SOW-ASR-11 Contract SOW.docx

DOCX document 19 KB Posted

Attached to
ASR-11 Ladder Kits
Solicitation number
6973GH-25-R-000172
Issued by

About this file

This Statement of Work (SOW) details the Federal Aviation Administration's (FAA) requirement for 25 ladder kits to upgrade fall protection systems on Airport Surveillance Radars (ASR-11 and ASR-8/9). The kits must include a newly manufactured aluminum ladder, MSA Dyna-glide Notched Rail, MSA Gated End Stop Assemblies, ladder side rail connectors, HSS tubes, and DBI-SALA Anchor Point D-Rings, all with a clear anodic finish and permanently engraved part numbers.

The solicitation (Number 6973GH-25-R-000172) requires vendors to manufacture and deliver the ladder kits to the Mike Monroney Aeronautical Center in Oklahoma City, with the first kit due within two months of contract award. The procurement is classified under NAICS code 332312 for Fabricated Structural Metal Manufacturing, with a size standard of 500 employees. Vendors must be registered in the System for Award Management (SAM) and submit proposals by June 11th, 2025 at 2 PM. The contract includes a one-year warranty for all parts, ensuring they conform to contract requirements and are free of design, material, and workmanship defects.

View the file

Other files

File Type Posted
ASR11 Ladder Kit Material Weights.pdf PDF
Sol_6973GH-25-R-00172.pdf PDF
STD-D-ASR11.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FAA Logistics Center AJW-L500 Product Services Group ASR-11 Ladder Kits Purchase

1. Background

The Federal Aviation Administration (FAA) AJW-L500 Product Services Group has been tasked with upgrading the fall protection on the Airport Surveillance Radars (ASR). The current ladder and ladder safety system (LSS) on the back of the ASR sails are no longer compliant with Environmental Occupational Safety and Health (EOSH) Services (AJW-231). AJW-L500 is going to replace existing non-compliant ASR-11 and ASR-8/9 ladders and LSS’ with new EOSH approved fall protection systems. This system replacement will greatly reduce the risk from a fall from heights while FAA employees are performing maintenance on these systems and ensure employees have compliant fall protection systems available to perform work.

2. Purpose

The purpose of this Statement of Work (SOW) is to document the requirements for the manufacturing of the fall protection system needed for the ASR-11s. This SOW also covers the purchasing of the Mine Safety Appliance (MSA) items needed for the LSS. The fall protection systems will be installed by trained FAA Engineering and Electronic Technicians. This contract is for production of 25 ladder kits.

3. Scope of Work

3.1 Manufacture and Purchase Services

Under the direction of the Contracting Officer (CO), by means of a task order, the vendor must manufacture and purchase the following items. The attached Construction Drawings and Material Weight list will be the best explanation of what is needed for the design criteria and codes. The line items listed below in Table 1 are what is required for 1 complete kit. This SOW will be to manufacture and deliver 25 of these complete kits.

Table 1

Line Item
Description
1
A newly manufactured aluminum ladder that will be attached on the back of the antenna radar sail, plus all the hardware.
2
New MSA Dyna-glide Notched Rail (PN 506270) will need to be attached to the new ladder, along with additional MSA hardware
3
New MSA Gated Bottom End Stop Assembly (PN 506275) will need to be attached to the bottom of the new ladder.
4
New MSA Gated Top End Stop Assembly (PN 506274) will need to be attached to the top of the new ladder.
5
Two newly manufactured aluminum ladder side rail connectors, BR1 and BR2, plus hardware. To include the Ball Locking, Button Handle Pushpin with tethered lanyard.
6
Two newly manufactured upper and lower aluminum HSS tubes, plus hardware. To include the 2” thick spacers.
7
All manufactured parts must be permanently engraved with the part number that corresponds to the approved shop drawings.
8
Purchase 4 DBI-SALA Anchor Point D-Rings, to be added to the kit.
9
All aluminum will need to have a clear anodic finish.

3.1.1 Specifications

All manufactured and purchased parts will need to adhere to the “General Notes” on page 2 of the Construction Drawings. All design criteria, codes and standards must be followed.

3.2 Shipment

The vendor will be responsible for shipment of the kits to the Mike Monroney Aeronautical Center (MMAC) in Oklahoma City. The first ladder kit will need to be received no later than 2 months after the contract award, this is negotiable depending on how long it takes to manufacture. Approval of the first ladder kit will be required by the FAA. Additional ladder kits should not be manufactured until FAA approval is received. After approval given the other ladder kits will need to be shipped two or more at a time spaced out over 3 to 4 weeks after the first kit is received. Past kits have been shipped on wood pallets and wrapped in foam. Below is a step-by-step guide to help with the process.

· Ensure the pallet is appropriately sized for the parts, allowing some space for cushioning.

· Use sturdy wood, like plywood or solid lumber, that can withstand the weight and handling of the parts.

· Ensure all items are clean and in good condition. Remove any loose components that might get damaged.

· Use foam or bubble wrap to cushion the items. Wrap each part individually and place padding between them.

· Ensure that items are secured in place to prevent movement during shipping. You can use straps or additional padding.

· Place heavier items at the bottom and lighter ones on top. Keep the center of gravity low.

· Select a shipping carrier known for handling freight and ensure they can accommodate your pallets size and weight.

· Include a tracking number for monitoring during transit.

3.5 Point of Contact

The vendor must provide a single point of contact for all matters related to this contract.

4.0 Warranty

The vendor warrants that all parts conform to the contract requirements and construction drawings. The vendor also warrants that parts are free of defects in design, materials, and workmanship. All parts will have a one-year warranty. The FAA will give written notice of any defect or nonconformance to the vendor within a reasonable period after the discovery.

File details come from the government source that posted it. Updated .