construction Waste Management 01 81 13 – Sustainable Construction Requirements 01 91 00 - General Commissioning Requirements